310-388-3397
Get free consultation

The Better Way to Remodel in Glendale

Your dream home built by one award-winning team, in record time.

Remodel with one licensed general contractor and a design-build process refined over 10+ years to eliminate Glendale permit delays and the guesswork around them.

  • No-Obligation
  • Transparent Roadmap
  • Clear Timeline & Budget
Kitchen with gray cabinets, a chevron tile backsplash and a long white dining table in Santa Monica
Kitchen with a skylight, green glass pendants and a marble island in our Arcadia home remodel
Modern white kitchen with a dark wood island and wall ovens in our South Pasadena remodel
  • 200+

    Happy customers across Los Angeles

  • Family-Owned

    And operated with owners on every job

  • 10+

    Years remodeling Los Angeles homes

  • Fully In-House

    Permits to finishes handled by one team

Planning a Project in Glendale

A Glendale Remodel Built Around the House You Actually Own

In Glendale, CA, your general contractor should first settle which city review your renovation needs. Interior-only work on a house goes to an alteration and repair permit. Exterior changes and additions need design review approved before you apply, or the city voids the application. We sort your project onto the right path first. Then one team carries it through:

  • A walkthrough of your home and an honest read on what's possible
  • Design guidance that turns ideas into plans you can actually build
  • Design review, permits and inspections handled with the City of Glendale, with updates at every milestone
  • A defined scope, budget, and schedule before crews start
  • Our own bonded and insured crews at every phase, working under California CSLB license #990316

The house sets the starting point. We take it the rest of the way.

Plan My Glendale Project
Kitchen remodel at Mont Eagle Place in Eagle Rock

Our Services

Shape Your Home Around What Comes Next

Start with the change you want. We connect each service to one clear plan.

Learn moreLearn more

Why Choose Us

Discover Why 70%+ of Our Work Comes from Word of Mouth

One owner-led path connects scope, design, permits, construction, and final details.

Learn moreLearn more

Permits, Plans, and City Coordination

Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.

  • We review permit needs early.
  • We coordinate plans and documentation with the remodel scope.
  • We treat inspections as part of the process, not an afterthought.
  • We connect design decisions to build requirements through one accountable team.
Get My Free Estimate

Scope Clarity Before Construction

Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.

  • We discuss the scope before work begins.
  • We clarify material priorities early.
  • We surface potential cost drivers during planning.
  • We explain changes before moving forward.
Get My Free Estimate

A Schedule Based On Real Work

We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.

  • We connect milestones to actual work phases.
  • We coordinate trades through one accountable team.
  • We communicate delays and decisions clearly.
  • We include the final walkthrough in the schedule.
Get My Free Estimate

Communication Without Chasing

You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.

  • We provide regular updates during active work.
  • We clarify the decisions you need to make next.
  • We keep design and construction connected through one team.
  • Our owners stay involved through key project moments.
Get My Free Estimate

Remodeling Projects

Homes Their Owners Are Proud to Show

See what the Quality First commitment looks like in practice, from single kitchens to whole homes.

See All ProjectsSee All Projects
Montana Avenue Santa Monica complete home remodel

01

Complete Home Remodel in Santa Monica

    Get My Free EstimateMore details
    Kitchen with white cabinets, a gray tile backsplash and a peninsula in our Santa Monica remodel

    02

    Complete Home Remodel in Santa Monica

      Get My Free EstimateMore details
      Flores De Oro South Pasadena complete home remodel

      03

      Complete Home Remodel in South Pasadena

        Get My Free EstimateMore details

        Our Story

        Eli Leads the Build. Donna Guides the Design.

        You work with an owner-led team that carries your plan from early choices through final details.

        Learn moreLearn more
        More about us
        Eli and Donna of Quality First Builders in a completed Los Angeles kitchen

        What That Means for Your Remodel

        • One in-house path from plans and permits through final details.
        • Construction accountability led by Eli.
        • Design guidance connected to field needs.
        • One project record for scope and decisions.
        • Clear updates during active work.
        • Changes reviewed before related work continues.
        • A quality review and final walkthrough.

        Our Process

        A Clear Path From First Idea to Final Walkthrough

        One process links goals, design, permits, choices, construction, updates, and closeout.

        Learn moreLearn more
        1. Scope Review and Consultation

          We start with what you want to change, what fails daily, and how you want to live in the finished space. Goals, scope, timing, and fit get discussed straight.

        2. Design, Scope, and Budget Planning

          Design and budget develop together. Donna guides the choices and Eli prices the build behind them, so nothing locks until both sides agree on the plan.

        3. Plans, Permits, and Schedule

          We coordinate drawings and your City of Glendale permits. Exterior work gets its design review package first. Once that is approved and any Glendale Water & Power clearance is in, we apply and schedule inspections.

        4. Construction and Updates

          Construction runs on our own crews. A dedicated project manager coordinates trades and sends updates as each milestone lands, so you always know where the job stands.

        5. Final Walkthrough and Completion

          At the end, we review the finished work with you, handle final details, and make sure the result feels right before calling it complete.

        FAQ

        Clear Answers Before You Commit

        Learn about project fit, proof, design, permits, updates, changes, and living through construction.

        Learn moreLearn more
        What Glendale home remodeling projects are a fit?

        We take on whole-home remodels and additions, plus large multi-room renovation projects. Our general minimum is $30,000. We are a residential general contractor only, so commercial building is not our lane.

        Do you have completed projects in Glendale?

        The projects featured above are in Santa Monica and South Pasadena. Our closest documented jobs are in Eagle Rock, where we updated a Spanish bungalow kitchen, and Silver Lake, where we added a second bathroom to a 1927 Spanish Colonial. The Eagle Rock owners interviewed five contractors and said Eli's proposal was the most accurate and thorough. During your consultation, we walk you through the completed work closest to your home's layout and scope.

        Can one team handle design, permits, and construction?

        Yes. We're a licensed general contractor with in-house design guidance. Quality First Builders Inc holds California CSLB license #990316, Class B General Building, and you can look it up on the CSLB site before you sign. For exterior work, we prepare the City of Glendale design review package, which for many projects includes a photo survey of the site and building facades, a site plan and product information. Your selections stay connected to permit coordination and construction, from scheduling and inspections through the final finishes.

        Who leads my remodel?

        Eli leads construction and accountability. Donna guides layouts, materials, and finishes. Both stay involved.

        How do you define the scope?

        We review your goals and property access, then define what you're keeping, replacing, or adding. A new room layout can require changes to plumbing or electrical systems as well as finishes. Windows, doors, and any roofing work also belong in the plans and budget, since Glendale treats them as exterior changes. The city's hillside slope and fire hazard severity zone maps also show conditions on your lot that belong in the plan.

        How are design choices organized?

        Donna guides your selections against the approved plans and budget. In Eagle Rock, she helped a couple choose paint colors and countertops for a kitchen that kept their bungalow's classic feel. Cabinetry needs to fit the planned layout, and materials must suit the room and the work required on site. Tying those choices to orders helps our crew build exactly what you approved.

        How do permits affect timing?

        Allow for city review when planning a construction start. In Glendale, CA, a single-family interior remodel with no exterior changes applies for an alteration and repair permit. Changes to windows, doors, siding, the roof or the site, and additions, must clear design review before the application, and an addition also needs Planning pre-screening approval. If you apply too early, the city voids the application. In Rossmoyne and the city's eight other historic districts, the Historic Preservation Commission does that review instead of the Design Review Board. Inspections, site conditions, and your decisions also affect timing. We coordinate these steps and explain upcoming decisions as the project moves forward.

        What happens if hidden conditions appear?

        We show you the condition, then review the fix and its effect on cost and schedule before related work begins. Before demolition, we also cover the city's Renovation/Demolition Acknowledgement Form, which most Glendale building permits require, and the South Coast AQMD's Rule 1403 asbestos notification steps.

        How often will I receive updates?

        You receive clear updates during active work. Progress, issues, and upcoming decisions stay visible.

        What happens during the first consultation?

        Tell us which rooms need to change and what isn't working in daily life. We'll discuss project fit, likely scope, and useful next steps. If your house is on the Glendale Register of Historic Resources, its alterations need city approval. In neighborhoods such as Brockmont Park and Royal Boulevard, both historic districts, the Historic Preservation Commission reviews the work. Tell us early either way, and bring any existing plans or details of earlier work on the house.

        Free Consultation

        Plan Your Glendale Home Remodel

        Start with project fit and your goals. No construction commitment is made during the first conversation.

        Learn moreLearn more