310-388-3397
Get free consultation

The Better Way to Build an ADU in Burbank

Turn unused space into a real second home, in 90 days or less.

Build with the confidence of a design-build process refined over 10+ years to eliminate lot surprises, Burbank permit delays, and stalled construction.

  • No-Obligation
  • Transparent Roadmap
  • Clear Timeline & Budget
Open ADU living area with a blue kitchen island and a black sofa in our Tarzana ADU
Aerial view of a home with a backyard pool and a new two-story ADU in Valley Village
Backyard with an old blue detached garage before our ADU build in West Hills
  • 200+

    Happy customers across Los Angeles

  • Family-Owned

    Eli and Donna stay involved

  • Owner-Led

    From planning through final care

  • Fully In-House

    Design through final care with one team

Planning an ADU

Your Backyard Could Be Earning Rent by Next Year

Picture the finished unit: a tenant paying rent, or family living steps away. On most Burbank lots, a detached studio or one-bedroom ADU can reach 850 square feet, and a two-bedroom can reach 1,000. The Mountain Fire Zone caps any ADU at 800. As your ADU contractor, our in-house team carries the setbacks, utilities, plan check and city sign-offs, including:

  • A feasibility check that shows exactly what your lot allows, using Burbank's zoning, fire zone and transit maps
  • Plans and permits handled for you, with updates at every milestone
  • A defined scope and budget, with a written schedule, before crews start
  • Our own bonded and insured crews, building under CSLB license #990316
  • A legal, rent-ready finish, backed by a 3-year warranty

You choose who the space is for. We clear the path to move-in day.

Plan My ADU
Completed ADU construction at Braddock Dr. in Culver City

ADU Types We Build

Choose the ADU That Fits Your Lot and Goals

Lot shape, zoning, and budget point to the right type. We build every one of them with the same in-house team.

Learn moreLearn more

Why Choose Us

Discover Why 70%+ of Our Work Comes from Word of Mouth

You want useful space. You should not have to coordinate every step alone.

Learn moreLearn more

Permits, Plans, and City Coordination

Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.

  • We review permit needs early.
  • We coordinate plans and documentation with the remodel scope.
  • We treat inspections as part of the process, not an afterthought.
  • We connect design decisions to build requirements through one accountable team.
Get My Free Estimate

Scope Clarity Before Construction

Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.

  • We discuss the scope before work begins.
  • We clarify material priorities early.
  • We surface potential cost drivers during planning.
  • We explain changes before moving forward.
Get My Free Estimate

A Schedule Based On Real Work

We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.

  • We connect milestones to actual work phases.
  • We coordinate trades through one accountable team.
  • We communicate delays and decisions clearly.
  • We include the final walkthrough in the schedule.
Get My Free Estimate

Communication Without Chasing

You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.

  • We provide regular updates during active work.
  • We clarify the decisions you need to make next.
  • We keep design and construction connected through one team.
  • Our owners stay involved through key project moments.
Get My Free Estimate

ADU Projects

Homes Their Owners Are Proud to Show

See what the Quality First commitment looks like in practice, from garage conversions to detached backyard units.

See All ProjectsSee All Projects
ADU kitchen with a white island, bar stools and blue tile backsplash in our Woodland Hills ADU

01

ADU Construction in Woodland Hills

    Get My Free EstimateMore details
    ADU kitchen with bright blue cabinets and stainless appliances in our West Hills ADU

    02

    ADU & New Construction in West Hills

      Get My Free EstimateMore details
      Compact blue ADU kitchen with a built-in washer and dryer in our Tarzana ADU

      03

      ADU Construction in Tarzana

        Get My Free EstimateMore details
        ADU kitchen with a herringbone tile island, copper pendants and a wine fridge in Valley Village

        04

        ADU Construction in Valley Village

          Get My Free EstimateMore details

          Our Story

          One Team Shapes the Plan and Builds the Space

          That connection helps the ADU feel complete, useful, and ready for daily life.

          Learn moreLearn more
          More about us
          Eli and Donna of Quality First Builders

          What the Connected Team Handles

          • Goals and property fit.
          • Layouts and design direction.
          • Plans and approvals.
          • Materials and key selections.
          • Construction and active-work updates.
          • Final walkthrough and care.
          • Written warranty support.

          Our Process

          A Clear Path From First Idea to Finished ADU

          One process connects fit, design, approvals, selections, construction, and final care.

          Learn moreLearn more
          1. Scope Review and Consultation

            First question: what is this unit for? Rental, parents, guests, or work. Then a feasibility review maps what your lot and utilities allow.

          2. Design, Scope, and Budget Planning

            Donna designs a unit that lives bigger than its square footage. Eli prices utility runs, foundation and materials so the design survives the budget. We set ceilings to protect your allowed floor area.

          3. Plans, Permits, and Schedule

            We confirm zone, size and setbacks with Burbank's Planning Division. Building and Safety checks building codes; Burbank Water and Power, Public Works and Fire review the plans. We handle every correction.

          4. Construction and Updates

            Our own crews build the unit, foundation to finishes, with daily updates. We book each Burbank inspection before the stage it covers, so walls stay open until the inspector signs off.

          5. Final Walkthrough and Completion

            We close with a full-unit walkthrough and the written warranty coverage for qualifying projects. The space leaves our hands move-in ready.

          FAQ

          Clear Answers Before You Commit

          Learn about proof, timing, warranty, plans, costs, design, updates, and final care.

          Learn moreLearn more
          What ADU project proof can I review?

          Start with the four ADU projects in the project slides above. Of those, the closest to Burbank is Alissa's ground-up ADU on Oxnard Street in Valley Village. The lot was very tight, and her neighbors praised how clean our crew kept it. We also did ADU work as part of a complete home remodel on Huston Street in Sherman Oaks. Each project lists its real city and what we built.

          What do the 90-day offer and warranty cover?

          The 90 days covers qualifying ADU construction after permits or approvals and site readiness. It excludes the design and approval period. Qualifying projects include a 3-year warranty, and we explain the written coverage before work begins.

          Do I need finished plans before I call?

          No. Start with the property, your goals, and your questions. Many owners call before hiring a designer or drawing anything. We help define the next step, starting with what Burbank allows on your lot. The City of Burbank lets homeowners add an accessory dwelling unit on lots zoned for houses or apartments, and on any lot that already has a home on it. We also plan ceiling heights early, because Burbank counts floor area twice under any ceiling taller than 12 feet.

          Who builds the ADU?

          Our own crews, under our California contractor license, CSLB #990316, Class B General Building. We are a licensed general contractor and ADU builder in one company, so permitting and inspections stay tied to the crew doing the building. No handoffs between separate contractors or a chain of subcontractors.

          Can an ADU support rental use or family housing?

          An ADU may support future rental use when the property and project qualify; we do not promise income or returns. In Burbank, you do not have to live on the property to rent out an ADU. A junior ADU is different: the owner must live in the house or in the junior unit, and the city requires a covenant. Many owners build for parents, adult children, guests, or a caregiver instead. Either way, the unit adds flexible housing on property you already own.

          What changes the cost?

          Size and layout drive cost first. After that come utilities and site access, then your materials and cabinetry, and what the city requires. In Burbank, three local items can move the number: a parking space, if the city requires one; what Burbank Water and Power needs for the electric and water service; and the city's ADU impact fees. You can skip the parking space when your lot is within a half mile walk of public transit. We give a written estimate once the scope is defined, and we explain what drives it.

          What changes the schedule?

          Approvals, site readiness, utilities, scope, materials, each inspection, and outside agencies can affect your timeline. In Burbank, the kind of plans you use can change the permit wait. Under state law AB 1332, the city runs a preapproved ADU program to speed up permits when a preapproved design fits your lot. The city lists 30 business days for the first review of a preapproved plan, about six weeks, and 15 business days for each recheck. Its library includes a 432 square foot studio, and Burbank also accepts some Los Angeles preapproved plans. Custom plans and garage conversions go through regular plan check. Compliance issues found late slow things most, so we catch them early.

          Do you convert garages too?

          Yes. A garage conversion is often the fastest ADU path, and some properties support an above-garage unit instead, if the structure can carry it. In Burbank, a converted permitted garage keeps its legal setbacks. The garage door must come out and be replaced with windows or an entry door. Anything you add past the old footprint must meet the 4-foot side and rear setbacks, as must a new detached unit and the stair and landing of an above-garage unit. In the R-1-H horse-keeping zone, converting a permitted garage, a permitted guest house or part of the main house is the only way to add an ADU.

          Do you only work in Burbank?

          No. We serve the wider Los Angeles area, including Glendale and Pasadena. Our ADU work spans the San Fernando Valley, from Valley Village and Sherman Oaks to Van Nuys, Tarzana, Woodland Hills and West Hills, plus Culver City and West Los Angeles. More than a decade of ADU and remodeling experience travels with the same crews to your Burbank lot.

          What happens after construction?

          We complete a final walkthrough, review the finished space, and explain warranty care.

          Free Consultation

          Plan the Right ADU Path for Your Burbank Property

          Tell us who the ADU is for and what you want it to change. No finished plans are needed.

          Learn moreLearn more