310-388-3397
Get free consultation

The Better Way to Remodel in Malibu

Your dream home built by one award-winning team, in record time.

Remodel with the confidence of a design-build process refined over 10+ years to eliminate Malibu permit delays, change orders, and months of living in a construction zone.

  • No-Obligation
  • Transparent Roadmap
  • Clear Timeline & Budget
White kitchen with a long island and built-in refrigerator in our Culver City custom home
Kitchen with a skylight, green glass pendants and a marble island in our Arcadia home remodel
Modern white kitchen with a dark wood island and wall ovens in our South Pasadena remodel
  • 200+

    Happy customers across Los Angeles

  • Family-Owned

    And operated with owners on every job

  • 10+

    Years remodeling Los Angeles homes

  • Fully In-House

    Permits to finishes handled by one team

Planning a Home Remodel

The Whole House, Finally Working as One Home

Open rooms, real light, and a layout that fits how you live now. Home remodeling in Malibu starts with your exterior walls. Replace more than half their length and the city treats the house as a replacement structure under today's coastal rules. We count that framing before design is final. Then one in-house team coordinates every trade and permit, including:

  • One plan connecting layout, structure, storage, and light
  • Design guidance that keeps every room part of the same home
  • Planning approval and plan check managed for you, plus inspections and updates at every milestone
  • A defined scope, budget, and schedule before demolition starts
  • Our own bonded and insured crews from framing to finishes, working under CSLB license #990316

You decide how the house should live. We carry it to the final walkthrough.

Plan My Malibu Remodel
Complete home remodel at Greenwood Avenue in Los Angeles

Remodeling Services

One Team for Every Room and Every Trade

Start with one room or take on the whole house. The same owner-led team plans and builds it all.

Learn moreLearn more

Why Choose Us

Discover Why 70%+ of Our Work Comes from Word of Mouth

One owner-led path connects scope, design, permits, construction, and final details.

Learn moreLearn more

Permits, Plans, and City Coordination

Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.

  • We review permit needs early.
  • We coordinate plans and documentation with the remodel scope.
  • We treat inspections as part of the process, not an afterthought.
  • We connect design decisions to build requirements through one accountable team.
Get My Free Estimate

Scope Clarity Before Construction

Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.

  • We discuss the scope before work begins.
  • We clarify material priorities early.
  • We surface potential cost drivers during planning.
  • We explain changes before moving forward.
Get My Free Estimate

A Schedule Based On Real Work

We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.

  • We connect milestones to actual work phases.
  • We coordinate trades through one accountable team.
  • We communicate delays and decisions clearly.
  • We include the final walkthrough in the schedule.
Get My Free Estimate

Communication Without Chasing

You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.

  • We provide regular updates during active work.
  • We clarify the decisions you need to make next.
  • We keep design and construction connected through one team.
  • Our owners stay involved through key project moments.
Get My Free Estimate

Remodeling Projects

Homes Their Owners Are Proud to Show

See what the Quality First commitment looks like in practice, from single rooms to whole-home remodels.

See All ProjectsSee All Projects
Montana Avenue Santa Monica complete home remodel

01

Complete Home Remodel in Santa Monica

    Get My Free EstimateMore details
    Kitchen with white cabinets, a gray tile backsplash and a peninsula in our Santa Monica remodel

    02

    Complete Home Remodel in Santa Monica

      Get My Free EstimateMore details
      Flores De Oro South Pasadena complete home remodel

      03

      Complete Home Remodel in South Pasadena

        Get My Free EstimateMore details

        Our Story

        Eli Leads the Build. Donna Guides the Design.

        You work with an owner-led team that carries your plan from early choices through final details.

        Learn moreLearn more
        More about us
        Eli and Donna of Quality First Builders in a completed Los Angeles kitchen

        What That Means for Your Remodel

        • One in-house path from plans and permits through final details.
        • Construction accountability led by Eli.
        • Design guidance connected to field needs.
        • One project record for scope and decisions.
        • Clear updates during active work.
        • Changes reviewed before related work continues.
        • A quality review and final walkthrough.

        Our Process

        A Clear Path From First Idea to Final Walkthrough

        One process links goals, design, permits, choices, construction, updates, and closeout.

        Learn moreLearn more
        1. Scope Review and Consultation

          We walk the whole house with you: which rooms fail, where light dies, what the layout blocks. You share the goal; we listen for the constraints.

        2. Design, Scope, and Budget Planning

          Room by room, Donna builds one design direction: layout, materials, flooring, light. Eli keeps each decision priced and buildable before it locks.

        3. Plans, Permits, and Schedule

          Planning approval comes first in Malibu, and its stamp opens building plan check. We handle story poles, notices and any outside agency reviews. Then we sequence every trade across the whole house.

        4. Construction and Updates

          Construction runs on our own crews and one manager, with daily updates inside the city's work hours. Protection and phasing keep part of the house yours throughout.

        5. Final Walkthrough and Completion

          We review every room against the agreed scope, down to paint edges and cabinet doors. The finish has to hold up to daily life, not just photos.

        FAQ

        Clear Answers Before You Commit

        Learn about project fit, proof, design, permits, updates, changes, and living through construction.

        Learn moreLearn more
        What Malibu home remodeling projects are a fit?

        Whole-house and multi-room remodels fit best, along with additions and major renovation projects. Our general minimum is $30,000, and we take residential work only. Keep in mind that an addition changes the footprint or the building envelope, so it falls outside Malibu's definition of a remodel and must meet current development standards.

        Which completed projects can I review?

        You can explore completed projects on this page and in our gallery. Our closest whole-home work is in Santa Monica. On Montana Avenue we remodeled a condo's kitchen and both bathrooms, and we redid every interior door. On 16th Street, Jeff and Joleen came to us after trouble with an earlier contractor and designer, and we remodeled the whole house. Each project shows its city and scope, so you can compare it with your own plans.

        Can one team handle design, permits, and construction?

        Yes. We handle the design guidance, permits, scheduling and construction as one licensed general contractor, CSLB license #990316. The City of Malibu tells homeowners to check any contractor with California's Contractors State License Board before hiring, and our license is easy to look up. You deal with one team instead of separate contractors.

        Who leads my remodel?

        Eli leads construction and accountability. Donna guides layouts, materials, and finishes. Both stay involved.

        How do you define the scope?

        We start with your goals, the site and the house as it stands. All of Malibu lies inside the California coastal zone. If more than half the length of the exterior walls is removed or replaced, the house becomes a replacement structure. It loses its grandfathered status and must meet today's coastal rules, setbacks included, through a coastal development permit. So we total every piece of wall work that counts, including sistered studs and enlarged windows. On septic, a new bedroom, bathroom or prep sink adds load, and the city's Environmental Health office can ask for an upgrade. Cost drivers go into a written quote before crews start.

        How are design choices organized?

        Donna works through style and selections with you before construction. On 16th Street she made recommendations from cabinet pulls to door handles, and the owners never had to dig through endless samples.

        How do permits affect timing?

        The city's reviews come before construction, so they set your start date. Planning approval comes first, and its stamp opens building plan check. A coastal development permit needs story poles to show height unless the Planning Manager waives them. On an administrative coastal permit, a sign goes up at the house and neighbors within 500 feet get a notice by mail. If the application is incomplete, the planner sends a letter within 30 days. After the decision comes an appeal period, then the stamp. When outside reviews apply, we send plans to the Los Angeles County Fire Department and Water District 29.

        What happens if hidden conditions appear?

        We show you the condition and the fix, with its effect on cost and schedule, before related work continues. In Malibu, rotten framing is also a permit question. Replacing studs or headers in an exterior wall counts toward the 50 percent threshold, so we track the affected wall length as work proceeds. New siding, drywall, insulation and wiring do not count, so we lean on those upgrades wherever the framing can stay.

        How often will I receive updates?

        Daily updates during active work. Progress, questions, and upcoming decisions stay visible. We also build the schedule inside the city's work hours: 7 AM to 7 PM on weekdays, 8 AM to 5 PM on Saturdays, and none on Sundays or city holidays.

        What happens during the first consultation?

        We talk through your goals and the likely scope to see if the project fits. Bring what you know about the property, such as whether it runs on septic and when the system was last inspected. Malibu's residential septic operating permits last 5 years for a conventional system and 3 years for an advanced one. Before design, you can also book an optional meeting with a city planner. It costs $191, and the fee is not refundable. Our advice draws on our experience with whole-home remodels in Santa Monica and Culver City.

        Free Consultation

        Plan Your Malibu Home Remodel

        Start with project fit and your goals. No construction commitment is made during the first conversation.

        Learn moreLearn more