310-388-3397
Get free consultation

The Better Way to Remodel in Brentwood

Your dream home built by one award-winning team, in record time.

Remodel with the confidence of a design-build process refined over 10+ years to eliminate Brentwood permit delays, change orders, and months of living in a construction zone.

  • No-Obligation
  • Transparent Roadmap
  • Clear Timeline & Budget
Kitchen with a skylight, green glass pendants and a marble island in our Arcadia home remodel
Modern white kitchen with a dark wood island and wall ovens in our South Pasadena remodel
White kitchen with a long island and built-in refrigerator in our Culver City custom home
  • 200+

    Happy customers across Los Angeles

  • Family-Owned

    And operated with owners on every job

  • 10+

    Years remodeling Los Angeles homes

  • Fully In-House

    Permits to finishes handled by one team

Planning a Home Remodel

The Whole House, Finally Working as One Home

Open rooms, real light, and a layout that fits how you live now. Brentwood sits inside Los Angeles city limits, so moving walls or redoing a kitchen or bathroom takes a permit from the Los Angeles Department of Building and Safety. A whole-home remodel touches every trade and every permit. One in-house team coordinates all of it, including:

  • One plan connecting layout, structure, storage, and light
  • Design guidance that keeps every room part of the same home
  • Permits and inspections with the Department of Building and Safety, handled for you, with updates at every milestone
  • A written contract with your scope, budget, payment schedule and timeline before demolition starts
  • Our own licensed, bonded, and insured crews from framing to finishes

You decide how the house should live. We carry it to the final walkthrough.

Plan My Brentwood Remodel
Complete home remodel at Greenwood Avenue in Los Angeles

Remodeling Services

One Team for Every Room and Every Trade

Start with one room or take on the whole house. The same owner-led team plans and builds it all.

Learn moreLearn more

Why Choose Us

Discover Why 70%+ of Our Work Comes from Word of Mouth

One owner-led path connects scope, design, permits, construction, and final details.

Learn moreLearn more

Permits, Plans, and City Coordination

Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.

  • We review permit needs early.
  • We coordinate plans and documentation with the remodel scope.
  • We treat inspections as part of the process, not an afterthought.
  • We connect design decisions to build requirements through one accountable team.
Get My Free Estimate

Scope Clarity Before Construction

Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.

  • We discuss the scope before work begins.
  • We clarify material priorities early.
  • We surface potential cost drivers during planning.
  • We explain changes before moving forward.
Get My Free Estimate

A Schedule Based On Real Work

We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.

  • We connect milestones to actual work phases.
  • We coordinate trades through one accountable team.
  • We communicate delays and decisions clearly.
  • We include the final walkthrough in the schedule.
Get My Free Estimate

Communication Without Chasing

You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.

  • We provide regular updates during active work.
  • We clarify the decisions you need to make next.
  • We keep design and construction connected through one team.
  • Our owners stay involved through key project moments.
Get My Free Estimate

Remodeling Projects

Homes Their Owners Are Proud to Show

See what the Quality First commitment looks like in practice, from single rooms to whole-home remodels.

See All ProjectsSee All Projects
Montana Avenue Santa Monica complete home remodel

01

Complete Home Remodel in Santa Monica

    Get My Free EstimateMore details
    Kitchen with white cabinets, a gray tile backsplash and a peninsula in our Santa Monica remodel

    02

    Complete Home Remodel in Santa Monica

      Get My Free EstimateMore details
      Flores De Oro South Pasadena complete home remodel

      03

      Complete Home Remodel in South Pasadena

        Get My Free EstimateMore details

        Our Story

        Eli Leads the Build. Donna Guides the Design.

        You work with an owner-led team that carries your plan from early choices through final details.

        Learn moreLearn more
        More about us
        Eli and Donna of Quality First Builders in a completed Los Angeles kitchen

        What That Means for Your Remodel

        • One in-house path from plans and permits through final details.
        • Construction accountability led by Eli.
        • Design guidance connected to field needs.
        • One project record for scope and decisions.
        • Clear updates during active work.
        • Changes reviewed before related work continues.
        • A quality review and final walkthrough.

        Our Process

        A Clear Path From First Idea to Final Walkthrough

        One process links goals, design, permits, choices, construction, updates, and closeout.

        Learn moreLearn more
        1. Scope Review and Consultation

          We walk the whole house with you: which rooms fail, where light dies, what the layout blocks. Then we check what limits your goal: your parcel's zoning and overlays, and the existing structure.

        2. Design, Scope, and Budget Planning

          Room by room, Donna builds one design direction: layout, materials, flooring and light. Eli keeps each decision priced and buildable before it locks in.

        3. Plans, Permits, and Schedule

          Drawings and permits happen before demolition, not during. California's building code requires a permit to alter, repair or demolish a home. We answer the city plan checker's corrections, then schedule every trade.

        4. Construction and Updates

          Construction runs on our own crews and one manager, with daily updates. Protection and phasing keep part of the house yours to live in the whole time.

        5. Final Walkthrough and Completion

          We review every room against the agreed scope, down to paint edges and cabinet doors. The finish has to hold up to daily life, not just photos.

        FAQ

        Clear Answers Before You Commit

        Learn about project fit, proof, design, permits, updates, changes, and living through construction.

        Learn moreLearn more
        What Brentwood home remodeling projects are a fit?

        Our minimum is $30,000. Above that line we take on whole-home remodels, multi-room renovations, additions and major renovation projects such as a full kitchen or bathroom. Our business is residential only, never commercial.

        Which completed whole-home projects can I review?

        Start with our first-floor remodel in Brentwood. We did a full kitchen remodel with a peninsula and a marble backsplash, laid walnut floors across the entire first floor and redesigned the living room bar. Its photos are in our project gallery. For a whole house close by, our Greenwood Avenue remodel in Mar Vista, pictured near the top of this page, also added a second story. Compare the layouts, finishes, flow and completed spaces against your own plans.

        Can one team handle design, permits, and construction?

        Yes. We are a licensed general contractor, license 990316, which you can look up on the Contractors State License Board site. Donna provides design guidance in-house. We coordinate permits, scheduling, construction, inspections and finishes, so you have no separate contractors to manage.

        Who leads my remodel?

        Eli leads construction and accountability. Donna guides layouts, materials, and finishes. Both stay involved.

        How do you define the scope?

        We review your goals, plans and selections along with the property, its systems, access and the big cost drivers. Everything lands in a written estimate before construction. California requires a written contract for any home improvement over $500. The state licensing board says it should spell out the work, the price, payment dates, who gets the permits and when the job will be finished. State law also caps the down payment at $1,000 or 10 percent of the price, whichever is less.

        How are design choices organized?

        Donna walks you through layout, cabinets, flooring, paint and fixtures room by room. Some clients shop for slabs and appliances with her in person. Eli prices each choice and confirms it can be built before it is ordered. Every approved choice goes into the project record, so the crew builds exactly what you signed off on.

        How do permits affect timing?

        City review, inspections, site conditions and your own decisions all move the date. We file with the Los Angeles Department of Building and Safety, answer its corrections and book its inspections. The city's ZIMAS parcel map also shows whether your lot carries extra rules, such as the Hillside Area, the San Vicente Scenic Corridor specific plan or a Very High Fire Hazard Severity Zone. Each can add its own review. On 7th Avenue in Los Angeles, Eli's estimate was six months and the job took about seven. The only delay was the city approving plans, and the neighbors remarked on how quickly the work moved.

        What happens if hidden conditions appear?

        We stop and walk you through what we found. Before related work continues, we put the fix on a written change order, because California requires contract changes in writing. On 7th Avenue, a Los Angeles house nearly 100 years old that we rebuilt after a fire, the owners spent more than they first planned, partly to replace a damaged foundation. They say Eli was clear and upfront the whole way about what rebuilding an old home really takes. Experience with older Westside homes makes most findings familiar.

        How often will I receive updates?

        You receive clear updates during active work. Communication covers progress, issues, and upcoming decisions.

        What happens during the first consultation?

        We talk through fit, starting with the $30,000 minimum, then your goals, the house and the likely scope. You leave knowing the next step, and the first conversation does not commit you to anything. If you later sign a contract, state rules give you three days to cancel it.

        Free Consultation

        Plan Your Brentwood Home Remodel

        Start with project fit and your goals. No construction commitment is made during the first conversation.

        Learn moreLearn more