“Permitting in Culver City is not easy. There were delays and hurdles. But Eli pushed through all of it.”

Owner-Led
Design and construction stay connected

Family-Owned
One family guides one project path

Clear Roles
Donna guides design. Eli leads construction.

Fully In-House
Planning through final details stays connected
Planning a Construction Project
A Build That Keeps Moving, With Every Trade Accounted For
Inside Glendale city limits, the City of Glendale, not Los Angeles County, permits your new home. We file every permit through the city's Glendale Permits portal, and regular plan check takes about 8 to 10 weeks from payment. One in-house team carries your build through that whole path, including:
- A site review against the city's zoning, hillside slope and fire hazard maps before anything is promised
- Engineering, the city's new single-family submittal package and plan check, managed under one roof
- A defined scope, budget, and schedule before crews start
- Our own licensed, bonded, and insured crews at every phase
- Each inspection booked in Glendale Permits before the 1:30 PM cutoff for next-day service, after we check the work ourselves
You watch the build take shape. We keep every moving piece accounted for.
Plan My Custom Home
Construction Services
From Ground-Up Builds to Structural Work

Ground-Up Construction
New homes from planning and permits to final delivery, or a full rebuild when the old house cannot be saved.

Structural Work
Foundations, seismic reinforcement, and open floor plans done safely, with Eli making the structural calls.

Room Additions
Second stories and expansions that feel original to the house.

Garage Conversions and ADUs
Existing space turned into legal living square footage.

Interior Remodels
Kitchens, bathrooms, and full interiors with lasting materials.

Exterior Work
Siding, stucco, roofing, and hardscape that protect the home.
Why Choose Us
Discover Why 70%+ of Our Work Comes from Word of Mouth
One owner-led path connects design, scope, permits, construction, and final details.
Learn moreLearn morePermits, Plans, and City Coordination
Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.
- We review permit needs early.
- We coordinate plans and documentation with the remodel scope.
- We treat inspections as part of the process, not an afterthought.
- We connect design decisions to build requirements through one accountable team.
Scope Clarity Before Construction
Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.
- We discuss the scope before work begins.
- We clarify material priorities early.
- We surface potential cost drivers during planning.
- We explain changes before moving forward.
A Schedule Based On Real Work
We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.
- We connect milestones to actual work phases.
- We coordinate trades through one accountable team.
- We communicate delays and decisions clearly.
- We include the final walkthrough in the schedule.
Communication Without Chasing
You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.
- We provide regular updates during active work.
- We clarify the decisions you need to make next.
- We keep design and construction connected through one team.
- Our owners stay involved through key project moments.
Custom Home Projects
Homes Their Owners Are Proud to Show
See what the Quality First commitment looks like in practice, from major rebuilds to ground-up custom homes.
See All ProjectsSee All ProjectsOur Story
Donna Guides Design. Eli Leads Construction.
One owner-led team carries your vision from early choices through final details.
Learn moreLearn more
What That Means for Your Custom Home
- One in-house path from planning through final details.
- Design guidance connected to build needs.
- Construction accountability led by Eli.
- One project record for scope and choices.
- Permit steps coordinated with the plan.
- Changes reviewed before related work starts.
- A quality review and final walkthrough.
Our Process
A Clear Path From First Idea to Final Walkthrough
One process links goals, design, permits, choices, construction, updates, and closeout.
Learn moreLearn moreScope Review and Consultation
We start with the property: its zone under Title 30 of the Glendale Municipal Code, plus the city's hillside slope, ridgeline and fire hazard maps. Then we test your home against what the lot allows.
Design, Scope, and Budget Planning
Donna develops the design from floorplan to finishes. Eli prices structure, site work, and systems as the plan grows, so cost tracks design in real time.
Plans, Permits, and Schedule
Ground-up projects live through plan check. We carry the engineering and drawings through City of Glendale review, then schedule the build to start inside the issued permit's 180-day window.
Construction and Updates
Our own crews handle grading, the foundation and framing, then systems and finishes, with daily updates. Glendale posts inspection results online, not on a paper card, so you see each sign-off when we do.
Final Walkthrough and Completion
We close with a full-home review and final details. The house is finished when it is ready for its first ordinary morning.
FAQ
Clear Answers Before You Commit
Learn about project proof, owner roles, design, permits, changes, timing, and closeout.
Learn moreLearn moreWhat new construction projects do you take on in Glendale?
We build custom homes and major ground-up residential projects on lots you already own in Glendale, California. We also handle full rebuilds when the existing structure no longer fits your plans or cannot be saved. After a December 2021 fire, we rebuilt Devin and Katie's nearly 100-year-old house on 7th Avenue in Los Angeles. Their only delay was the city's plan approval. We are a design-build contractor, so we do not sell finished homes from a model. Your floor plan, finishes and budget start with you.
Does the neighborhood affect what we can build?
Yes. Glendale's zoning standards are in Title 30 of the municipal code, and the city's Comprehensive Design Guidelines have separate chapters for single-family and hillside homes. When a project goes through Design Review, the city must find it consistent with those guidelines. Homes in a historic district have their own guidelines too. We review the location and the character of the surrounding community against all of them before the design direction is set.
What does in-house mean?
One team handles the job from design and blueprints through permits and inspections. We stay with you through the last finish, so you do not have to manage a separate architect and contractor. That is how Steve's Arcadia remodel passed every inspection on the first try.
Who guides design and who leads construction?
Donna guides layouts, materials, and finishes. Eli leads construction and accountability. On Flores De Oro in South Pasadena, Eli suggested lifting the roof, and we added about 1,200 square feet across four expansions. A dedicated project manager coordinates active work between them.
How are budget and selections aligned?
We connect scope, key choices, and budget before related work begins. Owners planning a long-term real estate investment see the cost drivers early, while alternatives are still open.
What site work happens before the build?
Grading, utility connections, and the foundation come before framing. Water and electric infrastructure belongs to the city's own utility, Glendale Water and Power, which must clear some projects. Electrical meter upgrades start with a meter spot request to its electrical engineering team. The city may also ask for a geotechnical report, or a property line survey when an inspector cannot find the line. Tighter urban lots can complicate access and staging, so we fold all of it into the schedule.
How are changes and updates handled?
We review a requested change and its likely effects before related work continues. If it changes the approved plans, your Glendale plan checker reopens the file for new uploads, and we prepare and submit that revision. A dedicated project manager answers your questions and keeps you current on progress and the decisions coming up next.
What can affect a construction schedule?
City approval usually sets the early pace. The city reviews and issues every permit online through its Glendale Permits portal. Regular plan check takes about 8 to 10 weeks from the day plan check fees are paid, and a plan check application stays valid for one year from submittal. Development review, such as Design Review, and a required geotechnical report can add steps for some lots in the area. After that, site conditions and your selections matter most, so we settle key choices before the crew needs them.
Can hidden conditions change the scope?
Yes. We review the condition, the needed response, and likely effects before added work starts. When an old house comes down, most Glendale permits also need the city's Renovation/Demolition Acknowledgement Form, and asbestos removal and demolition notices go to the South Coast AQMD under Rule 1403.
What happens after the walkthrough?
We review closeout details, final care, and any agreed remaining items with you. The finished home should match the architecture you approved on paper. We hold our own work to that standard. On Flores De Oro, Eli was not happy with the tile in a couple of finished bathrooms. We tore it out and redid it, even though the owner had not noticed anything wrong.
Free Consultation
Start With a Clear Plan for Your Glendale Custom Home
Share the property, goals, scope, timing needs, and budget range. We will discuss fit and a useful next step.
Learn moreLearn more








