“When I asked Eli how long the project would take, he estimated three to four weeks. In the end, it was completed in four weeks and four days.”

200+
Happy customers across Los Angeles

Family-Owned
And operated with owners on every job

10+
Years remodeling Los Angeles homes

Fully In-House
Permits to finishes handled by one team
Planning a Project in Calabasas
A Calabasas Remodel That Clears Every Review the First Time
Getting it right at review starts long before the plans reach the City. Donna develops the layout and finish choices with you while Eli checks the construction behind them. We coordinate the approvals your property needs, from permit submissions to any required HOA review, and build inspections into the schedule. Your kitchen storage, living space and budget are part of that same plan:
- A walkthrough of your home and an honest read on what's possible
- Design guidance that turns ideas into plans you can actually build
- City permits and any required agency or HOA reviews coordinated for you, with updates at each milestone
- A defined scope, written estimate, and schedule before crews start
- One residential general contractor accountable for every phase, licensed, bonded, and insured
You pick the finishes. We get them approved, ordered, and installed in order.
Plan My Calabasas Project
Our Services
More Useful Space With One Connected Plan
Our remodeling services cover full interior renovations and kitchen and bathroom remodeling. We also build room additions, ADUs or garage conversions when you need more space. Plan the layout and storage alongside cabinets, countertops and flooring so the rooms work together. Small repairs and single-trade work may not be a fit.
Learn moreLearn more
Whole-Home Remodeling
Rework the whole home around how your family wants to live next.

Kitchen Remodeling
Create a more useful kitchen for cooking, gathering, and everyday life.

Bathroom Remodeling
Turn an outdated bathroom into a calm, practical space built to last.

Home Additions
Add the room you need without losing what already works about your home.

ADU Construction
Create flexible space for family, guests, work, or future plans.

Garage Conversions
Turn underused space into a practical room that serves your next need.
Why Choose Us
Discover Why 70%+ of Our Work Comes from Word of Mouth
Fully in-house delivery keeps the plan connected. A dedicated project manager and daily updates keep you informed.
Learn moreLearn morePermits, Plans, and City Coordination
Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.
- We review permit needs early.
- We coordinate plans and documentation with the remodel scope.
- We treat inspections as part of the process, not an afterthought.
- We connect design decisions to build requirements through one accountable team.
Scope Clarity Before Construction
Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.
- We discuss the scope before work begins.
- We clarify material priorities early.
- We surface potential cost drivers during planning.
- We explain changes before moving forward.
A Schedule Based On Real Work
We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.
- We connect milestones to actual work phases.
- We coordinate trades through one accountable team.
- We communicate delays and decisions clearly.
- We include the final walkthrough in the schedule.
Communication Without Chasing
You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.
- We provide regular updates during active work.
- We clarify the decisions you need to make next.
- We keep design and construction connected through one team.
- Our owners stay involved through key project moments.
Remodeling Projects
Homes Their Owners Are Proud to Show
See what the Quality First commitment looks like in practice, from single kitchens to whole homes.
See All ProjectsSee All ProjectsOur Story
One In-House Team From First Idea to Final Detail
Donna helps you see possibilities you might have missed. At the Almazan Road kitchen and bathroom remodel in nearby Woodland Hills, she guided the homeowners through appliances, plumbing fixtures and tile. They credited her with anticipating details they would not have thought of themselves. That design attention stays connected to Eli's construction planning, so you can make choices with the build in mind.
Learn moreLearn more
What Calabasas Homeowners Get
- Eli leads construction.
- Donna guides design choices.
- A dedicated project manager owns daily coordination.
- Daily updates keep progress clear.
- Permits, trades, and finishes stay connected.
- Changes are explained before related work starts.
- The final work is reviewed with you.
Our Process
A Clear Path From First Idea to Final Walkthrough
One process links goals, plans, permits, choices, trades, checks, and closeout. We work till you love the agreed result.
Learn moreLearn moreScope Review and Consultation
The first conversation covers the honest basics: what is not working, what you want instead, and whether scope, budget, and timing line up.
Design, Scope, and Budget Planning
Donna helps you compare layout and finish choices, including cabinetry, flooring and the style of each room. Eli reviews the construction behind those choices. Keeping a sink in place and moving it across the kitchen can mean different plumbing work and a different budget.
Plans, Permits, and Schedule
We check the permit requirements for your address and scope, then plan submissions, inspections and material orders around the work. Calabasas provides kitchen and bathroom checklists; larger changes may need a fuller plan review. Any required outside-agency approvals belong in the schedule too.
Construction and Updates
Our own crews carry construction, with a dedicated project manager keeping trades coordinated and you informed as milestones land.
Final Walkthrough and Completion
The project closes with a walkthrough, final details, and an honest check that the result matches what we agreed.
FAQ
Clear Answers Before You Commit
Learn about project fit, plans, updates, budgets, permits, timing, site issues, and the qualified ADU offer.
Learn moreLearn moreWhich completed projects can I review?
The projects shown here are in nearby Woodland Hills and West Hills. For a whole-home example, look at the Poe Avenue remodel in Woodland Hills, which combined kitchen and bathroom work with room additions. Use the project gallery to compare those scopes and finished rooms with your own plans.
Which projects are a fit?
We fit full remodels, kitchens, bathrooms, additions, ADUs, garage conversions, and custom homes. A whole-home renovation is our sweet spot; small repairs may not be a fit. The work is residential, never commercial.
Do I need plans before I call?
No. Start with the property, your goals, and your questions. Many clients call before hiring outside architects, and we help define the next step.
What does fully in-house mean?
One team connects design, engineering coordination, permits, construction, and finishes. You do not have to manage separate firms or contractors.
Who manages the job?
A dedicated project manager keeps the schedule, trades, choices, and updates connected.
How often will I get updates?
We provide daily updates during active work. You know what changed and what comes next.
How is the budget handled?
We review the scope and cost drivers before construction, including structural changes, plumbing or electrical work and finish selections. Cabinets, countertops and appliances need to be considered together. A layout change can also affect the work behind the walls. We explain proposed changes and their cost before that work moves forward.
How long will my project take?
We separate design, approvals and ordering from active construction when discussing the schedule. The scope matters: renovating rooms within the existing layout is a different project from adding living space. Permit review and material availability also affect the start date. Your estimate and schedule should reflect the work planned for your home.
Who handles permits?
Our team coordinates plans, permits and inspections. For a property within the City of Calabasas, we start with the City's requirements. Its guidance distinguishes cosmetic work, such as painting, from changes to plumbing or electrical systems. The City identifies any required outside-agency approvals for the project. We confirm the property's jurisdiction and scope rather than assume every Calabasas mailing address follows the same route.
How are hidden issues handled?
We explain the issue, the options, and any cost or timing effect before the next step. That commitment to plain answers is most of the service.
Free Consultation
Plan the Next Chapter of Your Home
Tell us what is not working and what your family needs next. No finished plans are needed.
Learn moreLearn more









