Joseph
Features
[{"feature":"Second-story addition constructed above the garage","text":"Second-story addition constructed above the garage","sort_order":0},{"feature":"Dedicated teen and family recreation loft","text":"Dedicated teen and family recreation loft","sort_order":1},{"feature":"Exterior and roofline matched to the original home","text":"Exterior and roofline matched to the original home","sort_order":2},{"feature":"Full roof replacement across the existing home and addition","text":"Full roof replacement across the existing home and addition","sort_order":3},{"feature":"Coordinated flooring and interior finish selections","text":"Coordinated flooring and interior finish selections","sort_order":4}]
Watch VideoTranscript
Hi, I'm Joseph McNabb, telling you about the renovation project that Eli and Donna did for us. This is the second time they worked for us. They did a nice job. We had them add the room that we're standing in right now to our existing house. They did a nice job with permits and overseeing all of the construction. They made some suggestions. For instance, we replaced the roof on the entire house, not just the renovated portion. Donna helped us with decorating, as always, including the floor that we're standing on right now, and it looks great. My wife and kids are very happy with the additional space and it looks terrific. So once again, thanks Eli.









