310-388-3397
Get free consultation
White kitchen with a long island and built-in refrigerator in our Culver City custom home
Kitchen with a dark island with a white top, a steel hood and gray plank flooring
Kitchen island with legs on one side and a steel refrigerator at the right
Long white quartz counter with under-cabinet lighting, and the island and hood in the distance
Range with red knobs and a sink under a window, beside a dark drawer microwave
Close-up of the gas range with a steel hood and marble-look backsplash under two windows
Island with a built-in microwave drawer, facing the sink wall and the farmhouse sink
Kitchen with a marble-top island, built-in refrigerator and glass-front cabinets in Culver City
Island with a white top and the range wall behind it, with glass-front upper cabinets
Kitchen end wall with a stainless refrigerator, a farmhouse sink and a dishwasher
View down the kitchen to the refrigerator and a doorway to the side hall
Primary bath with a double vanity, a glass shower and the edge of a freestanding tub
Freestanding tub beside a glass shower, with a window overlooking the backyard
Freestanding tub in front of a window, with a door to the next room
Long double vanity with a wide mirror, a marble top and a glass shower at the end
Double vanity with brushed nickel faucets, a wide mirror and a door to the hall
Walk-in shower with marble-look walls, a glass door and a pebble floor
Close-up of the shower valve and handheld shower on marble-look wall tile
Powder room with a white vanity, a toilet and an octagon mirror
Powder room vanity with black pulls and an octagon mirror, next to a glass shower door
Powder room with a mirrored vanity, a round mirror and metallic textured wallpaper
Bathroom with a tub and light green glass tile walls, and a vanity on the right
Tub alcove with green glass subway tile, a window and a built-in niche
Tub and shower with green glass tile, a niche, a window and a toilet at the right
Bathroom with a gray vanity, a round mirror and a tub shower behind it
Narrow bathroom with a white vanity, a wide mirror and a window above the toilet
Double vanity with a white quartz top and a glass shower with a bench
Staircase with a curled black iron railing and a door at the top landing
Empty bedroom with gray plank floors, two windows and a sliding door
Built-in closet shelving with hanging rods and a set of drawers
Empty carpeted bedroom with two windows and recessed lights
Carpeted bedroom with a gray accent wall and a row of windows
Walk-in closet with white shelves, drawers and hanging rods over carpet
Upstairs landing with a wrought iron railing around the stair opening
Looking down the carpeted stairs through the wrought iron railing, with a skylight above
Narrow elevator shaft with stucco walls and a small door opening
Foundation trenches dug into the bare lot, before any framing
Concrete forms set in the lot for the new foundation, with an old shed beside it
Plywood floor deck over the finished foundation wall, ready for framing
Second-floor framing seen over a green construction fence and a coming soon sign
Wood framing at the front of the house with a garage opening and lumber piled below
Underside of the framed second floor, supported by a steel beam and post
Framed and sheathed house behind the construction fence, with a coming soon sign
Plywood-sheathed front of the house with window openings and a dumpster beside it
Bentley Ave., Culver City, Custom Home Construction Photo 49
Open two-car garage with a ceiling fan, new concrete and white siding
Finished two-story house with white siding, a gray garage door and a new concrete driveway
Finished house from the corner, with the garage door, a front porch and bare dirt in the yard
Street view of the neighboring older houses and the lot, with a palm tree in the background

Custom Home Construction in Bentley Ave.

ScopeBathroom Remodel, Complete Home Remodel, Kitchen Remodel, New Construction, Room Addition
LocationCulver City

Permitting in Culver City is not easy. There were delays and hurdles. But Eli pushed through all of it.

Ben & Leslie

Features

    Leslie sharing her experience in the completed Bentley Avenue custom home in Culver CityWatch Video
    Transcript

    We did a full renovation of our home in Culver City, almost a complete demolition. This is the house I grew up in, and over time we realized we needed something more. We also wanted to build something in the back for my parents to live in someday. Previously, a tenant had caused a fire that damaged the back of the house. So we decided to rebuild that space with the future in mind. I wanted someone who would treat this project with the same care and emotion that I felt. This wasn’t just construction. It was about building a life here, raising a family, and creating space for multiple generations to stay connected. After a lot of research, we found Eli and Donna. Right away, it felt like they truly cared. Hiring them felt more like forming a friendship. That’s probably the best way I can describe Eli and Donna. When someone becomes your friend during a renovation, it’s because they show up, every time. And they always did. This was a long, complex project. Permitting in Culver City is not easy. There were delays and hurdles. But Eli pushed through all of it. He kept the process moving, stayed committed to the timeline, and took care of every detail. The crew they brought in was also fantastic. Even now that we’ve moved in, neighbors tell us how respectful the crew was. They always cleaned up, kept the site safe, and even looked out for kids in the area. That level of respect meant a lot to us. What stands out most for me is working with Donna. She has such a great eye for design, but even more than that, she has real compassion. Donna helped us make smart decisions. She would say, “This is worth investing in,” or “You don’t need to spend money on that.” She created beautiful vision boards for us that made everything easier. We truly could not have completed this project without her. Donna brought the design to life, and Eli made sure it all happened. We’re so grateful for both of them. If we had to do this project all over again, we would absolutely hire them again without hesitation.