310-388-3397
Get free consultation

The Better Way to Remodel a Kitchen in Beverly Hills

Get the kitchen you actually want, without losing your kitchen for months.

Remodel with the confidence of a design-build process refined over 10+ years to eliminate cabinet delays, Beverly Hills permit delays, and months without a kitchen.

  • No-Obligation
  • Transparent Roadmap
  • Clear Timeline & Budget
Dining room with a wood farmhouse table open to the remodeled kitchen in Santa Monica
White kitchen with a long island and built-in refrigerator in our Culver City custom home
Modern white kitchen with a dark wood island and wall ovens in our South Pasadena remodel
  • 200+

    Homeowners served across Los Angeles

  • Family-Owned

    One accountable team from kitchen plan to final walkthrough

  • 10+

    Years remodeling Los Angeles kitchens and homes

  • Fully In-House

    Design, permits, selections, and construction coordinated together

Planning a Kitchen Remodel

A Kitchen That Finally Works the Way Your Family Does

Room to cook together. Storage that makes sense. Light where you work. What stands between you and that kitchen is a hundred decisions and a dozen trades. In Beverly Hills, your kitchen permit comes from the city's Building and Safety Division, and your plans are checked against the 2025 California codes. One in-house team carries both, including:

  • A layout planned around how you actually cook and gather
  • Design guidance for cabinets, counters, and finishes, so nothing clashes
  • A defined scope, budget, and schedule before demolition starts
  • Our own licensed crews handling plumbing, electrical, and installation
  • Lighting, ventilation, and storage details built to last

You make the choices that matter. We carry them through to the finished kitchen.

Plan my Beverly Hills kitchen
Completed kitchen remodel at Gothic Avenue in Granada Hills

Kitchen Services

Every Piece of the Kitchen, Handled by One Team

From cabinetry to ventilation, each part is planned and built in-house, so the finished kitchen works as one design.

Learn moreLearn more

Why Choose Us

Discover Why 70%+ of Our Work Comes from Word of Mouth

Resolve the layout, scope, selections, permit path, schedule, and household disruption through one connected design-build process.

Learn moreLearn more

Permits, Plans, and City Coordination

Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.

  • We review permit needs early.
  • We coordinate plans and documentation with the remodel scope.
  • We treat inspections as part of the process, not an afterthought.
  • We connect design decisions to build requirements through one accountable team.
Get My Free Estimate

Scope Clarity Before Construction

Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.

  • We discuss the scope before work begins.
  • We clarify material priorities early.
  • We surface potential cost drivers during planning.
  • We explain changes before moving forward.
Get My Free Estimate

A Schedule Based On Real Work

We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.

  • We connect milestones to actual work phases.
  • We coordinate trades through one accountable team.
  • We communicate delays and decisions clearly.
  • We include the final walkthrough in the schedule.
Get My Free Estimate

Communication Without Chasing

You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.

  • We provide regular updates during active work.
  • We clarify the decisions you need to make next.
  • We keep design and construction connected through one team.
  • Our owners stay involved through key project moments.
Get My Free Estimate

Kitchen Projects

Homes Their Owners Are Proud to Show

See what the Quality First commitment looks like in practice, from compact kitchens to full open-plan remodels.

See All ProjectsSee All Projects
White galley kitchen with a gray tile backsplash and a stainless gas range in our Granada Hills remodel

01

Kitchen Remodel in Granada Hills

    Get My Free EstimateMore details
    Kitchen with navy lower cabinets, a farmhouse sink and wood floors in our Santa Monica kitchen remodel

    02

    Kitchen Remodel in Santa Monica

      Get My Free EstimateMore details
      Long kitchen with white cabinets, glass pendants and wood floors in our North Hollywood remodel

      03

      Kitchen Remodel in North Hollywood

        Get My Free EstimateMore details

        Our Story

        Eli Leads the Build. Donna Guides the Design Decisions.

        Beverly Hills homeowners work with one family-run design-build team. We connect the desired kitchen with its scope, schedule, and construction needs.

        Learn moreLearn more
        More about us
        Eli and Donna of Quality First Builders in a completed Los Angeles kitchen

        What That Means for Your Kitchen

        • Owner involvement from early priorities through closeout
        • Layout and finish guidance connected to buildability
        • Scope, selections, permits, ordering, and schedule coordinated together
        • Licensed, bonded and insured construction under CSLB license 990316
        • Regular updates and visible next decisions
        • Protection and trade coordination during active work
        • A final walkthrough before completion

        Our Process

        From Daily Frustrations to a Buildable Plan

        Five steps keep scope, design, permits, construction, and final review connected from the first conversation to the final walkthrough.

        Learn moreLearn more
        1. Scope Review and Consultation

          First visit happens at your kitchen counter. We look at layout, storage, light, and how your family moves. We flag street-facing windows early, since changing one in the Central Area brings in design review. Then we talk scope and cost.

        2. Design, Scope, and Budget Planning

          Donna turns your direction into a working design: layout, cabinetry, counters, tile and lighting as one plan. Eli prices the construction behind each choice in an itemized estimate, so design and budget move together.

        3. Plans, Permits, and Schedule

          We line up permits with the Beverly Hills Building and Safety Division and place cabinet and appliance orders early. Lead times set the schedule more than labor does. We confirm any window change's review path with the city first.

        4. Construction and Updates

          Demolition, rough plumbing and electrical, drywall, cabinets, counters, tile and paint follow a fixed order. Our own crews handle it all and check the existing wiring before rough electrical. You get daily updates and a temporary cooking plan.

        5. Final Walkthrough and Completion

          We close with a detail check: doors, drawers, grout lines, caulk, and lighting. Then the kitchen has to pass the real test, a full family dinner.

        FAQ

        Kitchen Remodeling in Beverly Hills: Planning, Timing, Permits, and Project Fit

        Start with the planning, schedule, permit, budget-control, communication, and project-fit questions homeowners most often ask before construction.

        Learn moreLearn more
        What drives the cost of a kitchen remodel in Beverly Hills?

        Our minimum project is $30,000. Above that, the main costs are cabinetry, countertops, appliances, layout changes, utilities and the finish level you choose. Hidden conditions and permits account for the rest. You get a written, itemized estimate after we measure your actual kitchen. We never guess at the price over the phone. On our Petit Avenue kitchen in Northridge, other bidders glanced at the room and named a number in minutes. Eli and Donna measured and took photos. A few days later, they came back with a line-by-line estimate and digital renderings.

        How long does a kitchen remodel take?

        Timing depends on design, permits, lead times, utility or structural work, inspections and the order of construction. Beverly Hills allows construction Monday through Friday from 8 am to 6 pm and never on holidays, so we build the calendar on weekdays only. During planning, we work out how those pieces fit together. You get a clear timeline before demolition starts. More than a decade of experience helps us schedule the trades realistically. We remodeled Jennifer's Oxford Avenue kitchen. She says Eli was honest about the timeline and kept the work on time and on budget.

        Will my kitchen project require permits?

        That depends on scope. Moving walls, gas, or plumbing usually means a permit from the Beverly Hills Building and Safety Division, and finish-only work may not. Plans must meet the 2025 California codes plus the city's amendments, in force since January 1, 2026. Any project valued at $1,000 or more needs a licensed contractor, unless you qualify as an owner-builder. In the Central Area, interior kitchen work skips design review, but changing a window visible from a public street brings it in. A like-for-like swap, or wood, fiberglass, aluminum clad or steel, can usually be permitted at the public counter. Vinyl cannot. Historic properties may also need historic review. We coordinate the permit and inspections either way. The city decides, not the contractor.

        Can we live at home during the remodel?

        Often yes, at least for part of the project. It depends on demolition, utilities, dust control, and how your family uses the space. Scott and Ali were home the entire time during our Gardenstone Lane kitchen remodel in Woodland Hills. We pushed walls out into old garage space for Amy and Peter's Duxbury Place kitchen in Los Angeles. They stayed with friends until it was done. We plan protection and access first, and talk honestly about the loud weeks.

        When should cabinets, appliances, and finishes be selected?

        Before demolition, early enough to lock in dimensions, utilities, lead times, and the order of installation. Cabinetry, appliances, plumbing fixtures, tile, and the backsplash all affect design and schedule. An induction cooktop changes the electrical plan, and an island prep sink changes the plumbing. If your house was built on or before January 1, 1994, state law adds a rule before final permit sign-off. With a few exceptions, every faucet in the house over 2.2 gallons a minute, toilet over 1.6 gallons a flush and showerhead over 2.5 gallons a minute must be replaced with a water-saving model. On our Duxbury Place kitchen, Amy shopped with Donna for slabs and appliances. Early selections keep the style consistent.

        What happens if we change the scope after construction starts?

        We price and explain it first. Changes touch ordering, permits, sequencing and timing more than most owners expect. Nothing proceeds until you have signed off on the new direction. Tory's 1961 house in Culver City was due for an upgrade. During our Shedd Terrace kitchen project there, a termite inspection found a failed shower pan. Tory added the primary bathroom by change order. Eli explained each added cost clearly, including bringing the electrical up to code. Beverly Hills began allowing Romex cable for work in January 2008, so an older kitchen may hide a different wiring system.

        How do you reduce dust and day-to-day disruption?

        Kitchen construction is disruptive, but planning makes it manageable. Before demolition, we walk you through protection, access, debris removal, and the order the trades arrive in. In Beverly Hills, construction debris leaves in a temporary roll-off bin from the city's own Rolloff Division. In Trousdale Estates, no more than two work vehicles per job may park on the street. Sheryl and Ronald, whose Farmdale Avenue kitchen and pantry we remodeled in North Hollywood, say the crew arrived on time and cleaned up every day. You get updates as milestones change, and we review the results with you at the final walkthrough.

        Can you help improve the layout and guide the design?

        Yes. Donna, our designer, handles kitchen design decisions: layout, cabinetry, counters, lighting, and the balance of style and functionality. On our Gothic Avenue kitchen in Granada Hills, we counted spice jars to work out how many drawers the family needed and how wide each should be. Evelin was second-guessing every pick at the store, so Donna helped her choose the colors and finishes for her Waterburry Street kitchen in Woodland Hills. Modern, contemporary, or classic, the designs stay buildable because Eli checks them against the construction plan. Durability counts as much as looks.

        Do you work outside Beverly Hills?

        Yes. We work with clients across the Westside and the San Fernando Valley. In Bel Air, we remodeled a primary suite and turned a bedroom into an office. In Brentwood, a first-floor remodel included a full new kitchen. Our Oxford Avenue kitchen remodel in Los Angeles shows the standard up close. We bring the same crews and standards to every kitchen, including yours in Beverly Hills.

        Free Consultation

        Start Planning My Beverly Hills Kitchen

        Tell us what is not working and what you want the kitchen to do better. We review project fit, design, scope, permits, timing, and budget considerations before you commit.

        Learn moreLearn more