“All permits were approved on time, which was impressive because navigating the Santa Monica permitting process is not easy.”

200+
Homeowners served across Los Angeles

Family-Owned
One accountable team from kitchen plan to final walkthrough

10+
Years remodeling Los Angeles kitchens and homes

Fully In-House
Design, permits, selections, and construction coordinated together
Planning a Kitchen Remodel
A Kitchen That Finally Works the Way Your Family Does
Room to cook together. Storage that makes sense. Light where you work. When kitchen remodeling in Calabasas moves walls, wiring or plumbing, expect review by the city's Building and Safety Division. Add a hundred choices and a dozen trades, and you need one in-house team that covers:
- A layout planned around how you actually cook and gather
- Design guidance for cabinets, counters, and finishes, so nothing clashes
- A defined scope, budget, and schedule before demolition starts
- Our own licensed crews handling plumbing, electrical, and installation
- Lighting, ventilation, and storage details built to last
You make the choices that matter. We carry them through to the finished kitchen.
Plan my Calabasas kitchen
Kitchen Services
Every Piece of the Kitchen, Handled by One Team
From cabinetry to ventilation, each part is planned and built in-house, so the finished kitchen works as one design.
Learn moreLearn more
Complete Kitchen Remodels
A full redesign built around how your family cooks and gathers.

Custom Cabinetry
Storage planned to the inch, like the olive green Shaker cabinets and white oak hood on our Poe Ave. remodel.

Countertops and Backsplashes
Materials matched to the way you cook and clean, with help picking tile, backsplash, countertops and hardware.

Lighting and Electrical
Task and accent light exactly where you need it, with older electrical brought up to code.

Flooring and Plumbing
The technical work that keeps beautiful finishes performing, from new plumbing to outlets brought up to code.

Appliances and Ventilation
Clean paneling, precise clearances, and ventilation that works quietly.
Why Choose Us
Discover Why 70%+ of Our Work Comes from Word of Mouth
Resolve the layout, scope, selections, permit path, schedule, and household disruption through one connected design-build process.
Learn moreLearn morePermits, Plans, and City Coordination
Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.
- We review permit needs early.
- We coordinate plans and documentation with the remodel scope.
- We treat inspections as part of the process, not an afterthought.
- We connect design decisions to build requirements through one accountable team.
Scope Clarity Before Construction
Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.
- We discuss the scope before work begins.
- We clarify material priorities early.
- We surface potential cost drivers during planning.
- We explain changes before moving forward.
A Schedule Based On Real Work
We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.
- We connect milestones to actual work phases.
- We coordinate trades through one accountable team.
- We communicate delays and decisions clearly.
- We include the final walkthrough in the schedule.
Communication Without Chasing
You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.
- We provide regular updates during active work.
- We clarify the decisions you need to make next.
- We keep design and construction connected through one team.
- Our owners stay involved through key project moments.
Kitchen Projects
Homes Their Owners Are Proud to Show
See what the Quality First commitment looks like in practice, from compact kitchens to full open-plan remodels.
See All ProjectsSee All ProjectsOur Story
Eli Leads the Build. Donna Guides the Design Decisions.
Calabasas homeowners work with one family-run design-build team. We connect the desired kitchen with its scope, schedule, and construction needs.
Learn moreLearn more
What That Means for Your Kitchen
- Owner involvement from early priorities through closeout
- Layout and finish guidance connected to buildability
- Scope, selections, permits, ordering, and schedule coordinated together
- Bonded and insured, with a California general contractor license you can check with the CSLB
- Regular updates and visible next decisions
- Protection and trade coordination during active work
- A final walkthrough before completion
Our Process
From Daily Frustrations to a Buildable Plan
Five steps keep scope, design, permits, construction, and final review connected from the first conversation to the final walkthrough.
Learn moreLearn moreScope Review and Consultation
We start with what you want to change, what is not working in your kitchen, and what may limit the project. Our minimum project is $30,000, and that is part of the fit check.
Design, Scope, and Budget Planning
Once the project direction is clear, we help organize the design and scope. Donna helps homeowners make design choices that fit the home and lifestyle. Eli helps connect those choices to the construction realities.
Plans, Permits, and Schedule
Drawings, permits and inspections are built into the plan. In Calabasas, that can mean a building permit plus separate electrical, plumbing or mechanical permits. Your schedule also leaves out the federal holidays when the city bars construction work.
Construction and Updates
The construction phase is managed by an accountable team that keeps the work moving, coordinates trades, and keeps you informed as milestones are reached.
Final Walkthrough and Completion
At the end of the project, we review the finished work with you, handle final details, and make sure the result feels right before calling the remodel complete.
FAQ
Kitchen Remodeling in Calabasas: Planning, Timing, Permits, and Project Fit
Start with the planning, schedule, permit, budget-control, communication, and project-fit questions homeowners most often ask before construction.
Learn moreLearn moreWhat drives the cost of a kitchen remodel in Calabasas?
Our minimum project is $30,000, so a kitchen we take on starts there. Above that, major cost drivers include layout changes, cabinetry, surfaces, appliances, an island or peninsula change, utilities, structure and finishes, plus permits and hidden conditions. Every kitchen renovation gets a project-specific range after we review the actual space. In James's 1955 Northridge kitchen, we replaced the outdated plumbing and brought the outlets up to code, and his family got an itemized estimate, so they could see what each part cost.
How long does a kitchen remodel take?
Timing depends on design and permits, on lead times, and on any utility or structural work. Inspections and the construction sequence set the rest. We map those dependencies during planning, and more than a decade of remodeling experience helps us sequence trades realistically. In Northridge, other contractors promised James a much faster kitchen. Eli explained why that pace was unrealistic, and the job finished on the schedule we gave them.
Will my kitchen project require permits?
Permit requirements depend on the work. Structural changes and many electrical, plumbing, or mechanical alterations commonly require review in Calabasas, CA. The city's Building and Safety Division publishes its own Residential Kitchen Checklist and a handout on work exempt from permits. We coordinate the applicable permit and inspection path, including the inspections we request from Building and Safety. The city makes the final determination, not the contractor.
Can we live at home during the remodel?
Many households stay home for part of a kitchen remodel, and some stay for all of it. Scott and Ali in Woodland Hills were home the entire time, and so was James's family in Northridge. Whether staying home works for you depends on the scope and your household's daily needs. Before work begins, we review protection, dust control and access. We also cover major utility interruptions and whether you need a temporary cooking setup or time away.
When should cabinets, appliances, and finishes be selected?
Early enough to lock in dimensions, utilities, lead times, and installation sequencing. Cabinetry, appliances, plumbing fixtures, tile, and the backsplash can affect design and schedule. Selecting them early keeps the style consistent through the space. In Woodland Hills, Eli designed Joe and Evelin's new kitchen, and Donna chose the colors and finishes. Evelin kept second-guessing her countertop and flooring picks at Home Depot until Donna helped her choose. Eli and Donna helped Scott and Ali pick their tile, backsplash, countertop material and even the hardware, and Donna went with Leslie and Robbie to pick their appliances.
What happens if we change the scope after construction starts?
A requested change can affect cost, ordering, permits, trade sequencing, and completion timing. We review the change, explain the likely impact, and get your sign-off on the revised direction before the related work proceeds. In a 1961 Culver City house, we were bringing the electrical up to code as part of a kitchen remodel when a termite inspection found a failed shower pan, so the owner added the primary bath by change order.
How do you reduce dust and day-to-day disruption?
Kitchen construction is disruptive, but planning makes it manageable. Before demolition, we plan how we protect the house and where debris goes. During the job, we keep trades and utility shutoffs in order and flag upcoming decisions early. Calabasas sets allowed construction hours, and our crews work inside them. Leslie and Robbie in Woodland Hills said our crew always kept the site clean. We update you when milestones change and review the results with you at the final walkthrough.
Can you help improve the layout and guide the design?
Yes. Donna guides the layout and cabinetry, along with surfaces, tile and lighting, whether you want a modern kitchen or a warmer classic one. Eli connects those choices to construction realities. One Granada Hills client works in home renovation television and brought Donna dozens of drawings and vision boards. Donna turned them into one kitchen design. A full remodel and a focused upgrade both follow the same connected process, with craftsmanship you can see in the daily details.
Do you work outside Calabasas?
Yes. Our clients span the west valley, and we take projects toward Westlake Village. We have completed kitchens near Calabasas in Woodland Hills and West Hills. The business is based in Los Angeles, and the same crews travel to every site.
Free Consultation
Start Planning My Calabasas Kitchen
Tell us what is not working and what you want the kitchen to do better. We review project fit, design, scope, permits, timing, and budget considerations before you commit.
Learn moreLearn more








