310-388-3397
Get free consultation
Kitchen with white cabinets, a gray tile backsplash and a peninsula in our Santa Monica remodel
U-shaped white kitchen with a gas range, gray tile backsplash and light oak floors
Kitchen island with a cooktop and black stools, plus a tall stainless refrigerator
Stainless refrigerator at the end of the kitchen with the dining area visible beyond
Close-up of the sink under a black-framed window with gray elongated hex backsplash tile
Wall of white shaker cabinets with a stainless refrigerator and dishwasher under a long window
Dining table and kitchen island seen from the open living area, with a wine fridge behind
Double-sink vanity with white drawers, marble top and brushed nickel pulls
Long white vanity with a marble top, with a view into the bedroom through the doorway
Close-up of the two-sink vanity with black pulls and framed mirrors above
Bathroom with a black-framed mirror, a dark vanity and a tub shower with white stone tile
Powder room with a white vanity, a toilet and a black-framed window
Laundry area with black washer and dryer and white cabinets, leading to a hallway
Side-by-side washer and dryer with white cabinets above, next to a hallway
Primary bedroom with exposed wood beams, a ceiling fan and a dark wood bed
Bedroom with high clerestory windows, dark beams and a dresser along the wall
Bedroom dresser wall with a wall-mounted TV and a row of narrow high windows
Second bedroom with a ceiling fan, a black window and a desk setup beside the bed
Dining table with a red tablecloth and the kitchen island and bar shelving behind it
Dining area looking toward the kitchen, with a sink window and pendant lights
Dining table and open living room with a fireplace, seen from the far end
Open dining and living space with a sliding glass door and built-in shelves
Living room with a corner fireplace, a sectional sofa and a sliding glass door
Living room with a brick fireplace, white plank wall and built-in cabinets with a TV above
Built-in bar with glass shelves, white cabinets and a wine fridge
Wide view of the living room sectional, with the dining area and kitchen behind it
Living room with a corner fireplace, a white plank accent wall and a sliding door to the yard
Living room seen from the kitchen end, with the sectional and the dining table in the distance
Dining table in front of the living room, with a built-in bar counter on the right
Open layout with the dining table, the kitchen island and the living area in one room
Built-in bar nook with glass shelves and a wine fridge between two doors

Complete Home Remodel in 16th St.

ScopeBathroom Remodel, Complete Home Remodel, Kitchen Remodel
LocationSanta Monica

That took a lot of stress off our shoulders. We didn’t have to sort through endless samples.

Jeff & Joleen

Features

    Jeff and Joleen in their completed 16th Street home remodel kitchen in Santa Monica.Watch Video
    Transcript

    We were referred to Quality First Builders by an acquaintance, and thank goodness we were. We had trouble with a previous contractor and designer, so we started asking friends for recommendations. That’s how we were fortunate enough to find Eli and Donna. We ended up doing a full house remodel. We remodeled three bedrooms, three bathrooms, the kitchen, dining area, fireplace, entertainment center, and bar area. We also installed new flooring throughout the house and replaced all the windows. Eli’s team was fantastic. The crew was at the house every day, and they cleaned up the entire site at the end of each workday. That was really important to us. We could see steady progress throughout the project, which gave us peace of mind. Now we have a beautiful new home. It’s everything we hoped for and more. I definitely have favorite rooms now. Eli knows how much I love my upstairs bathroom, it’s absolutely gorgeous. The kitchen is one of my favorite spaces too. It’s functional, stylish, and beautifully finished. The overall workmanship is impeccable. The quality of everything they did is truly top-notch, and we are completely satisfied. One of the things that really made a difference for us was having Donna help with our design choices. She provided recommendations for everything from cabinet pulls to door handles, including things we never would have thought to consider. That took a lot of stress off our shoulders. We didn’t have to sort through endless samples. Donna guided us in a direction that matched our style and made sure everything throughout the house worked well together. We are very grateful for everything Donna and Eli contributed to the project. Their attention to detail, professionalism, and care made this a great experience. We’re extremely happy with the final result. Thank you to Eli, Donna, and the entire team at Quality First Builders.