310-388-3397
Get free consultation

The Better Way to Build in Thousand Oaks

Build with one team that answers for everything, start to finish.

Build new on your own lot with a design-build process refined over 10+ years to eliminate finger-pointing, missed inspections, and schedule slips.

  • No-Obligation
  • Transparent Roadmap
  • Clear Timeline & Budget
White kitchen with a long island and built-in refrigerator in our Culver City custom home
Kitchen with a skylight, green glass pendants and a marble island in our Arcadia home remodel
Living room with a white sofa, fireplace and dark ceiling beams in our Los Angeles new construction
  • Owner-Led

    Design and construction stay connected

  • Family-Owned

    One family guides one project path

  • Clear Roles

    Donna guides design. Eli leads construction.

  • Fully In-House

    Planning through final details stays connected

Planning a Construction Project

A Build That Keeps Moving, With Every Trade Accounted For

New construction in Thousand Oaks needs approval from two main city divisions before the first footing goes in. The Planning Division checks your lot against the zoning code and tells you which applications you need. The Building Division then reviews the plans, issues the permit and inspects the work. One in-house team carries your build through both, including:

  • Site review and structural planning before anything is promised
  • Engineering, plus plan check with the Thousand Oaks Building Division, all managed under one roof
  • A defined scope, budget, and schedule before crews start
  • Our own licensed, bonded, and insured crews at every phase
  • Each city inspection booked through the TO/24 portal, with the work ready before the inspector arrives

You watch the build take shape. We keep every moving piece accounted for.

Plan My Custom Home
New construction at 7th Avenue in Los Angeles

Construction Services

From Ground-Up Builds to Structural Work

One in-house team plans, permits, and builds at every scale.

Learn moreLearn more

Why Choose Us

Discover Why 70%+ of Our Work Comes from Word of Mouth

One owner-led path connects design, scope, permits, construction, and final details.

Learn moreLearn more

Permits, Plans, and City Coordination

Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.

  • We review permit needs early.
  • We coordinate plans and documentation with the remodel scope.
  • We treat inspections as part of the process, not an afterthought.
  • We connect design decisions to build requirements through one accountable team.
Get My Free Estimate

Scope Clarity Before Construction

Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.

  • We discuss the scope before work begins.
  • We clarify material priorities early.
  • We surface potential cost drivers during planning.
  • We explain changes before moving forward.
Get My Free Estimate

A Schedule Based On Real Work

We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.

  • We connect milestones to actual work phases.
  • We coordinate trades through one accountable team.
  • We communicate delays and decisions clearly.
  • We include the final walkthrough in the schedule.
Get My Free Estimate

Communication Without Chasing

You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.

  • We provide regular updates during active work.
  • We clarify the decisions you need to make next.
  • We keep design and construction connected through one team.
  • Our owners stay involved through key project moments.
Get My Free Estimate

Custom Home Projects

Homes Their Owners Are Proud to Show

See what the Quality First commitment looks like in practice, from major rebuilds to ground-up custom homes.

See All ProjectsSee All Projects
Bentley Avenue Culver City custom home construction

01

Custom Home Construction in Culver City

  • Near-complete demolition and full-home reconstruction
  • Rebuilt rear living space for future multigenerational use
  • Added powder room and pantry for improved function
  • Custom double-tier kitchen cabinetry
  • T-shaped island extension with table-style seating
Get My Free EstimateMore details
Open kitchen with exposed ceiling beams, linen pendant lights and a wood dining table at the island

02

New Construction & Room Addition in Los Angeles

  • Arched openings and warm Spanish-inspired cabinetry
  • Peninsula island with built-in bench seating
  • Custom Dutch door connecting to the side yard
  • Modern plastered kitchen hood and fireplace
  • Built-in seating nook, custom cabinetry, and paneled appliances
Get My Free EstimateMore details
Laundry nook with matte black lower cabinets, a brass sink and faucet, and white upper cabinets

03

Complete Home Remodel & Room Addition in South Pasadena

  • Approximately 1,200 square feet added across four expansions
  • Reconfigured kitchen and primary suite locations
  • Six bedrooms and five-and-a-half bathrooms
  • Secondary entertainment kitchen on the lower level
  • Carport-roof balcony for main-level outdoor entertaining
Get My Free EstimateMore details
Kitchen with a white marble waterfall island and matching marble floors in our Westlake remodel

04

Complete Home Remodel in Westlake

  • Expanded primary suite with separate closets
  • Freestanding tub, separate shower, and private toilet room
  • Two individually tiled fireplaces within one design theme
  • Waterfall-edge kitchen island
  • Outdoor barbecue kitchen with new concrete, tile, and artificial turf
Get My Free EstimateMore details

Our Story

Donna Guides Design. Eli Leads Construction.

One owner-led team carries your vision from early choices through final details.

Learn moreLearn more
More about us
Eli and Donna of Quality First Builders in a completed Los Angeles kitchen

What That Means for Your Custom Home

  • One in-house path from planning through final details.
  • Design guidance connected to build needs.
  • Construction accountability led by Eli.
  • One project record for scope and choices.
  • Permit steps coordinated with the plan.
  • Changes reviewed before related work starts.
  • A quality review and final walkthrough.

Our Process

A Clear Path From First Idea to Final Walkthrough

One process links goals, design, permits, choices, construction, updates, and closeout.

Learn moreLearn more
  1. Scope Review and Consultation

    We start with the land and the life you want on it. Before you talk with a city planner, we check the zoning, the slope and any oaks against your budget.

  2. Design, Scope, and Budget Planning

    Your floorplan, elevations, and finishes develop with Donna while Eli prices each layer of the house: foundation, framing, systems, and site work.

  3. Plans, Permits, and Schedule

    Planning applications go in first through the city's TO/24 portal, then building plan check. Review cycles are normal for ground-up work, so we sequence the build around them.

  4. Construction and Updates

    Construction moves from dirt to drywall in planned order: site work, foundation, framing, systems, finishes. Daily updates track every phase.

  5. Final Walkthrough and Completion

    Thousand Oaks requires a certificate of occupancy before anyone lives in a new building. We walk the whole house with you, systems to surfaces, so your home starts with zero loose ends.

FAQ

Clear Answers Before You Commit

Learn about project proof, owner roles, design, permits, changes, timing, and closeout.

Learn moreLearn more
Do you build new homes in Thousand Oaks?

Yes. We build new homes for Thousand Oaks homeowners on lots they already own, from flat land to hillside properties, and we take on full residential rebuilds when a house is past saving. After we remodeled Nancy's family home in Woodland Hills, we built a second house from the ground up in the backyard, set near the property line and designed for light and privacy. If you are comparing new construction for sale in a builder's community, you choose from that builder's floor plans. On your own lot, the plan starts with how you live.

Which completed projects can I review?

Start with the project cards on this page. On 7th Avenue in Los Angeles, a December 2021 fire gutted Devin and Katie's nearly 100-year-old, 1,400-square-foot house. We rebuilt it on a new foundation, with a powder room and a Jack and Jill bath. On Bentley Avenue in Culver City, we took a house down almost completely and rebuilt it. Our closest documented job to Thousand Oaks is the Ridgeford Drive remodel in Westlake, also shown here.

How does the community shape a new build?

In Thousand Oaks, the community shapes it through the city's rules and the land itself. The Planning Division applies the zoning code and General Plan to your lot. Its forms include a Precise Plan of Design for a new single-family home, a hillside planned development permit, grading design review and oak tree verification. An HOA, where one applies, adds its own review. We find out which ones apply before design starts, so the plan accounts for them.

What does in-house mean?

One team owns the whole job. Donna designs, Eli runs the build, and our own crews do the work. When a question comes up on site, the person who designed it and the person building it are already talking, so you are not left waiting on an outside designer for an answer.

Who guides the design?

Donna guides layouts, materials, finishes, and linked choices, whether the direction is modern or traditional. Her role stays connected to construction needs.

Who leads construction?

Eli leads construction and accountability. A dedicated project manager coordinates active work and next steps.

Who coordinates plans and permits?

Our team coordinates needed plans and permit steps with the City of Thousand Oaks, CA and Ventura County agencies where required. The city asks you to talk with a planner first to learn which applications your lot needs. Planning applications go in as PDF files through the city's TO/24 portal, and every fee is paid before the building permit is issued. The reviewing authority controls approval.

How are budget and selections aligned?

Eli prices each layer of the house, from foundation and framing to systems and site work, while Donna develops the plan with you. You make the key choices before related work begins, so a late selection does not stall the crew or reopen the budget.

What can affect a custom-home schedule?

Beyond the size and scope of the house itself, your timeline depends on how many city reviews your lot needs and when you make your selections. A lot with oaks, a slope or major grading goes through more planning steps before the Building Division reviews the plans. New housing goes through more review layers than a remodel, so we build the schedule around them.

What happens after the walkthrough?

We review closeout details, final care, and any agreed remaining items with you. The permit information for your new home stays on public record in the city's TO/24 portal, where you or a future buyer can look it up if you ever sell.

Free Consultation

Start With a Clear Plan for Your Thousand Oaks Custom Home

Share the property, goals, scope, timing needs, and budget range. We will discuss fit and a useful next step.

Learn moreLearn more