“Everything they said they would do, they did. In construction, that kind of consistency can be rare, and I really appreciated their professionalism and follow-through.”

200+
Happy customers across Los Angeles

Family-Owned
And operated with owners on every job

10+
Years remodeling Los Angeles homes

Fully In-House
Permits to finishes handled by one team
Planning a Construction Project
A Build That Keeps Moving, With Every Trade Accounted For
A build keeps moving when engineering, city review, trades and inspections land in the right order. In Calabasas, that runs from planning review, when needed, to each agency's final sign-off. As your construction company, we put one in-house team in charge of it from day one, including:
- Site review and structural planning before anything is promised
- Engineering, permits, and plan check managed under one roof
- A defined scope, budget, and schedule before crews start
- Our own licensed, bonded, and insured crews at every phase
- Each city inspection prepared for before it happens
You watch the build take shape. We keep every moving piece accounted for.
Plan My Project
Construction Services
From Ground-Up Builds to Structural Work

Ground-Up Construction
A new home from planning and permits to delivery, like Nancy's new backyard house in Woodland Hills.

Structural Work
Foundations, seismic reinforcement, and safe open floor plans, up to rebuilding a fire-damaged Culver City house.

Room Additions
Second stories that feel original, like one we added over a garage with the home's roofline matched.

Garage Conversions and ADUs
Legal living space, like the Bowmans' West Hills unit over their garage with a full kitchen and bath.

Interior Remodels
Kitchens, bathrooms, and full interiors with lasting materials.

Exterior Work
Siding, stucco, roofing, and hardscape that protect the home.
Why Choose Us
Discover Why 70%+ of Our Work Comes from Word of Mouth
One owner-led path connects scope, design, permits, construction, and final details.
Learn moreLearn morePermits, Plans, and City Coordination
Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.
- We review permit needs early.
- We coordinate plans and documentation with the remodel scope.
- We treat inspections as part of the process, not an afterthought.
- We connect design decisions to build requirements through one accountable team.
Scope Clarity Before Construction
Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.
- We discuss the scope before work begins.
- We clarify material priorities early.
- We surface potential cost drivers during planning.
- We explain changes before moving forward.
A Schedule Based On Real Work
We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.
- We connect milestones to actual work phases.
- We coordinate trades through one accountable team.
- We communicate delays and decisions clearly.
- We include the final walkthrough in the schedule.
Communication Without Chasing
You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.
- We provide regular updates during active work.
- We clarify the decisions you need to make next.
- We keep design and construction connected through one team.
- Our owners stay involved through key project moments.
Construction Projects
Homes Their Owners Are Proud to Show
See what the Quality First commitment looks like in practice, from single kitchens to whole homes.
See All ProjectsSee All ProjectsOur Story
Eli Leads the Build. Donna Guides the Design.

What That Means for Your Project
- One in-house path from plans and permits through final details.
- Construction accountability led by Eli.
- Design guidance connected to field needs.
- One project record for scope and decisions.
- Clear updates during active work.
- Changes reviewed before related work continues.
- A quality review and final walkthrough.
Our Process
A Clear Path From First Idea to Final Walkthrough
One process links goals, design, permits, choices, construction, updates, and closeout.
Learn moreLearn moreScope Review and Consultation
The first conversation covers the honest basics: what is not working, what you want instead, and whether scope, budget, and timing line up.
Design, Scope, and Budget Planning
Donna helps shape design choices that fit the home and your life. Eli connects those choices to construction realities, so the plan stays buildable and priced.
Plans, Permits, and Schedule
Calabasas reviews a build in stages: planning review when needed, then plan check, permits and inspections from several agencies. We build each stage into the schedule from day one.
Construction and Updates
Our own crews carry construction, with a dedicated project manager keeping every trade coordinated and you informed as each milestone lands.
Final Walkthrough and Completion
The project closes with a walkthrough, final details, and an honest check that the finished result matches what we agreed on together.
FAQ
Clear Answers Before You Commit
Learn about project fit, proof, design, permits, updates, changes, and living through construction.
Learn moreLearn moreWhat Calabasas construction projects are a fit?
We build new homes, additions, ADUs, full-home remodels and major renovations, and our minimum project is $30,000. As a residential construction company, we do not take commercial building work.
What project proof can I review?
Start with the projects section on this page, where each project shows the scope and the finished results. The services above name real builds near Calabasas, from a new backyard house to a full kitchen and bath over a garage. Then read the reviews from clients who have lived through a build with us.
Do you work beyond Calabasas?
Yes. We have built in the area around Calabasas, including Woodland Hills, West Hills, Westlake and Tarzana, and across Los Angeles in places like Sherman Oaks and Studio City. The same crews and the same management travel to every house.
Can one team handle design, permits, and construction?
Yes. We are a licensed California general contractor with design in-house, so permits, scheduling, construction, inspections and finishes run through one team. In Calabasas, planning review, when your project needs it, starts with a committee that includes every city department, and plan check brings several departments to the drawings. After permits are issued, inspections can come from Building and Safety, the Fire Department, Los Angeles County and the Las Virgenes Municipal Water District, and we prepare for each one. You can check our license with the Contractors State License Board (CSLB); the number is in the footer of every page. No separate contractors to manage.
Who leads my project?
Eli leads construction and accountability. Donna guides layouts, materials, and finishes. Both stay involved.
How do you define the scope?
We review your goals, property, plans, selections, systems, access, and major cost drivers. The scope lands in a written estimate before construction; changes get a revised quote first.
How are design choices organized?
Donna helps you choose layouts and finishes, and she often shops with clients for slabs, tile and fixtures. Each choice goes into the project record before anything is ordered, so the crew installs what you approved.
How do permits affect timing?
Timing depends on which city steps your project needs and how quickly you make your selections. In Calabasas, CA, the city tells you in writing within 30 days whether a planning application is complete. If your project needs a public hearing, the city's guide puts it 30 to 90 days after the application is complete. Some projects also need an Oak Tree Permit. Once work starts, we request each inspection as that stage nears completion, since the city typically needs about 24 hours of notice. In West Hills, the Bowmans came to us with a permit about to expire, and Eli pulled it within weeks.
What happens if hidden conditions appear?
We stop, review the condition and price the fix before related work goes on. On one remodel, a termite inspection found a failed shower pan. We wrote a change order to add the primary bathroom to the job. Renovation surprises are familiar ground after a decade of experience.
How often will I receive updates?
You receive clear updates during active work. Communication covers progress, issues, and upcoming decisions.
Free Consultation
Plan Your Calabasas Project
Start with project fit and your goals. No construction commitment is made during the first conversation.
Learn moreLearn more









