310-388-3397
Get free consultation
Built-in window bench with blue cushions and a pedestal table beside gray shaker cabinets
Narrow galley kitchen with gray cabinets, white counters and a farmhouse sink
Close-up of the gray drawer base cabinets with brass pulls and a farmhouse sink
Gas range with a stainless hood, a knife block and a stainless refrigerator
Looking down the galley kitchen toward the back door with tile floors
Bathroom with a patterned tile shower wall, wood look tile and blue towels
Small vanity with a wood tile backsplash, a window and a white toilet
Walk-in shower with wood look tile, a niche and a hexagon patterned accent wall
Soaking tub with a gray curtain beside patterned tile and a window
Two vessel sinks on a floating vanity with a wood tile backsplash
Primary bath with a double vanity, a patterned tile shower and a marble top
Soaking tub set behind a glass wall with pendant lights above
Patterned hexagon tile shower wall with a built-in shelf unit below the glass
Primary bath with a white door, glass shower panel and a tub deck with shelves
Double vanity with two framed mirrors, marble top and a patterned tile wall
Gray glossy tile shower with a niche next to a marble tub deck and a faucet
Close-up of a tiled shower niche with hexagon tile holding two soap bottles
Child's bedroom with a bed, toy shelves, a play mat and a ceiling fan
Kid's bedroom with a bunk bed, ceiling fan and an easel
Living room with a gray sectional, oval coffee table and a wall mounted TV
Living room with a sofa, area rug and TV console seen from the corner
Bedroom with a white upholstered bed, wood nightstands and a window with sheer curtains
Primary bedroom with a gray upholstered bed, a bench and blue chair by the window

Complete Home Remodel in Coliseum St.

ScopeBathroom Remodel, Complete Home Remodel, Kitchen Remodel
LocationLos Angeles

From the start, he provided a clear, broken-down budget by room and category. He stuck to that budget completely.

Jason & Bradley

Features

    Jason and Bradley in their remodeled home on Coliseum Street in Los AngelesWatch Video
    Transcript

    Hi, my name is Jason Bradley. We purchased this house in February of 2017, and it was a complete redo. Everything had to be redone from top to bottom. We started looking for a contractor and went on Yelp to search for five-star reviews. That’s where we found Eli and Donna from Quality First Builders. They were incredibly professional, had great ideas for our home, and we immediately felt a connection with them. We hired them without hesitation. The project lasted four months and involved total demolition and rebuilding. They handled everything. That included new electrical, a kitchen remodel, two bathrooms, refinished floors, and the installation of a new air conditioning and heating system. Inside and out, they did it all. The result speaks for itself. They did an amazingly beautiful job. One of the best parts of working with Eli was having Donna on the team. She sourced all our fixtures, finishes, and materials. Not only did we get everything we wanted, but she also found great deals and helped keep the project on schedule. Eli was fantastic to work with as well. From the start, he provided a clear, broken-down budget by room and category. He stuck to that budget completely. He even finished a little earlier than expected, which was incredible. We had heard so many horror stories about contractors. That was not our experience. There were no issues at all. It was a smooth, professional, and positive process from beginning to end. Eli and his team at Quality First Builders were amazing. From Nerissa in the front office to all the subcontractors and the on-site crew, we couldn’t be happier. We’re incredibly thankful to Donna and Eli for making this such a great experience.