“They brought my vision to life, fixed what others had broken, and helped me trust in the process again.”

200+
Happy customers across Los Angeles

Family-Owned
Eli and Donna stay involved

Owner-Led
From planning through final care

Fully In-House
Design through final care with one team
Planning an ADU
Your Backyard Could Be Earning Rent by Next Year
Calabasas gives you two ways to get an accessory dwelling unit (ADU) approved: a free city pre-approved plan, or a custom design by a licensed design professional in California. Either way, the city checks zoning and setbacks before a tenant pays rent or family moves in. One in-house team carries all of it for you, including:
- A feasibility check of your lot against the city's custom ADU checklist, before anyone draws plans
- Plans and permit applications filed through the city's online portal, with updates at every milestone
- A defined scope, budget, and schedule before crews start
- Our own licensed, bonded, and insured crews doing the building
- A legal, rent-ready finish, backed by a 3-year warranty
You choose who the space is for. We clear the path to move-in day.
Plan My Calabasas ADU
ADU Types We Build
Choose the ADU That Fits Your Lot and Goals
Lot shape, zoning, and budget point to the right type. We build every one of them with the same in-house team.
Learn moreLearn more
Detached ADUs
A standalone backyard unit of up to 1,200 square feet, for rent or family privacy.

Attached ADUs
An extension of the main home when yard space is tight.

Garage Conversions
An existing structure, faster approvals, and quicker time to rent.

Junior ADUs
A junior ADU (JADU) of up to 500 square feet inside your house, with its own entrance.

Two-Story ADUs
More livable space on narrow lots, without growing the footprint.

Above-Garage ADUs
A full living unit built over your garage that keeps your yard open.
Why Choose Us
Discover Why 70%+ of Our Work Comes from Word of Mouth
Permits, Plans, and City Coordination
Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.
- We review permit needs early.
- We coordinate plans and documentation with the remodel scope.
- We treat inspections as part of the process, not an afterthought.
- We connect design decisions to build requirements through one accountable team.
Scope Clarity Before Construction
Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.
- We discuss the scope before work begins.
- We clarify material priorities early.
- We surface potential cost drivers during planning.
- We explain changes before moving forward.
A Schedule Based On Real Work
We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.
- We connect milestones to actual work phases.
- We coordinate trades through one accountable team.
- We communicate delays and decisions clearly.
- We include the final walkthrough in the schedule.
Communication Without Chasing
You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.
- We provide regular updates during active work.
- We clarify the decisions you need to make next.
- We keep design and construction connected through one team.
- Our owners stay involved through key project moments.
ADU Projects
Homes Their Owners Are Proud to Show
See what the Quality First commitment looks like in practice, from garage conversions to detached backyard units.
See All ProjectsSee All ProjectsOur Story
One Team Shapes the Plan and Builds the Space

What the Connected Team Handles
- Goals and property fit.
- Layouts and design direction.
- Plans and approvals.
- Materials and key selections.
- Construction and active-work updates.
- Final walkthrough and care.
- Written warranty support.
Our Process
A Clear Path From First Idea to Finished ADU
One process connects fit, design, approvals, selections, construction, and final care.
Learn moreLearn moreScope Review and Consultation
We start with your lot and your goal: rental, family, or flexibility. Then we check the city's custom ADU checklist with you. Questions 1 to 8 need a yes before an application can move forward.
Design, Scope, and Budget Planning
The design squeezes real living from compact square footage: storage, light, privacy. If a city pre-approved plan fits your goal, we tell you. Every choice gets priced against utilities and structure as it is made.
Plans, Permits, and Schedule
Planning, Building and Safety, and Public Works all review a custom Calabasas ADU. We file one complete package online, answer every review comment, and bring you only the decisions that need your input.
Construction and Updates
Construction runs on our own crews, not a chain of subcontractors, with daily updates. Each inspection lands on schedule because the sequence plans for it.
Final Walkthrough and Completion
The final walkthrough covers kitchen, bath, systems, and finishes. Qualifying projects close with a 3-year warranty in writing, and we explain how to care for it.
FAQ
Clear Answers Before You Commit
Learn about proof, timing, warranty, plans, costs, design, updates, and final care.
Learn moreLearn moreWhat ADU project proof can I review?
Our closest finished ADUs sit right next to Calabasas. On Exhibit Place in Woodland Hills, we built Nancy a new home from the ground up in her family's backyard, near the property line and planned for light and privacy. It was done in time for her wedding in that yard. On Victory Boulevard in West Hills, we built the Bowmans a full unit with a kitchen and bathroom over their garage. Both are in the project gallery on this page.
What do the 90-day offer and warranty cover?
The 90 days covers qualifying ADU construction after permits or approvals and site readiness. It excludes the design and approval period. Qualifying projects include a 3-year warranty, and we explain the written coverage before work begins.
Do I need finished plans before I call?
No. Your property and your goals are enough to start. If you already have plans, bring them. The Bowmans in West Hills came to us with finished plans and a permit close to expiring, and Eli pulled the permit within weeks. In Calabasas you can also start from one of the city's free pre-approved plans: a studio, a one-bedroom, or a two-bedroom, each in three exterior styles. The city says those plans cut pre-construction fees and review time.
Who builds the ADU?
Our own crews, under our California contractor license. We are a licensed general contractor and ADU builder in one company, so plans, permitting, inspections, and construction stay connected. No handoffs between separate contractors or a chain of subcontractors.
Can an ADU support rental use or family housing?
When the property and project qualify, rental use may be possible; we promise no income or returns. Just as often the unit houses parents, adult children, or a caregiver. Flexible housing is the constant either way.
What changes the cost?
Two early choices shape the price: the plan path and the size of what you build new. A city pre-approved plan skips most custom design work and lowers pre-construction fees, while a custom design fits your exact lot and layout. Converting a garage can reuse its walls and roof, while a detached unit of up to 1,200 square feet is all new construction. A junior ADU of up to 500 square feet inside your house gets its own entrance and a small kitchen. Site access and utility runs also matter on hillside lots. We give a written estimate once the scope is defined, and we explain what drives it.
What changes the schedule?
City review happens before construction starts, and Calabasas created its pre-approved plans to shorten it. A custom design is drawn to the ADU standards in the Calabasas Municipal Code and goes through Planning, Building and Safety, and Public Works. Each round of comments adds time, so we catch compliance issues before we submit. After permits and site readiness, qualifying construction falls under our 90-day offer.
Do you convert garages too?
Yes. Calabasas lets you create an ADU by converting an existing legal accessory structure, such as a garage, or by building an addition onto one. In Culver City, Scott's garage became a guest unit with a full kitchen, a full bathroom, and a 12-foot multi-slide door. Some properties suit an above-garage unit instead. The right route depends on the structure, the site, and approvals.
Do you only work in Calabasas?
No. We build ADUs for homeowners across the Los Angeles area. Our finished residential ADU projects include Woodland Hills, West Hills, Tarzana, Valley Village, and Culver City. More than a decade of ADU and remodeling experience travels with the same in-house crews to your Calabasas lot.
What happens after construction?
We complete a final walkthrough, review the finished space, and explain warranty care.
Free Consultation
Plan the Right ADU Path for Your Calabasas Property
Tell us who the ADU is for and what you want it to change. No finished plans are needed.
Learn moreLearn more









