310-388-3397
Get free consultation
Gray ADU kitchen with open wood shelves and glass pendants in our Culver City ADU
Small ADU kitchen with gray flat-panel cabinets, floating shelves and a white peninsula
ADU kitchen with a cooktop, gray cabinets, open wood shelves and pendant lights
Vaulted ceiling with a skylight over the ADU living space and a kitchen counter edge
ADU bathroom with teal tile shower, wood vanity, round mirror and black hardware
Stacked washer and dryer by the bathroom vanity with the kitchen visible through the door
ADU living area with a wall-mounted heat pump, pendant lights and light oak floors
Wardrobe and kitchen island in the open ADU with a black glass door and skylight
Empty ADU room with a vaulted ceiling, small black window and a mini split unit
Aerial view of the backyard ADU with a dark roof behind the main house
Braddock Dr, Culver City, ADU Remodel Photo 1
Back of the white ADU with a black door and a concrete pad on a sunny day
Side of the ADU seen from the lawn, with planting along a white stucco wall
Front of the ADU with a black framed window and door facing the concrete pad

ADU Construction in Braddock Dr.

ScopeADU
LocationCulver City

Bonnie Poon & Rick Sasson

A conversion project planned around usable square footage, clean finishes, and practical coordination.

Features

    Completed ADU kitchen in Culver City for Bonnie Poon and Rick Sasson.Watch Video
    Transcript