“Everything they said they would do, they did. In construction, that kind of consistency can be rare, and I really appreciated their professionalism and follow-through.”

200+
Happy customers across Los Angeles

Family-Owned
And operated with owners on every job

10+
Years remodeling Los Angeles homes

Fully In-House
Permits to finishes handled by one team
Planning a Home Remodel
The Whole House, Finally Working as One Home
Whole-home renovation begins with the rooms you use and the structure already there. At Poe Avenue in Woodland Hills, walls that had to stay shaped the layout; a double-sided fireplace opened the view toward the outdoors. We plan the changes together across the house, including:
- One plan connecting layout, structure, storage, and light
- Design guidance that keeps every room part of the same home
- Permits and inspections managed, with updates at every milestone
- A defined scope, budget, and schedule before demolition starts
- Our own licensed, bonded, and insured crews from framing to finishes
You decide how the house should live. We carry it to the final walkthrough.
Plan My Remodel
Remodeling Services
One Team for Every Room and Every Trade
Start with one room or take on the whole house. The same owner-led team plans and builds it all.
Learn moreLearn more
Whole-Home Remodels
One plan for circulation, light, storage, and structure.

Kitchen Remodels
The room that carries daily life, done right.

Bathroom Remodels
Calm, durable bathrooms with the technical work handled.

Room Additions
New space tied into the home so it looks original.

Garage Conversions
Underused square footage turned into real living space.

ADU Construction
A legal, rent-ready unit from feasibility to keys.
Why Choose Us
Discover Why 70%+ of Our Work Comes from Word of Mouth
Permits, budget, timeline, and communication stay connected through one accountable process.
Learn moreLearn morePermits, Plans, and City Coordination
Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.
- We review permit needs early.
- We coordinate plans and documentation with the remodel scope.
- We treat inspections as part of the process, not an afterthought.
- We connect design decisions to build requirements through one accountable team.
Scope Clarity Before Construction
Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.
- We discuss the scope before work begins.
- We clarify material priorities early.
- We surface potential cost drivers during planning.
- We explain changes before moving forward.
A Schedule Based On Real Work
We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.
- We connect milestones to actual work phases.
- We coordinate trades through one accountable team.
- We communicate delays and decisions clearly.
- We include the final walkthrough in the schedule.
Communication Without Chasing
You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.
- We provide regular updates during active work.
- We clarify the decisions you need to make next.
- We keep design and construction connected through one team.
- Our owners stay involved through key project moments.
Home Remodel Projects
Homes Their Owners Are Proud to Show
The Whitaker Avenue remodel in Northridge connected a larger kitchen with an open first floor and moved the powder room away from the entry. Explore the projects below to see how layout changes and finishes work together.
See all projectsSee all projectsOur Story
Eli Leads the Build. Donna Guides the Design Decisions.
One owner-led team keeps what you picture connected to scope, budget, and the way it must be built.
Learn moreLearn more
What Owner-Led, Start-to-Finish Delivery Means
- Eli and Donna remain connected to the remodel
- Thoughtful design help across rooms, transitions, and finishes
- Permits, procurement, trades, and schedule held in one process
- A dedicated project manager and daily updates
- Clear timelines based on the actual scope
- Changes explained before related work proceeds
- Agreed final details reviewed with you before closeout
Our Process
How We Bring Your Remodel to Life
Five steps keep planning, design, permits, construction, and final review connected.
Learn moreLearn moreScope Review and Consultation
We walk the whole house with you: which rooms fail, where light dies, what the layout blocks. You share the vision; we listen for the constraints. You will leave knowing what your remodel actually involves, what it is likely to cost, and whether it is worth doing now.
Design, Scope, and Budget Planning
Before choosing flooring or finishes, we settle how each room should work and where the layout can change. Donna develops the interior design direction; Eli connects it to structural requirements and the budget. Selections stay tied to procurement, so the construction team works from the same decisions.
Plans, Permits, and Schedule
For homes within the City of Los Angeles, we check LADBS requirements against the scope before demolition. Structural alterations and floor-plan changes generally need plan review; some simpler jobs qualify for an Express Permit. Required plumbing and electrical inspections must happen before the work is concealed. We coordinate drawings and the trade schedule around those stages.
Construction and Updates
Our own crews run the build, with any project-specific outside specialty input identified in the written scope. Your dedicated project manager sends daily updates on progress and upcoming decisions. Site protection and phasing need to account for the parts of the house still in use, including access and available utilities.
Final Walkthrough and Completion
We review every room against the agreed scope, down to paint edges and cabinet doors. The craftsmanship has to hold up to daily life, not just to photos.
FAQ
Fit, Design, Permits, Cost Drivers, Timeline, Protection, and Final Details
Resolve the questions that most often turn a whole-home remodel into fragmented decisions, budget uncertainty, contractor chaos, and unfinished handoffs.
Plan My RemodelPlan My RemodelWhat kinds of home remodeling projects are a fit?
Substantial whole-home remodels, multi-room renovations, meaningful layout changes, additions, and connected design-build scopes fit best. Handyman repairs and isolated replacement work are generally not the fit; this service is structured for coordinated design, permits, project management, and multiple trades.
Do I need finished plans before contacting you?
No. Begin with what is not working, how you want the home to feel and function, any inspiration or records, the rooms involved, budget goals, and preferred timing.
What does fully in-house delivery mean?
Quality First Builders Inc holds California CSLB license #990316, Class B General Building. For your remodel, our in-house team connects design guidance with documentation, permit steps and construction. Project management covers trade sequencing, daily updates and finish decisions. Any project-specific outside specialty input is identified in the written scope.
Who helps with the whole-home design direction?
Donna guides the layout and how rooms connect, then helps with materials, cabinetry and lighting. Finishes and transitions need to work with the rest of the home: at Landale Street in Studio City, George and Mixtli wanted a larger kitchen and more storage without losing their California bungalow's character. Eli and the construction team connect these design choices to buildability, scope, procurement and schedule.
Who manages construction and communication?
A dedicated project manager connects trades, decisions, inspections, and progress, while Eli and Donna remain involved in construction and design accountability. Daily updates keep progress, issues, and next decisions visible.
Will my home remodel require permits?
That depends on the property and scope, especially structural, layout, plumbing, electrical, mechanical, or addition work. We coordinate applicable permit and inspection steps within the written scope, but do not guarantee approvals.
What affects whole-home remodeling cost?
The number of rooms is only part of the cost. The work inside the walls matters too. Relocating a kitchen or bathroom can change plumbing and electrical work. Even with the same layout, cabinetry and fixtures have purchase and installation costs. Structural changes and custom details add to the scope; access, existing conditions and permits also affect pricing. Reliable pricing needs a defined scope and written estimate. Requested changes are reviewed before related work proceeds.
What affects the project timeline?
The schedule accounts for design decisions, documentation and permit review before construction, then the order of work across the rooms. Material lead times and inspection approvals can affect when the next trade can start. Access, existing conditions and requested changes also matter. We establish a project-specific timeline and keep progress and upcoming decisions visible through daily updates.
Can we live in the home during construction?
Start with which rooms and utilities will be unavailable at each phase. A working bathroom alone does not settle whether the home is suitable to occupy: safe access, dust control and household needs still matter. We discuss site protection and temporary living arrangements for your particular scope and sequence. Expect disruption, even when part of the house stays in use.
What does “We Work Till You Love It” mean?
It is our satisfaction-first commitment to review the completed remodel against the agreed scope and address agreed final details before closeout. Hidden conditions and scope changes along the way are documented and explained before related work proceeds. The written contract sets the details.
Free Consultation
Ready to Plan the Home You Want Next?
Tell us what is not working, the rooms involved, and the life, light, function, and character you want instead. Eli, Donna, and the in-house team will help clarify the right design, scope, permit, and construction next step.
Learn moreLearn more









