310-388-3397
Get free consultation
Narrow white kitchen with a French-door refrigerator, runner rug and glass pendant in Los Angeles
Kitchen peninsula with a quartz counter and flowers, white cabinets beyond
Galley kitchen with white shaker cabinets and a stainless refrigerator
Kitchen run with pendant light, white cabinets and a runner on hardwood floors
Gas range, stainless hood and blue tile backsplash with a black faucet nearby
Sink wall with a black faucet, light subway tile and a stainless dishwasher
Range with red knobs under a hood, blue hex tile wall and a white door
Straight-on view of the range, steel hood and teal tile backsplash
Range wall seen from the dining area, with open pendant lights beyond
Close-up of teal elongated hex tile behind a six-burner range
Farmhouse sink with a black pull-down faucet and a quartz countertop
Close-up of red range knobs and the oven handle with a patterned towel
Long view down the galley kitchen to a white door with a rug on the floor
Quartz counter edge looking into the dining and living area with pendant lights
Dining table with green chairs, pendant lights and the kitchen in the background

Kitchen Remodel in David Ave.

ScopeKitchen Remodel
LocationLos Angeles

Donna guided us through decisions we were stuck on, like tile and paint selections, and made everything easier.

Stanley & Robin

Features

    Stanley and Robin smiling in their remodeled kitchen on David Ave in Los AngelesWatch Video
    Transcript

    We first hired Eli and Donna when we were thinking about converting our garage into an ADU. We wanted more space, eventually for my mom to move in when she’s no longer able to live independently. It also works well as a guest house and for outdoor entertaining. We even added a second floor to use as my office and man cave, and we really enjoy the space. Eli and his team were very efficient. They completed the project in about four months, from demolition to final touches. Donna has a great eye for interior design. She helped us choose materials like tiles, cabinets, appliances, and paint colors, and made everything feel cohesive. Later on, we decided to do some work on the main house, so we gave them another call. We were looking for something more modern and functional, and they delivered. We added new cabinetry, upgraded appliances, and redesigned the kitchen layout to be more efficient for cooking, entertaining, and daily use. It turned out great. Eli was fantastic at coordinating everything and scheduling the crews. If any issues came up, he always helped us find a solution. Donna guided us through decisions we were stuck on, like tile and paint selections, and made everything easier. We also added small details like a pocket door and a sliding glass window, and those worked out really well. Giovanni and the crew were amazing. Our neighbors even complimented how clean and quiet the site was, how the crew always arrived and left on time, and how smoothly things ran. It felt like a well-oiled machine. Overall, we’re really happy with our new kitchen and the whole process. Thank you Eli and Donna. We would absolutely recommend you to any of our friends looking for a contractor.