310-388-3397
Get free consultation

The Better Way to Build an ADU in Studio City

Turn unused space into a real second home, in 90 days or less.

Build with the confidence of a design-build process refined over 10+ years to eliminate lot surprises, Studio City permit delays, and stalled construction.

  • No-Obligation
  • Transparent Roadmap
  • Clear Timeline & Budget
Open ADU living area with a blue kitchen island and a black sofa in our Tarzana ADU
Aerial view of a home with a backyard pool and a new two-story ADU in Valley Village
Bathroom with a green vertical tile shower, oval mirror and wood vanity in our Studio City remodel
  • 200+

    Happy customers across Los Angeles

  • Family-Owned

    Eli and Donna stay involved

  • Owner-Led

    From planning through final care

  • Fully In-House

    Design through final care with one team

Planning an ADU

Your Backyard Could Be Earning Rent by Next Year

Picture the finished unit: a tenant paying rent, or family living steps away. Your Studio City ADU application goes to LADBS, the city's building department. Once it is complete and a home stands on the lot, state law gives the city 60 days to approve or deny it, with no hearing. One in-house team carries everything until move-in day, including:

  • A feasibility check that shows exactly what your lot allows
  • Plans and permits handled for you, with updates at every milestone
  • A defined scope and budget, with a written schedule, before crews start
  • Our own bonded, insured crews, building under CSLB license #990316
  • A legal, rent-ready finish, backed by a 3-year warranty

You choose who the space is for. We clear the path to move-in day.

Plan My Studio City ADU
Completed ADU construction at Braddock Dr. in Culver City

ADU Types We Build

Choose the ADU That Fits Your Lot and Goals

Lot shape, zoning, and budget point to the right type. We build every one of them with the same in-house team.

Learn moreLearn more

Why Choose Us

Discover Why 70%+ of Our Work Comes from Word of Mouth

You want useful space. You should not have to coordinate every step alone.

Learn moreLearn more

Permits, Plans, and City Coordination

Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.

  • We review permit needs early.
  • We coordinate plans and documentation with the remodel scope.
  • We treat inspections as part of the process, not an afterthought.
  • We connect design decisions to build requirements through one accountable team.
Get My Free Estimate

Scope Clarity Before Construction

Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.

  • We discuss the scope before work begins.
  • We clarify material priorities early.
  • We surface potential cost drivers during planning.
  • We explain changes before moving forward.
Get My Free Estimate

A Schedule Based On Real Work

We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.

  • We connect milestones to actual work phases.
  • We coordinate trades through one accountable team.
  • We communicate delays and decisions clearly.
  • We include the final walkthrough in the schedule.
Get My Free Estimate

Communication Without Chasing

You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.

  • We provide regular updates during active work.
  • We clarify the decisions you need to make next.
  • We keep design and construction connected through one team.
  • Our owners stay involved through key project moments.
Get My Free Estimate

ADU Projects

Homes Their Owners Are Proud to Show

See what the Quality First commitment looks like in practice, from garage conversions to detached backyard units.

See All ProjectsSee All Projects
ADU kitchen with a herringbone tile island, copper pendants and a wine fridge in Valley Village

01

ADU Construction in Valley Village

    Get My Free EstimateMore details
    Compact blue ADU kitchen with a built-in washer and dryer in our Tarzana ADU

    02

    ADU Construction in Tarzana

      Get My Free EstimateMore details
      ADU kitchen with bright blue cabinets and stainless appliances in our West Hills ADU

      03

      ADU & New Construction in West Hills

        Get My Free EstimateMore details
        ADU kitchen with a white island, bar stools and blue tile backsplash in our Woodland Hills ADU

        04

        ADU Construction in Woodland Hills

          Get My Free EstimateMore details

          Our Story

          One Team Shapes the Plan and Builds the Space

          That connection helps the ADU feel complete and useful. We also has complete-home remodeling work in Studio City.

          Learn moreLearn more
          More about us
          Eli and Donna of Quality First Builders

          What the Connected Team Handles

          • Goals and property fit.
          • Layouts and design direction.
          • Plans and approvals.
          • Materials and key selections.
          • Construction and active-work updates.
          • Final walkthrough and care.
          • Written warranty support.

          Our Process

          A Clear Path From First Idea to Finished ADU

          One process connects fit, design, approvals, selections, construction, and final care.

          Learn moreLearn more
          1. Scope Review and Consultation

            We start with your lot and your goal: rental, family, or flexibility. We check the parcel on ZIMAS, the city's online zoning map, and flag hillside access or foundation needs before anyone draws.

          2. Design, Scope, and Budget Planning

            The design squeezes real living from compact square footage: storage, light, privacy. Every choice gets priced against utilities and structure as it is made.

          3. Plans, Permits, and Schedule

            Our permitting process starts with one complete plan set to LADBS. The city gets 15 business days to confirm it is complete, then 60 days to approve or deny it when a home already stands on the lot.

          4. Construction and Updates

            Our own crews build from foundation through framing to finishes, with daily updates, and each inspection lands on schedule. If the Department of Water and Power holds something up, Eli tells you why and the new timeline.

          5. Final Walkthrough and Completion

            Your ADU passes its final LADBS inspection before anyone moves in. Then we walk the kitchen and bath finishes with you, test the plumbing and electrical, and close qualifying projects with a 3-year written warranty.

          FAQ

          Clear Answers Before You Commit

          Learn about proof, timing, warranty, plans, costs, design, updates, and final care.

          Learn moreLearn more
          What ADU project proof can I review?

          Our nearest ADU project is right next door in Valley Village. The Oxnard Street ADU went from demolition through the foundation to the full structure on a very tight site. Its owners say their neighbors commented on how clean the crew kept it. We have also completed ADU projects in Tarzana, West Hills and Woodland Hills. All of them went through the same City of Los Angeles approval system as Studio City. Here in Studio City, we remodeled Mixtli and George's 1920s bungalow on Landale Street. Each project shows its real city and what we built, on this page and in our gallery.

          What do the 90-day offer and warranty cover?

          The 90 days covers qualifying ADU construction after permits or approvals and site readiness. It excludes the design and approval period. Qualifying projects include a 3-year warranty, and we explain the written coverage before work begins.

          Do I need finished plans before I call?

          No. The property and your goals are enough to start. Owners often call us before any designer or drawings. We look up your parcel on ZIMAS, the city's online zoning map, which lists the zoning regulations and overlay information for every parcel in Los Angeles. Studio City runs from flat Valley streets near Ventura Boulevard up into the hills, and a hillside lot changes site access and foundation work. Our feasibility review shows what your property allows before anyone draws.

          Who builds the ADU?

          Our own crews, under our California contractor license, CSLB #990316, Class B General Building. We are a licensed general contractor and ADU builder in one company, so plans and permitting stay connected to the inspections and the build. No handoffs between separate contractors or a chain of subcontractors.

          Can an ADU support rental use or family housing?

          Yes. California law lets you rent an ADU apart from your house, though in most cases you cannot sell it separately. A junior ADU rental has to run longer than 30 days. We promise no income or returns. Just as often the unit houses parents, adult children, or a caregiver.

          What changes the cost?

          Size and layout come first. On a Studio City hillside lot, foundation design and site access can add cost that a flat site does not carry. Long utility runs to the back of the yard add more. California's ADU rules can also cut two costs. An ADU needs no fire sprinklers unless your home requires them, and a garage conversion does not have to replace the parking it removes. We give a written estimate once the scope is defined, and we explain what drives it.

          What changes the schedule?

          Approvals, site readiness, utilities, scope, materials, each inspection, and outside agencies can affect timing. State law gives the city 60 days to approve or deny a complete ADU application when a home already stands on the property. ADU approval in California is ministerial: staff check your plans against written rules, with no hearing. We handle review comments and revisions. A complete first submittal is the time saver you control, and we catch compliance issues early, because the ones found late cause the longest delays. Hannah and Joshua came to us with plans drawn and their permit weeks from expiring. Eli took over right away, and their ADU finished within the timeframe we proposed.

          Do you convert garages too?

          Yes. A garage conversion is often the fastest ADU path. Converted within its existing footprint, a garage faces no new setback requirements, and the city cannot require you to replace the lost parking. If you tear down a detached garage to build new, the city reviews and issues the demolition permit together with the ADU approval. Some properties suit an above-garage unit instead, like the Victory Boulevard ADU we built for Hannah and Joshua.

          Do you only work in Studio City?

          No. We build ADUs in the neighborhoods around Studio City, including Sherman Oaks and Valley Village, and across the wider Los Angeles residential market. Inside the City of Los Angeles, every ADU goes through the same building department, so what we learn on one job carries to the next. More than a decade of ADU and remodeling experience travels with the same crews.

          What happens after construction?

          We complete a final walkthrough with you, review the finished space, and explain warranty care. Before that, inspectors hold your ADU to the same building codes as any home, and it must pass its final Los Angeles Department of Building and Safety (LADBS) inspection before anyone moves in.

          Free Consultation

          Start With Your Property and Your Goals

          Tell us who the ADU is for and what you want it to change. No finished plans are needed.

          Learn moreLearn more