Founder and General Contractor
Eli Ezra

Eli has built homes in Los Angeles since 2005. He founded Quality First Builders and holds its general building license. He still walks every job site.
- CSLB license #990316
- Building since 2005
- 200+ Los Angeles homeowners
About Eli Ezra
Eli Ezra builds every home the way he'd want his own built. He's the founder and general contractor of Quality First Builders and has worked in construction since 2005.
He started on the tools, installing cabinets and tile. Within two years, he was running projects. For more than six years, he managed 20 to 25 jobs a month. That's where he learned exactly where projects go wrong and how to stop problems before they cost a client time or money.
In 2014, he opened Quality First Builders with his wife, designer Donna Ezra. The company is licensed and bonded under California license #990316. Since then, they've built for more than 200 Los Angeles homeowners.
Eli still walks every site. If something isn't right, his crew redoes it, even work the client never noticed. His favorite part of the job is sitting down with clients to shape the design, then handing over a finished home that looks the way they pictured it.
Eli also writes the construction guides on this site so you can see real costs and tradeoffs before you hire anyone.
Licenses and credentials
California license #990316
Class B General Building license, issued in 2014. Active and bonded with the Contractors State License Board.
Verify the licenseBetter Business Bureau profile
Quality First Builders has a public profile with the BBB. Read the reviews and the company record for yourself.
See the BBB profileBuilding since 2005
More than 20 years on job sites, including six years running 20 to 25 projects a month as a project manager.
Read his guides
In the news
The Real Cost of a Kitchen Remodel in Los Angeles, According to the Pros
Eli breaks down what drives the price of a Los Angeles kitchen: the layout, moves to plumbing and electrical systems, the cabinets, and the finish level. Change what the project touches and you change the price.
Read the article
How Much Does It Cost to Build a House in Los Angeles?
Eli walks through the cost of building a new house in Los Angeles, starting at $400 to $600 per square foot before land.
Read the article
What a Kitchen Remodel Really Costs in Los Angeles in 2026
Eli explains why scope matters more than finishes and why the cheapest kitchen quote often leaves out work you pay for later.
Read the article
ADU Design Ideas: 10 Modern Plans for Inspiration
Ten ADU ideas drawn from real Quality First Builders projects, with Eli's advice on making a small unit live like a full home.
Read the article
