310-388-3397
Get free consultation

The Better Way to Build an ADU in Pasadena

Turn unused space into a real second home, in 90 days or less.

Build with the confidence of a design-build process refined over 10+ years to eliminate lot surprises, Pasadena permit delays, and stalled construction.

  • No-Obligation
  • Transparent Roadmap
  • Clear Timeline & Budget
Open ADU living area with a blue kitchen island and a black sofa in our Tarzana ADU
Aerial view of a home with a backyard pool and a new two-story ADU in Valley Village
Backyard with an old blue detached garage before our ADU build in West Hills
  • 200+

    Happy customers across Los Angeles

  • Family-Owned

    Eli and Donna stay involved

  • Owner-Led

    From planning through final care

  • Fully In-House

    Design through final care with one team

Planning an ADU

Your Backyard Could Be Earning Rent by Next Year

Picture the finished unit: a tenant paying rent, or family living steps away. Pasadena allows an accessory dwelling unit on residential lots with a house or apartment building, historic districts included. Between you and move-in day sit setbacks, plan check, and Pasadena Water and Power sign-offs. As your ADU contractor, our in-house team carries all of it for you, including:

  • A feasibility check that shows exactly what your lot allows, from historic status to transit distance
  • Plans and permits handled for you, with updates at every milestone
  • A defined scope and budget, plus a schedule, before crews start
  • Our own bonded and insured crews, building under CSLB license #990316
  • A legal, rent-ready finish, backed by a 3-year warranty

You choose who the space is for. We clear the path to move-in day.

Plan My Pasadena ADU
Completed ADU construction at Braddock Dr. in Culver City

ADU Types We Build

Choose the ADU That Fits Your Lot and Goals

Lot shape, zoning, and budget point to the right type. We build every one of them with the same in-house team.

Learn moreLearn more

Why Choose Us

Discover Why 70%+ of Our Work Comes from Word of Mouth

You want useful space. You should not have to coordinate every step alone.

Learn moreLearn more

Permits, Plans, and City Coordination

Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.

  • We review permit needs early.
  • We coordinate plans and documentation with the remodel scope.
  • We treat inspections as part of the process, not an afterthought.
  • We connect design decisions to build requirements through one accountable team.
Get My Free Estimate

Scope Clarity Before Construction

Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.

  • We discuss the scope before work begins.
  • We clarify material priorities early.
  • We surface potential cost drivers during planning.
  • We explain changes before moving forward.
Get My Free Estimate

A Schedule Based On Real Work

We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.

  • We connect milestones to actual work phases.
  • We coordinate trades through one accountable team.
  • We communicate delays and decisions clearly.
  • We include the final walkthrough in the schedule.
Get My Free Estimate

Communication Without Chasing

You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.

  • We provide regular updates during active work.
  • We clarify the decisions you need to make next.
  • We keep design and construction connected through one team.
  • Our owners stay involved through key project moments.
Get My Free Estimate

ADU Projects

Homes Their Owners Are Proud to Show

See what the Quality First commitment looks like in practice, from garage conversions to detached backyard units.

See All ProjectsSee All Projects
ADU kitchen with a herringbone tile island, copper pendants and a wine fridge in Valley Village

01

ADU Construction in Valley Village

    Get My Free EstimateMore details
    Compact blue ADU kitchen with a built-in washer and dryer in our Tarzana ADU

    02

    ADU Construction in Tarzana

      Get My Free EstimateMore details
      ADU kitchen with bright blue cabinets and stainless appliances in our West Hills ADU

      03

      ADU & New Construction in West Hills

        Get My Free EstimateMore details
        ADU kitchen with a white island, bar stools and blue tile backsplash in our Woodland Hills ADU

        04

        ADU Construction in Woodland Hills

          Get My Free EstimateMore details

          Our Story

          One Team Shapes the Plan and Builds the Space

          That connection helps the ADU feel complete and useful. We also has remodeling work in Pasadena.

          Learn moreLearn more
          More about us
          Eli and Donna of Quality First Builders

          What the Connected Team Handles

          • Goals and property fit.
          • Layouts and design direction.
          • Plans and approvals.
          • Materials and key selections.
          • Construction and active-work updates.
          • Final walkthrough and care.
          • Written warranty support.

          Our Process

          A Clear Path From First Idea to Finished ADU

          One process connects fit, design, approvals, selections, construction, and final care.

          Learn moreLearn more
          1. Scope Review and Consultation

            First question: what is this unit for? Rental, parents, guests, or work. Then a feasibility review maps what your lot and utilities allow.

          2. Design, Scope, and Budget Planning

            Donna designs a unit that lives bigger than its square footage. Eli prices the utility runs, foundation and every material. Stay at 900 square feet or less to skip Pasadena's Residential Impact Fee.

          3. Plans, Permits, and Schedule

            We file your plans on the city's online permit portal and apply for the unit's own address. Then we clear Pasadena Water and Power, LA County Sanitation and SoCalGas.

          4. Construction and Updates

            Our own crews build the unit, foundation to finishes, with daily updates. We book each inspection ahead of its stage, and the final sign-off leads to utility hookups and your Certificate of Occupancy.

          5. Final Walkthrough and Completion

            We close with a full-unit walkthrough and the written warranty coverage for qualifying projects. The space leaves our hands move-in ready.

          FAQ

          Clear Answers Before You Commit

          Learn about proof, timing, warranty, plans, costs, design, updates, and final care.

          Learn moreLearn more
          What ADU project proof can I review?

          Start with the four ADUs on this page, from Valley Village, Tarzana, West Hills and Woodland Hills. Our Pasadena work so far is remodeling. On North El Molino Avenue we redid Melanie's two bathrooms, and Donna used the specs from Eli's plans to help her order everything she needed. On Vista Avenue we built a galley kitchen.

          What do the 90-day offer and warranty cover?

          The 90 days covers qualifying ADU construction after permits or approvals and site readiness. It excludes the design and approval period. Qualifying projects include a 3-year warranty, and we explain the written coverage before work begins.

          Do I need finished plans before I call?

          No. Start with the property, your goals, and your questions. Many owners call before hiring a designer or drawing anything. We check your lot first: a new unit generally sits at least 4 feet from the side and rear property lines, and 5 feet where that wall has a window or door. Then we help define the next step.

          Who builds the ADU?

          Our own crews build it, under our California contractor license, CSLB #990316, Class B General Building. One company carries permitting and inspections through to construction, so nothing gets handed between separate contractors.

          Can an ADU support rental use or family housing?

          An ADU may support future rental use when the property and project qualify; we do not promise income or returns. State law bars Pasadena from requiring you to live on the property to rent out an ADU, though the city can require rentals of 30 days or longer. A junior ADU that shares a bathroom with the house is different: the owner must live in the house or the junior unit. Many owners build for parents, adult children, guests, or a caregiver instead. Either way, the unit adds flexible housing on property you already own.

          What changes the cost?

          Size and layout lead, then utilities, site access, materials and the city's requirements. On a single family lot, Pasadena adds three rules that move the number. A unit of 900 square feet or less skips the Residential Impact Fee and gets 25% off three city permit fees. A city Housing Agreement halves plan check fees at any size. You sign it before the permit is issued, and it commits the unit for at least 7 years to family or an income-qualified renter. And the construction and demolition deposit drops to $1,000. Your property taxes will also rise, as set by the Los Angeles County Assessor. A written estimate follows a defined scope, with the drivers explained.

          What changes the schedule?

          Approvals, site readiness, utilities, scope, materials, each inspection, and outside agencies can affect your timeline. In Pasadena, the plan path matters too. The city offers one free standard plan, a 374 square foot studio updated to the 2025 building code. On a single family lot, it saves design time and halves plan check fees. Any change, however small, sends it back to full plan review. It also only works for a new detached unit on a lot without a slope. The city's older standard plans expired on December 31, 2025, and new applications can use them only for homes red-tagged in the Eaton Fire. Compliance issues found late slow things most, so we catch them early.

          Do you convert garages too?

          Yes. Converting a garage is often the quickest route to a legal ADU; some lots support an above-garage unit instead. Which one fits depends on the structure and the site. In Pasadena, a unit built inside existing walls needs no new parking space. A conversion needs its own plans, because the city's standard plans cover new detached units only.

          Do you only work in Pasadena?

          No. We serve the wider Los Angeles area, including South Pasadena and Altadena. On Flores De Oro in South Pasadena we finished two complete home remodels, one with a room addition. Our ADU work spans the San Fernando Valley, from Valley Village and Sherman Oaks to Van Nuys, Tarzana, Woodland Hills and West Hills, plus Culver City and Los Angeles. More than a decade of ADU and remodeling experience travels with the same crews to your lot.

          What happens after construction?

          A final walkthrough closes the build. We review the finished space together and explain warranty care.

          Free Consultation

          Start With Your Property and Your Goals

          Tell us who the ADU is for and what you want it to change. No finished plans are needed.

          Learn moreLearn more