310-388-3397
Get free consultation
Bathroom with a dark vanity, black-framed mirror and glass shower in our Woodland Hills remodel
Bathroom with a dark wood vanity and a sliding frosted glass door beside a black shower
Walk-in shower with dark tile, a black rain head and a sliding glass door
Vanity corner with frosted glass sliding doors that open to the bedroom
Bedroom with light wood floors, recessed lighting and a large window in our Woodland Hills remodel
Bedroom with a wood platform bed, purple bedding and a large framed wall art piece
Bedroom with a purple comforter, tall plant and a view into the bathroom
Living area with a small bistro table, gray chairs and a magenta accent wall
Bistro table and TV console in the living room, with frosted sliding doors on the left
Living room with a magenta accent wall, electric fireplace and a TV on a low stand
Sofa, coffee table and a TV beside an electric fireplace on the magenta wall
Marble coffee table and fireplace in the foreground with the dining nook behind

Complete Home Remodel in Burbank Blvd.

ScopeBathroom Remodel, Complete Home Remodel, Kitchen Remodel
LocationWoodland Hills

When I asked Eli how long the project would take, he estimated three to four weeks. In the end, it was completed in four weeks and four days.

Mark Sadoff

Features

    Mark sitting on a sofa in his remodeled living roomWatch Video
    Transcript

    I've had my condo for about 13 years, and recently I decided it was time to remodel everything. I received quotes from four different contractors, and in the end, I chose Eli and Donna from Quality First Builders. One of the key reasons I chose them was that they are a family-owned business. That gave the process a more personal and trustworthy feel. Their quote also came in below the other three, which made the decision even easier. Another major advantage was that Donna handles the design side of things. That meant I didn’t have to coordinate separately with a designer, which made the experience much smoother. Having both construction and design handled by the same team kept everything organized and efficient. Remodeling a condo can be incredibly stressful, but Eli and Donna made it feel easy. Donna helped me choose the flooring, tile, and paint. I already had a general sense of the color scheme I wanted, and she built beautifully on that vision. When I asked Eli how long the project would take, he estimated three to four weeks. In the end, it was completed in four weeks and four days. That kind of accuracy is rare and very appreciated, especially since I’ve heard so many horror stories about delays in renovation projects. The only part of the home we didn’t touch was the kitchen. If I decide to remodel it in the future, I would not hesitate to hire Eli and Donna again. They did an amazing job, far beyond my expectations. The results are beautiful, and they were supportive, helpful, and communicative through every step of the process.