310-388-3397
Get free consultation

The Better Way to Remodel in Malibu

Your dream home built by one award-winning team, in record time.

Remodel with the confidence of a design-build process refined over 10+ years to eliminate Malibu permit delays, stress, and uncertainty.

  • No-Obligation
  • Transparent Roadmap
  • Clear Timeline & Budget
White kitchen with a long island and built-in refrigerator in our Culver City custom home
Open ADU living area with a blue kitchen island and a black sofa in our Tarzana ADU
Kitchen with a skylight, green glass pendants and a marble island in our Arcadia home remodel
  • 200+

    Happy customers across Los Angeles

  • Family-Owned

    And operated with owners on every job

  • 10+

    Years remodeling Los Angeles homes

  • Fully In-House

    Permits to finishes handled by one team

Planning a Project in Malibu

A Malibu Home Built for the Coast It Sits On

Salt air, sun, and slope test every material choice in Malibu. Coastal review can shape what gets approved and when. A residential builder here has to plan for both the ocean and the process. We keep all of it with one team, including:

  • A walkthrough of your home and an honest read on what's possible
  • Design guidance and materials chosen for coastal exposure
  • City and coastal approvals coordinated for you, with updates at every milestone
  • A defined scope, budget, and schedule before crews start
  • Our own licensed, bonded, and insured crews at every phase

The ocean sets the rules here. We build to them.

Plan My Malibu Project
Complete home remodel at Montana Avenue in Santa Monica

Our Services

Remodeling, Additions, Custom Homes, and Qualifying ADUs

One team links the design, scope, permits, materials, construction, updates, and final details.

Learn moreLearn more

Why Choose Us

Discover Why 70%+ of Our Work Comes from Word of Mouth

Avoid broken handoffs between design, permits, materials, trades, and updates. Eli, Donna, and your project manager keep the work connected.

Learn moreLearn more

Permits, Plans, and City Coordination

Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.

  • We review permit needs early.
  • We coordinate plans and documentation with the remodel scope.
  • We treat inspections as part of the process, not an afterthought.
  • We connect design decisions to build requirements through one accountable team.
Get My Free Estimate

Scope Clarity Before Construction

Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.

  • We discuss the scope before work begins.
  • We clarify material priorities early.
  • We surface potential cost drivers during planning.
  • We explain changes before moving forward.
Get My Free Estimate

A Schedule Based On Real Work

We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.

  • We connect milestones to actual work phases.
  • We coordinate trades through one accountable team.
  • We communicate delays and decisions clearly.
  • We include the final walkthrough in the schedule.
Get My Free Estimate

Communication Without Chasing

You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.

  • We provide regular updates during active work.
  • We clarify the decisions you need to make next.
  • We keep design and construction connected through one team.
  • Our owners stay involved through key project moments.
Get My Free Estimate

Remodeling Projects

Homes Their Owners Are Proud to Show

See what the Quality First commitment looks like in practice, from single kitchens to whole homes.

See All ProjectsSee All Projects
Kitchen with a white marble waterfall island and matching marble floors in our Westlake remodel

01

Complete Home Remodel in Westlake

  • Expanded primary suite with separate closets
  • Freestanding tub, separate shower, and private toilet room
  • Two individually tiled fireplaces within one design theme
  • Waterfall-edge kitchen island
  • Outdoor barbecue kitchen with new concrete, tile, and artificial turf
Get My Free EstimateMore details
Bentley Avenue Culver City custom home

02

Custom Home Construction in Culver City

  • Near-complete demolition and full-home reconstruction
  • Rebuilt rear living space for future multigenerational use
  • Added powder room and pantry for improved function
  • Custom double-tier kitchen cabinetry
  • T-shaped island extension with table-style seating
Get My Free EstimateMore details
Kensington Court West Hills remodel and restoration

03

Complete Home Remodel in West Hills

    Get My Free EstimateMore details
    Kitchen with navy lower cabinets, a farmhouse sink and wood floors in our Santa Monica kitchen remodel

    04

    Kitchen Remodel in Santa Monica

      Get My Free EstimateMore details

      Our Story

      One Owner-Led Team From Goals to Final Details

      The same leaders stay tied to the design, permits, build, updates, and finish quality.

      Learn moreLearn more
      More about us
      Eli and Donna of Quality First Builders in a completed Los Angeles kitchen

      What Closely Managed Means

      • Eli and Donna stay connected to the project.
      • A dedicated project manager sends daily updates.
      • The build plan follows the design choices.
      • One team coordinates permits, materials, trades, and finishes.
      • Long-lead choices stay tied to the schedule.
      • The team explains changes before related work starts.
      • You review the agreed final details before closeout.

      Our Process

      A Clear Path From First Idea to Final Walkthrough

      One path links the design, scope, reviews, orders, build, updates, and final details.

      Learn moreLearn more
      1. Scope Review and Consultation

        The first conversation covers the honest basics: what is not working, what you want instead, and whether scope, budget, and timing line up.

      2. Design, Scope, and Budget Planning

        Donna helps shape design choices that fit the home and your life. Eli connects those choices to construction realities, so the plan stays buildable and priced.

      3. Plans, Permits, and Schedule

        Permits with the City of Malibu and inspections are sequenced into the schedule from the start. The plan reflects the real order of work.

      4. Construction and Updates

        Our own crews carry construction, with a dedicated project manager keeping trades coordinated and you informed as milestones land.

      5. Final Walkthrough and Completion

        The project closes with a walkthrough, final details, and an honest check that the result matches what we agreed.

      FAQ

      Clear Answers Before You Commit

      Which completed projects can I review?

      You can explore completed projects right on this page and in our project gallery. Each one shows the scope and finished details, so you can compare work like the project you have in mind.

      What Malibu projects may be a fit?

      Possible fits include whole-home remodels, kitchens, bathrooms, additions, custom homes, and qualifying ADUs. All residential; no commercial work. We first review the property, scope, budget goals, and timing.

      Can you manage the work if I am not onsite each day?

      Yes, for the right project. A project manager sends daily updates and tracks open choices. Some site visits or quick owner decisions may still be needed.

      What does fully in-house delivery mean?

      We link design guidance, permits, project management, trades, checks, construction, and final details under one California general contractor license. Any outside expert needed appears in the written scope, and no chain of contractors stands between you and answers.

      How do you handle privacy and property care?

      We plan access, work zones, protection, deliveries, and updates for the site. We do not promise zero noise, zero disruption, or total privacy.

      How do you manage long-lead items?

      We flag choices that may affect orders or timing. The schedule can still change due to vendors, reviews, shipping, site needs, or owner changes.

      Can you guarantee permits or review times?

      No. The path depends on the address, plans, and review agencies, not the contractor. We coordinate agreed filings, comments, changes, and checks.

      What can affect cost and schedule?

      Scope, structure, systems, finishes, access, site facts, permits, orders, and changes can affect cost. Design choices, studies, reviews, weather, and changes can affect timing. A clear price and plan need a clear project; experience shapes both.

      Does the 90-day ADU offer apply to every Malibu project?

      No. It covers a qualifying ADU build after approvals and site readiness. The offer is a legal, rent-ready ADU in 90 days with a 3-year warranty.

      What does We Work Till You Love It mean?

      We review the finished work against the agreed scope and address agreed final details before closeout. Service continues within the written contract.

      Free Consultation

      Plan Your Malibu Remodel With One Team

      Tell us what must stay and what needs to change. Share your plans, timing, and access needs. We will help define the right next step.

      Learn moreLearn more