310-388-3397
Get free consultation

A Better Way to Remodel in Los Angeles

Your dream home built by one award-winning team, in record time.

Build or remodel with the confidence of a design-build process refined over 10+ years to eliminate delays, stress, and uncertainty.

  • No-Obligation
  • Transparent Roadmap
  • Clear Timeline & Budget
Kitchen with a skylight, green glass pendants and a marble island in our Arcadia home remodel
Modern white kitchen with a dark wood island and wall ovens in our South Pasadena remodel
Kitchen with sage green cabinets, a white island with stools and globe pendants in Culver City
Navy blue ADU kitchen with open shelves, a stainless refrigerator and a front-load washer in Tarzana
Living room with a white sofa, fireplace and dark ceiling beams in our Los Angeles new construction
  • 200+

    Happy customers across Los Angeles

  • Family-Owned

    And operated with owners on every job

  • 10+

    Years remodeling Los Angeles homes

  • Fully In-House

    Permits to finishes handled by one team

Our Services

Crafting Calm, Precise Remodels for Real Los Angeles Living

Every service is planned through one connected path: scope, design, permitting, construction, scheduling, and final care.

Learn moreLearn more

Why Choose Us

Discover Why 70%+ of Our Work Comes from Word of Mouth

We keep permits, budget, timeline, and communication connected through one accountable process.

Learn moreLearn more

Permits, Plans, and City Coordination

Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.

  • We review permit needs early.
  • We coordinate plans and documentation with the remodel scope.
  • We treat inspections as part of the process, not an afterthought.
  • We connect design decisions to build requirements through one accountable team.
Get My Free Estimate

Scope Clarity Before Construction

Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.

  • We discuss the scope before work begins.
  • We clarify material priorities early.
  • We surface potential cost drivers during planning.
  • We explain changes before moving forward.
Get My Free Estimate

A Schedule Based On Real Work

We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.

  • We connect milestones to actual work phases.
  • We coordinate trades through one accountable team.
  • We communicate delays and decisions clearly.
  • We include the final walkthrough in the schedule.
Get My Free Estimate

Communication Without Chasing

You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.

  • We provide regular updates during active work.
  • We clarify the decisions you need to make next.
  • We keep design and construction connected through one team.
  • Our owners stay involved through key project moments.
Get My Free Estimate

Our Projects

Homes Their Owners Are Proud to Show

Every home here started where you are now: a layout that stopped working and a first conversation. This is where they ended up.

See all projectsSee all projects
White kitchen with a long quartz island and brass lantern pendants in our Northridge home remodel

01

Complete Home Remodel & Room Addition in Northridge

  • Relocated powder room away from the front entry
  • Open-concept first-floor layout
  • Room addition for more usable square footage
  • Expanded kitchen and entertainment space
  • Classic white Shaker cabinetry with brass hardware
Get My Free EstimateMore details
Kitchen with a skylight, green glass pendants and a marble island in our Arcadia home remodel

02

Kitchen Remodel in Arcadia

  • Side and rear additions incorporated into the home
  • Relocated kitchen for a better connection to entertaining areas
  • New functional laundry room and guest powder room
  • White Shaker cabinetry with a full-height backsplash
  • Black grid windows and engineered hardwood flooring
Get My Free EstimateMore details
Modern ADU with dark metal siding, a long clerestory window and a white stucco entry

03

ADU Construction in Culver City

  • Two-story new-construction ADU on the former pool site
  • Gray Shaker cabinetry with black quartz countertops
  • High ceilings on both floors
  • Space-saving barn doors at the powder room and upstairs laundry
  • Smooth stucco and metal siding exterior
Get My Free EstimateMore details
Garage converted to a studio with a kitchenette and sliding closet doors in Culver City

04

Garage Conversion in Culver City

  • Garage conversion into a flexible guest ADU
  • 12-foot multi-slide door connecting indoors and outdoors
  • Full kitchen and bathroom
  • Flat-panel white cabinetry
  • Open layout designed for everyday living and entertaining
Get My Free EstimateMore details
Bright family room addition with a large sectional sofa and wide windows in Woodland Hills

05

Room Addition in Woodland Hills

  • Second-story addition constructed above the garage
  • Dedicated teen and family recreation loft
  • Exterior and roofline matched to the original home
  • Full roof replacement across the existing home and addition
  • Coordinated flooring and interior finish selections
Get My Free EstimateMore details
White kitchen with a long island and built-in refrigerator in our Culver City custom home

06

Custom Home Construction in Culver City

  • Near-complete demolition and full-home reconstruction
  • Rebuilt rear living space for future multigenerational use
  • Added powder room and pantry for improved function
  • Custom double-tier kitchen cabinetry
  • T-shaped island extension with table-style seating
Get My Free EstimateMore details

Our Story

Built by Eli. Designed with Donna. Managed by One Accountable Team.

Welcome to our family. We’re Eli and Donna, the husband-wife team behind every Quality First Builders project. For over a decade, we’ve guided Los Angeles homeowners through home transformations they’ll love for generations to come.

Learn moreLearn more
More about us
Eli and Donna of Quality First Builders in a completed Los Angeles kitchen

The Quality First Difference.

  • Owner involvement from planning through construction
  • Design guidance connected to real build decisions
  • In-house coordination for scope, schedule, permits, and construction
  • Licensed, bonded, and insured crews
  • Regular communication during the remodel
  • Detail-focused finish work
  • A final walkthrough before completion

Our Process

How We Bring Visions to Life

Five steps that keep scope, design, permits, construction, and final review connected.

Learn moreLearn more
  1. Scope Review and Consultation

    We start by understanding what you want to change, what is not working in the current home, how you want to live in the finished space, and what constraints may affect the project. This is where we discuss goals, rough scope, timeline expectations, design needs, permit considerations, and whether the project is a good fit.

  2. Design, Scope, and Budget Planning

    Once the project direction is clear, Quality First Builders helps organize the design and scope. Donna helps homeowners make design choices that fit the home and lifestyle. Eli helps connect those choices to the construction realities.

  3. Plans, Permits, and Schedule

    If the project requires drawings, permits, inspections, or city coordination, those steps are built into the plan. Quality First Builders organizes the schedule around the real work sequence, not a vague promise.

  4. Construction and Updates

    The construction phase is managed by an accountable team that keeps the work moving, coordinates trades, and keeps you informed as milestones are reached.

  5. Final Walkthrough and Completion

    At the end of the project, we review the finished work with you, handle final details, and make sure the result feels right before calling the remodel complete.

FAQ

The Small Details That Make a Difference

Do I need permits for a home remodel in Los Angeles?

Many Los Angeles home remodels require permits, especially when the project involves structural changes, electrical, plumbing, mechanical work, additions, garage conversions, or major layout changes. Quality First Builders reviews permit needs during planning so the project can move forward correctly.

How long does a home remodel take?

The timeline depends on the size and complexity of the remodel, permit requirements, material selections, and whether the work is phased or full-scope. During planning, Quality First Builders helps set realistic expectations instead of giving a vague promise that falls apart later.

Can Quality First Builders help with design?

Yes. Quality First Builders connects design guidance to real construction decisions, so layout, materials, finishes, and scope can be planned with buildability in mind.

Does Quality First Builders handle permits and inspections?

For projects that require permits, Quality First Builders coordinates the planning and construction process around those requirements. Permit needs, drawings, plan check, inspections, and schedule implications are reviewed as part of the remodel path.

What types of home remodeling projects are a good fit?

Whole-home remodels, kitchen remodels, bathroom remodels, ADUs, additions, garage conversions, and larger construction projects are the best fit for the team.

Is Quality First Builders a good fit for small repairs?

Quality First Builders is usually best suited for planned remodels and construction scopes rather than isolated small repairs or handyman-style tasks.

How does Quality First Builders help control budget surprises?

The team works to clarify scope, finish decisions, permitting needs, and construction realities before work begins, so the budget is tied to a more complete plan.

Will I get updates during construction?

Yes. Communication is part of the process, with project updates and next decisions kept visible so homeowners are not left guessing what is happening.

Get My Free Consultation

Get a Clear Plan From Idea to Done

You do not need to figure out the scope, design path, permit needs, timeline, and construction process alone.

Learn moreLearn more