310-388-3397
Get free consultation
Long white galley kitchen with floating wood shelves and black-framed windows in Los Angeles
Kitchen with floating shelves, a center island and light green cabinets
Kitchen with a farmhouse sink, a pot filler over the range and black windows
Kitchen with a long island, gas range and stairs seen in the background
Tall paneled refrigerator and an island with a built-in microwave
Open great room with the kitchen island and sliding glass doors to the yard
Built-in bar with two beverage fridges and lighted floating shelves
Bathroom with a long wood vanity, black pulls and arched mirrors
Shower with vertical tile, a rain head, a bench and a glass door
Floating slatted wood vanity with gold faucets beside a glass shower
Green double vanity with gold hardware next to a tub with a sliding glass door
Bedroom suite with a built-in desk nook and light oak floors in our Los Angeles home addition
Floating wood vanity with a stone top and a gold faucet
Small powder room with a floating wood vanity and a curved mirror with two sconces
Staircase with a black metal railing beside the open living area
Entry with a wood front door and stairs with oak treads and a metal rail
Living room fireplace with built-in shelves and French doors to the yard
View from the fireplace across the living room toward the kitchen and stairs
Built-in bar with two beverage fridges and a chandelier over the stairs
Fireplace and the staircase with a wine fridge at the right edge
Open living room with light oak floors and black-framed sliding doors to the backyard in Los Angeles
Wide view from the living room across to the kitchen and the front door
Open living room with the kitchen islands in the background and sun on the floor
Upstairs landing with a stair railing, a cabinet and a framed window
Upstairs hall with tall cabinets and a small built-in counter by the stair
Bedroom with a ceiling fan, a window and a walk-in closet entry
Bedroom doorways leading to the closet and the bathroom
Empty upstairs bedroom with a ceiling fan and an open door
Walk-in closet with shelving, drawers and hanging rods
Bedroom with a glass door that opens to a small balcony
Bedroom with built-in closets and a balcony door at the end
Row of white closet doors in a bedroom with a view of the bath entry
Bedroom corner with two windows and blue sky outside
Bedroom with a window above a closet and an open door
Bedroom with sliding closet doors and a door to the hall
Bedroom with a large window and a high clerestory window
Bedroom with a high window, closet doors and a doorway to another room
Bright empty room with light oak floors and white sliding closet doors in our Los Angeles remodel
Upstairs hallway with white doors, oak floors and a closed door at the far end
Complete Home Remodel and Room Addition in Greenwood Ave, Los Angeles Photo 1
Back patio with concrete steps, a wood door and a small seating area
Gray deck beside tall black sliding glass doors with a railing
Back deck of a home addition with sliding glass doors and wall lanterns in Los Angeles
Rear of a two-story home addition with black windows, a sliding door and a gray deck in Los Angeles
Two-story home addition with white stucco, sliding glass doors and a back deck in Los Angeles
Narrow side yard with a paver walkway between a gray fence and the stucco wall
Side yard of a remodeled home with a paver path and a new wood fence in Los Angeles

Complete Home Remodel & Room Addition in Greenwood Ave.

ScopeComplete Home Remodel, Room Addition
LocationLos Angeles

Monica Lambert & Theo Fedoruk

Features

    Completed kitchen remodel and room addition on Greenwood Ave in Los AngelesWatch Video
    Transcript