310-388-3397
Get free consultation
Bright kitchen with stainless wall ovens, white shaker cabinets and wide plank wood floors
White shaker cabinets and a range top under a chimney hood with marble backsplash
Kitchen corner with a marble backsplash, stainless range top and dishwasher
White L-shaped kitchen with double wall ovens and a marble backsplash
Range top with a white hood, marble backsplash and a stainless dishwasher
White kitchen with a peninsula, wood counter stools and walnut floors
Dining room open to a white kitchen with walnut floors in our Brentwood first floor remodel
Dining table with wood chairs in an open plan leading to the kitchen and living room
Kitchen with a stainless refrigerator, white cabinets and walnut plank floors
Sink wall with a garden window, stainless dishwasher and tall pantry cabinets
View from the hallway into the kitchen and dining area over walnut floors
Tall white pantry cabinets and a garden window in the remodeled kitchen
Stacked stainless wall ovens beside white shaker cabinets and marble backsplash
Living room with walnut floors, a white painted fireplace and a dark velvet sofa
Built-in white cabinet with floating wood shelves beside wood French doors
Floating shelves and a built-in cabinet with a view down the hall to the kitchen
Long living room with a white brick fireplace, area rug and walnut floors
Family room with a gray sectional, walnut floors and built-in bookshelves
White painted brick fireplace with a mounted TV in the family room
Family room with a gray sectional facing a white brick fireplace
Gray sectional sofa and coffee table in a bright family room with walnut floors
Den with a sliding glass door, gray sectional and floor-to-ceiling bookcase
Powder room with a white shaker vanity, round mirror and brass faucet

First Floor Remodel in Brentwood

ScopeKitchen Remodel
LocationLos Angeles

Lisa & Andrew Wolfberg

Quality First Builders completed a full first floor remodel for a client in Brentwood, CA — transforming the heart of the home with a brand new kitchen, fresh walnut flooring throughout, and a fully redesigned living room bar built for entertaining. The first floor no longer reflected how the family actually lived. The kitchen felt outdated and disconnected from the rest of the space, the original flooring didn't match the home's updated style, and the living room lacked a dedicated space for hosting and entertaining guests. Our team approached this as a complete first floor transformation rather than a series of separate updates — ensuring every element flowed together as one cohesive design. • Full Kitchen Remodel: New cabinetry, updated layout, and finishes designed for both everyday function and entertaining • New Flooring: Installed throughout the first floor for a warm, elevated, cohesive look • Fully redesigned to create a dedicated entertaining space that ties the whole floor together THE RESULT A first floor that finally works as one connected, elevated space — functional for daily life and built for hosting. From design through final walkthrough, Quality First Builders managed every detail of this remodel from start to finish.

Features

    White L-shaped kitchen with double wall ovens and a marble backsplashWatch Video
    Transcript