“Everything they said they would do, they did. In construction, that kind of consistency can be rare, and I really appreciated their professionalism and follow-through.”

200+
Happy customers across Los Angeles

Family-Owned
And operated with owners on every job

10+
Years remodeling Los Angeles homes

Fully In-House
Permits to finishes handled by one team
Planning a Bathroom Remodel
A Calm, Finished Bathroom, With Nothing Left to Chase
A bathroom remodeling plan connects the room you want with the work behind the walls. New tile and better storage need to fit the shower you use each morning. Waterproofing and plumbing belong in those decisions from the start. One in-house team handles it, including:
- Design support that pulls tile, stone, and fixtures together
- A contract that spells out exactly what happens, and when
- Waterproofing, plumbing, and electrical by our own licensed crews
- A clean, protected jobsite in the middle of your home
- A final walkthrough where every fixture meets the standard
You choose how it looks and feels. We handle everything behind the walls.
Plan My Bathroom
Bathroom Services
From Full Remodels to High-Impact Updates

Full Bathroom Remodels
A full bathroom renovation connects the layout and waterproofing to tile installation and the fixtures you use every day.

Shower Conversions
Replace a bathtub with a shower. Plan frameless glass and a curbless entry around the room's layout and agreed scope.

Comfort Upgrades
Heated floors, double vanities, and rain showers built in.

Small Bathroom Remodels
Smart layouts and storage that make tight spaces live large.

Aging-in-Place Bathrooms
Safer layouts and fixtures without the clinical look.

Powder Room Updates
High-impact refreshes with minimal disruption to your home.
Why Choose Us
Discover Why 70%+ of Our Work Comes from Word of Mouth
Permits, budget, timeline, and communication stay connected through one accountable process.
Learn moreLearn morePermits, Plans, and City Coordination
Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.
- We review permit needs early.
- We coordinate plans and documentation with the remodel scope.
- We treat inspections as part of the process, not an afterthought.
- We connect design decisions to build requirements through one accountable team.
Scope Clarity Before Construction
Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.
- We discuss the scope before work begins.
- We clarify material priorities early.
- We surface potential cost drivers during planning.
- We explain changes before moving forward.
A Schedule Based On Real Work
We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.
- We connect milestones to actual work phases.
- We coordinate trades through one accountable team.
- We communicate delays and decisions clearly.
- We include the final walkthrough in the schedule.
Communication Without Chasing
You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.
- We provide regular updates during active work.
- We clarify the decisions you need to make next.
- We keep design and construction connected through one team.
- Our owners stay involved through key project moments.
Bathroom Projects
Homes Their Owners Are Proud to Show
The Pasadena project remodeled two bathrooms with different styles. In Silver Lake, an office became a second bathroom inside the existing home. Open the project cards to see the work.
See all projectsSee all projectsOur Story
Eli Leads the Build. Donna Guides the Design Decisions.
Eli leads construction around the agreed scope and budget. Donna guides the design choices. For the Braddock Drive bathroom, that included helping the homeowners find a style they liked.
Learn moreLearn more
What That Means for Your Bathroom
- A design direction grounded in the way you want the room to feel and function
- Owner involvement from priorities through closeout
- Visible finishes connected to hidden construction scope
- Permits, scheduling, trades, and selections coordinated in-house
- Daily updates and clear next decisions
- Careful protection and detail review during active work
- A final walkthrough before completion
Our Process
How We Bring Your Bathroom Remodel to Life
Five steps keep planning, design, permits, construction, and final review connected.
Learn moreLearn moreScope Review and Consultation
We start in the bathroom itself: what leaks, what crowds, what never worked. You bring the vision for the room; we map the plumbing, ventilation, and layout realities behind it.
Design, Scope, and Budget Planning
Donna helps select materials for a wet room, including tile and stone. Glass and flooring choices stay tied to daily use. Eli prices the waterproofing and structure behind the finishes so the budget accounts for that work. At El Molino Avenue, Donna helped order fixtures and tile using Eli's plans.
Plans, Permits, and Schedule
Quality First Builders Inc holds California Class B general building contractor license #990316. We plan the sequence for permits, plumbing plans and inspections before demolition. One company coordinates that work within the agreed scope.
Construction and Updates
Demolition, waterproofing, tile, and fixtures follow a strict order, because bathrooms punish shortcuts. Our own crews do the work, with daily updates and a protected path through your home.
Final Walkthrough and Completion
The walkthrough checks the craftsmanship where it counts: grout lines, glass seals, drainage, and every fixture. A bathroom is finished when it works at 6 a.m., not when the photos look good.
FAQ
Bathroom Design, Hidden Conditions, Cost Drivers, Permits, and Updates
Understand the risks behind the finish and how one fully in-house team keeps the better daily outcome in view.
Learn moreLearn moreWhat kinds of bathroom projects are a fit?
We take on substantial bathroom remodels, bathroom additions, and bathroom work inside larger home projects. The first conversation covers the property, what you want, the likely scope, and whether we fit each other.
Do I need a finished design before contacting you?
No. Start with what is not working, the routines you want the room to support, and any inspiration you have. Donna guides the design direction while the team ties it to scope and construction.
Can you help make a bathroom feel calmer and more organized?
Yes. We plan circulation and privacy alongside lighting and storage. The vanity and countertops need to work with fixture placement, with surfaces chosen as part of the same design. Those decisions shape how you use the room during the morning rush.
How do you address hidden water, plumbing, or ventilation concerns?
We review visible conditions and known concerns during planning. Layout choices affect the plumbing and ventilation, along with the substrate beneath the finishes. Demolition can reveal hidden damage. At Morro Drive, removing the old toilet exposed subfloor rot. Eli explained the problem and walked the homeowner through the options. We review new findings with you before the related work proceeds.
Will my bathroom remodel need permits?
That depends on the property and scope. Layout, structural, plumbing, electrical, and ventilation changes usually bring review. We coordinate the permit steps in the agreed scope; requirements vary by jurisdiction.
What affects bathroom remodeling cost?
Room size and access help define the work. A layout change can mean moving plumbing. Damage found during demolition may add repairs. Cabinetry and glass, tile complexity, lighting and fixture choices affect the finish budget. We price the defined scope and explain the cost of requested changes or newly discovered work before you decide how to proceed.
What affects the timeline?
Your project calendar includes design, permit steps and material lead times as well as active construction. Demolition, waterproofing and tile work follow the sequence set for your room, with inspections and final details built in. We keep the schedule visible. A scope change or hidden condition may shift the sequence. We explain that effect before proceeding.
How will I know what is happening during construction?
Our owner-led process includes daily updates. Progress, issues, upcoming work, and your next decisions stay in one place instead of scattered across trades.
Can you guarantee waterproofing, accessibility, or a specific technical result?
Waterproofing, accessibility and other technical requirements belong in the written scope for your property. We follow the agreed requirements and product instructions, with the design and selected products setting the details. Ask us to confirm any workmanship or product warranty in writing, including its coverage and exclusions.
How are scope changes handled?
A requested change or a new finding gets reviewed for design, cost, permit, ordering, and schedule effects before related work proceeds. You see the implications first.
Free Consultation
Ready to Plan a Better Bathroom?
Tell us what feels cramped, dark, cluttered, dated, or difficult. Then tell us what calm, comfort, organization, and confidence would look like instead. No finished design is required.
Learn moreLearn more








