310-388-3397
Get free consultation
Galley kitchen with navy cabinets, a black range hood and a gas range in our Pasadena kitchen remodel
Navy kitchen with a farmhouse window over the sink, a gas range and a dishwasher
Gas range with a copper pull and an orange towel between navy cabinets and a white tile backsplash
White sink under a window with a garden shelf, a black faucet and a stand mixer
Dining table with a wood top and open shelves above a wine fridge on the kitchen's far wall
Close-up of the gas cooktop, white handmade tile and navy cabinets with a knife block
Window-side sink with a hanging herb shelf, white quartz counter and navy base cabinets
Dining table in the foreground with the kitchen, open shelves and a wine fridge behind it
Dining area with a pendant light and black metal chairs, with open shelves and a coffee station
Long run of navy upper cabinets with white tile backsplash and a quartz counter by the entry
Navy base cabinets with a built-in microwave drawer and long brass pulls
View down the kitchen past the range and tall navy drawers to the dining area
Black faucet and white sink at the window, with the pendant-lit dining table in the distance
Living room with a sectional sofa, a blue armchair, built-in shelves and a piano
Living room built-in shelves around a wall TV and electric fireplace, with a sectional nearby
Built-in dark wood bookcase with an electric fireplace and an ottoman in front of the sofa
Close view of the shelf wall with a TV above the fireplace and a woven tray on the ottoman
Side view of the tall built-in shelf with a blue chair and the sofa and wine shelves beyond

Kitchen Remodel in Vista Ave.

ScopeKitchen Remodel
LocationPasadena