“They did a nice job with permits and overseeing all of the construction.”

200+
Happy customers across Los Angeles

Family-Owned
And operated with owners on every job

10+
Years improving Los Angeles homes

Fully In-House
Permits to finishes handled by one team
Planning an Addition
More Room That Looks Like It Was Always There
A bedroom, a suite, or a bigger kitchen, without leaving the home you love. Brentwood is part of the City of Los Angeles, so City Planning reviews your zoning and Building and Safety issues the permit. Your zone and hillside status set how far out and how high you can build. One in-house team carries it, including:
- A feasibility visit that measures your setbacks and checks the structure before we choose where to grow
- Plans that tie new space into the original character
- Zoning review with City Planning and plan check with Building and Safety handled by us, with updates at every milestone
- A defined scope, budget, and schedule before crews start
- Finish work that makes the seam between old and new disappear
You gain the room your family needs. We make it feel original to the house.
Plan My Addition
Addition Types We Build
Choose the Space Your Home Is Missing
Every addition is designed to fit your lot, your budget, and the home you already love.
Learn moreLearn more
Bedroom Additions
Private, peaceful space that feels built with the house.

Second-Story Additions
Build up when the lot will not let you build out, within the city's height and setback limits.

Kitchen and Dining Extensions
More room to cook, gather, and move, tied into the home you already have.

Bathroom Additions
An en-suite or guest bath where your layout allows.

In-Law Suites
Independent space for parents, guests, or future income.

Office and Flex Rooms
A quiet room that earns its place in the floor plan.
Why Choose Us
Discover Why 70%+ of Our Work Comes from Word of Mouth
One owner-led path connects scope, design, permits, construction, and final details.
Learn moreLearn morePermits, Plans, and City Coordination
Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.
- We review permit needs early.
- We coordinate plans and documentation with the remodel scope.
- We treat inspections as part of the process, not an afterthought.
- We connect design decisions to build requirements through one accountable team.
Scope Clarity Before Construction
Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.
- We discuss the scope before work begins.
- We clarify material priorities early.
- We surface potential cost drivers during planning.
- We explain changes before moving forward.
A Schedule Based On Real Work
We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.
- We connect milestones to actual work phases.
- We coordinate trades through one accountable team.
- We communicate delays and decisions clearly.
- We include the final walkthrough in the schedule.
Communication Without Chasing
You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.
- We provide regular updates during active work.
- We clarify the decisions you need to make next.
- We keep design and construction connected through one team.
- Our owners stay involved through key project moments.
Addition Projects
Homes Their Owners Are Proud to Show
See what the Quality First commitment looks like in practice, from single room additions to full second stories.
See All ProjectsSee All ProjectsOur Story
Eli Leads the Build. Donna Guides the Design.
You work with an owner-led team that carries your plan from early choices through final details.
Learn moreLearn more
What That Means for Your Addition
- One in-house path from plans and permits through final details.
- Construction accountability led by Eli.
- Design guidance connected to field needs.
- One project record for scope and decisions.
- Clear updates during active work.
- Changes reviewed before related work continues.
- A quality review and final walkthrough.
Our Process
A Clear Path From First Idea to Final Walkthrough
One process links goals, design, permits, choices, construction, updates, and closeout.
Learn moreLearn moreScope Review and Consultation
First we find the room: out, up, or within the roofline. In Brentwood, yard setbacks and, on canyon lots, hillside slope rules decide which options are real.
Design, Scope, and Budget Planning
Donna designs the new space to read as original: rooflines, windows, flooring, and trim that match. Eli prices the foundation, framing, plumbing, and HVAC behind it.
Plans, Permits, and Schedule
Structural drawings and permits with the City of Los Angeles come first, because Brentwood has no building department. City review sets the pace, and we sequence the build around it.
Construction and Updates
Foundation, framing, roof tie-in, systems, and finishes follow a strict order, all on our own crews. Daily updates cover progress, and the existing house stays protected.
Final Walkthrough and Completion
We close by testing the transitions: flooring lines, wall planes, rooflines. Done right, guests cannot find where the house grew.
FAQ
Clear Answers Before You Commit
Learn about project fit, proof, design, permits, updates, changes, and living through construction.
Learn moreLearn moreWhat Brentwood addition projects are a fit?
We build residential additions, from a single bedroom to a full second story. Our minimum for any project is $30,000. On a standard R1 lot, the front yard is 20 percent of the lot depth, capped at 20 feet unless the block's prevailing setback is deeper. So new space usually goes up or toward the back. Going up, a roof with a slope of 25 percent or more can reach 33 feet on a flat R1 lot in Height District 1. An angled plane starts 20 feet up at the front and side setbacks and trims the upper corners. At the first visit, we tell you which direction your lot lets you build.
What addition project proof can I review?
In Mar Vista on the Westside, we added a brand new second story with upstairs bedrooms and a new staircase as part of a complete remodel. In Woodland Hills, we built a second story over Joseph's garage and matched the exterior and roofline to the house. It was his family's second project with us. You can see the Woodland Hills addition on this page.
How do additions connect to the existing home?
First we work out how you enter the new space and how its structure connects to the existing frame. The foundation and roofline then decide whether the new space looks like part of the original architecture or an add-on. On the Woodland Hills second story, we replaced the roof across the whole house and the addition, so the two read as one home.
Will an addition add value?
Added square footage usually matters to a home's value, but we do not promise appraisal outcomes. We focus on space your family will actually use; the investment case is yours to weigh.
Can one team handle design, permits, and construction?
Yes. Donna leads the design and the material choices. Eli leads construction, and our own crews build your addition under one licensed general contractor. We handle the permits, so you never have to coordinate separate contractors.
How do you define the scope?
We start with your goals, your property's zoning and setbacks, and a site visit. On a standard R1 lot in the flats, the rear yard must stay at least 15 feet deep. Side yards are usually 5 feet, or less on lots narrower than 50 feet, and grow by 1 foot for each 10 feet of height above 18 feet. On a canyon lot in the Hillside Area, floor area is figured one slope band at a time, so steeper ground allows less. Then we price what drives the cost: the foundation, framing, roof tie-in, and the plumbing, electrical and HVAC the new rooms need. You get it all in a written estimate before construction starts.
How do permits affect timing?
City plan check is the step that most often sets the pace. Our additions in Mar Vista, Woodland Hills and Northridge went through the same City of Los Angeles review as a Brentwood home. On our 7th Avenue rebuild in Los Angeles, Eli estimated six months of work. It took about seven months, and the only delay was getting the plans approved by the city. That is why we submit complete drawings and respond to plan check corrections ourselves.
What happens if hidden conditions appear?
We review the condition, needed response, and likely effects before related work begins. Tying new structure to old always holds surprises; experience keeps them small.
Can we remain home during construction?
Usually, for most of the build. Additions start outside the existing envelope; the tie-in weeks are the loud ones. We plan access and dust control first.
What happens during the first consultation?
We talk about your house and what you want to change. Your address is enough to pull your parcel report from the city's ZIMAS map. It shows your zone, whether your lot is in the designated Hillside Area, and whether it sits in a Very High Fire Hazard Severity Zone. We check it before design starts, because your zone and hillside status set how far out and how high you can build. Your first conversation does not commit you to construction.
Free Consultation
Plan Your Brentwood Home Addition
Start with project fit and your goals. No construction commitment is made during the first conversation.
Learn moreLearn more









