
Donna Ezra
Founder, Lead Designer
Donna grew up watching her father run jobs as a general contractor and architect, and never seriously considered another line of work. She studied interior design and architecture at UCLA, then sharpened her eye on construction sites rather than in showrooms. Hand her a long list of choices and she hands back a clear direction: lighting, color, texture, fixtures, and how a room will actually be used. She also trained in feng shui, which shows up in how she balances a space. One client’s phrase became her unofficial title: the one to get it done.












