Skip to article
310-388-3397
Get free consultation

Home Remodeling

What Does a Laundry Room Remodel Cost in Los Angeles?

Written by
Eli Ezra, owner and general contractor at Quality First Builders
Eli EzraFounder and General Contractor
Published
Reading time7 min read

Plan on roughly $15,000 to $35,000 for a complete laundry room remodel in Los Angeles when the washer and dryer stay in an existing utility-ready room. A cosmetic update can cost less. Moving the laundry or adding substantial plumbing, electrical, ventilation, cabinetry, or structural work can raise the project to $35,000 to $75,000 or more.

A new folding counter can make laundry easier without moving a single pipe. Move the machines across the house, however, and the contractor must create a workable drain and dryer exhaust route before the cabinets go in. That layout decision does more to set the budget than the room’s size.

Cost by project type

ScopeEarly planning allowanceCommon work
Cosmetic refresh$5,000 to $15,000Paint, flooring, light fixture, shelves, limited finish changes
Full remodel in place$15,000 to $35,000Cabinets, counter, sink, finishes, appliance connections, lighting, repairs
Premium utility room$25,000 to $50,000+Custom storage, sink, tile, upgraded appliances, drying space, detailed millwork
Laundry relocation$35,000 to $75,000+New supply and drain lines, power or gas, vent route, walls, permits, repairs to old area

Use these early planning allowances until you have a quote for the room. Decide whether the budget includes new appliances before comparing proposals. A $25,000 renovation with the existing washer and dryer is a different purchase from a $25,000 package that must also pay for new machines.

Keeping utilities in place saves the most money

The least disruptive plan keeps the washer box, drain, dryer power or gas, and exhaust near their current locations. Cabinets and counters can still change how the room works without moving the expensive infrastructure.

Relocation becomes attractive when the existing laundry is in a garage, an awkward hallway, or far from the bedrooms. It also creates two jobs: build the new room and repair the old one. The old hookups need to be safely closed off. Include repairs to the walls and floor, along with the former exterior vent opening, so the old room is usable too.

Before settling on a new location, have the contractor trace the drain and dryer exhaust. The nearest wall is not always the shortest workable route.

Plumbing must handle more than two hoses

A laundry needs hot and cold water, shutoff valves, and a drain sized and vented for the washer. Adding a utility sink introduces another fixture and cabinet layout constraint.

Older piping may be corroded or poorly placed. A second-floor laundry also deserves careful leak protection. A drain pan, accessible shutoffs, a leak sensor, and a deliberate floor detail cost less than repairing the ceiling below.

Ask where the washer discharges and whether the new layout changes the venting or drain route. A cabinet drawing cannot answer that question.

Electrical, gas, and dryer ventilation

Many conventional electric dryers require a dedicated 208/240-volt circuit; some compact models use 120 volts. Gas dryers still need electricity as well as a gas connection. Have the electrician check the selected model’s installation instructions and the home’s available capacity before pricing a new circuit or panel work.

The dryer exhaust should take a short, code-compliant route outdoors. Long runs and excessive elbows reduce performance and collect lint. Ventless heat-pump dryers can solve some layout problems, but appliance dimensions, electrical needs, drain requirements, and drying behavior should be checked before cabinets are ordered.

Do not bury shutoffs or junctions behind a machine that cannot be moved without dismantling the room.

Custom cabinetry in a completed Quality First Builders Los Angeles remodel
Custom cabinetry in a completed Quality First Builders Los Angeles remodel

Cabinets and counters can crowd the appliances

Measure the selected washer and dryer, including doors, hoses, plugs, vibration clearance, and service access. “Standard size” is not precise enough for built-in cabinetry.

Side-by-side machines create a useful folding counter if the controls remain accessible. Stacked units free floor space for a sink or tall cabinet. Pedestals improve loading height but may conflict with shelves or counters.

Custom cabinets make sense when every inch matters. Stock cabinets can control cost in a more forgiving room. In both cases, leave enough room to replace an appliance later.

Plan storage around what actually lands in the room. Leave a home for laundry baskets so they do not block the machine doors. Put cleaning supplies within adult reach, with secure storage where children could access them. A clear folding surface and lighting above it often improve daily use more than another row of cabinets.

Finishes should tolerate water and vibration

Porcelain tile and resilient flooring are common because they handle spills. Wood can work with careful detailing, but a leaking supply hose can damage it quickly. The floor beneath the machines needs to be level so they do not walk across the room during a spin cycle.

A tile backsplash is useful behind a sink. Full-height decorative tile is a design choice, not a laundry requirement. Fund safe utility connections and leak protection first. Then choose flooring and paint that suit the room’s moisture exposure. Decorative finishes can use the budget left after the laundry works properly.

Permits and schedule

Moving or adding plumbing, electrical, gas, walls, windows, or doors can require permits and inspections. Confirm the exact scope and address with the local building department before work begins.

A remodel that keeps utilities in place may take three to six weeks after materials arrive. For relocation or custom cabinetry, allow roughly six to ten weeks on site as an early planning window. Design and permitting come before construction; confirm cabinet and appliance lead times separately. The laundry will be unavailable during part of that period, so plan an alternative before demolition.

What a complete quote should show

  • Appliance models and whether purchase or installation is included
  • Demolition and protection
  • Plumbing, drainage, electrical, gas, and vent work
  • Cabinet specifications, including box construction and hardware
  • Counter and backsplash allowances
  • Flooring and baseboard; drywall repairs with matching paint and trim
  • Leak protection and shutoff access
  • Permit responsibility and inspections
  • Repair of adjacent rooms and the former laundry location
  • Appliance setup and testing, followed by cleanup

Set a firm budget for the laundry room renovation, then price the utility work before choosing custom storage. Ask us at Quality First Builders to compare keeping the machines in place with the arrangement you want. We can price both options with the same appliances and finish quality.

Frequently asked questions

How much does it cost to add cabinets to a laundry room?

A modest stock-cabinet and counter package may run several thousand dollars as an early allowance. Custom storage costs more when it needs special sizes or finished end panels. Price the counter and hardware with the installation, then check that doors and drawers clear the appliances.

Is moving a washer and dryer expensive?

It can be. New water, drain, electrical or gas, and dryer exhaust routes often cost more than the visible finishes. Repairs to both the new and old spaces must also be included.

Do I need a permit to remodel a laundry room in Los Angeles?

Finish-only work may not, but changed plumbing, electrical, gas, ventilation, or structure commonly does. Confirm the actual scope with the authority for the address.

Should a second-floor laundry have a drain pan?

A pan, accessible shutoffs, and a leak sensor are sensible protections. The drain detail and local requirements should be reviewed by the project team.

How long will the laundry be unusable?

Often several weeks for a full remodel. Confirm the shutdown window in the schedule and do not reconnect appliances before the utilities and finishes are ready.