“They did a nice job with permits and overseeing all of the construction.”

200+
Happy customers across Los Angeles

Family-Owned
And operated with owners on every job

10+
Years improving Los Angeles homes

Fully In-House
Permits to finishes handled by one team
Planning an Addition
More Room That Looks Like It Was Always There
A room addition in Beverly Hills goes through the city's own Building and Safety Division, not the City of Los Angeles. Your lot's zone sets your floor area and height limits, so we check it before we draw anything. The hard part is tying new space into old structure, legally. One in-house team carries it, including:
- A feasibility review that confirms your zone and shows whether your lot lets you build out, build up or reuse space you already have
- Plans that tie new space into the original character
- City permits handled, plus design review when the addition is visible from the street, with updates at every milestone
- A defined scope, budget, and schedule before crews start
- Finish work that makes the seam between old and new disappear
You gain the room your family needs. We make it feel original to the house.
Plan My Addition
Addition Types We Build
Choose the Space Your Home Is Missing
Every addition is designed to fit your lot, your budget, and the home you already love.
Learn moreLearn more
Bedroom Additions
Private, peaceful space that feels built with the house.

Second-Story Additions
Build up with a second story when your lot will not let you build out.

Kitchen and Dining Extensions
A bigger kitchen and dining area with more room to cook, gather, and move.

Bathroom Additions
An en-suite or guest bath where your layout allows.

In-Law Suites
Independent space for parents, guests, or future income.

Office and Flex Rooms
A quiet room that earns its place in the floor plan.
Why Choose Us
Discover Why 70%+ of Our Work Comes from Word of Mouth
One owner-led path connects scope, design, permits, construction, and final details.
Learn moreLearn morePermits, Plans, and City Coordination
Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.
- We review permit needs early.
- We coordinate plans and documentation with the remodel scope.
- We treat inspections as part of the process, not an afterthought.
- We connect design decisions to build requirements through one accountable team.
Scope Clarity Before Construction
Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.
- We discuss the scope before work begins.
- We clarify material priorities early.
- We surface potential cost drivers during planning.
- We explain changes before moving forward.
A Schedule Based On Real Work
We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.
- We connect milestones to actual work phases.
- We coordinate trades through one accountable team.
- We communicate delays and decisions clearly.
- We include the final walkthrough in the schedule.
Communication Without Chasing
You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.
- We provide regular updates during active work.
- We clarify the decisions you need to make next.
- We keep design and construction connected through one team.
- Our owners stay involved through key project moments.
Addition Projects
Homes Their Owners Are Proud to Show
See what the Quality First commitment looks like in practice, from single room additions to full second stories.
See All ProjectsSee All ProjectsOur Story
Eli Leads the Build. Donna Guides the Design.
You work with an owner-led team that carries your plan from early choices through final details.
Learn moreLearn more
What That Means for Your Addition
- One in-house path from plans and permits through final details.
- Construction accountability led by Eli.
- Design guidance connected to field needs.
- One project record for scope and decisions.
- Clear updates during active work.
- Changes reviewed before related work continues.
- A quality review and final walkthrough.
Our Process
A Clear Path From First Idea to Final Walkthrough
One process links goals, design, permits, choices, construction, updates, and closeout.
Learn moreLearn moreScope Review and Consultation
First we find the room: out, up, or within the roofline. Then we check your lot on the city zoning map: Central Area, Hillside Area or Trousdale Estates. You learn how much your lot allows before design starts.
Design, Scope, and Budget Planning
Donna designs the new space to read as original: rooflines, windows, flooring, and trim that match. Eli prices the foundation, framing, plumbing, and HVAC behind it.
Plans, Permits, and Schedule
We send structural drawings to the City of Beverly Hills for electronic plan review. A Central Area addition seen from the street also needs design review. City review sets the pace, and we schedule the build around approval.
Construction and Updates
Foundation, framing, roof tie-in, systems, and finishes follow a strict order, all on our own crews. Daily updates cover progress, and the existing house stays protected. In Trousdale Estates, we register the jobsite with a traffic plan first.
Final Walkthrough and Completion
We close by walking the new space with you and testing the transitions: flooring lines, wall planes, rooflines. Done right, guests cannot find where the house grew.
FAQ
Clear Answers Before You Commit
Learn about project fit, proof, design, permits, updates, changes, and living through construction.
Learn moreLearn moreWhat Beverly Hills addition projects are a fit?
Room additions, primary suites, expanded kitchens, and second-story projects fit best, whether your lot is in the Central Area, the Hillside Area or Trousdale Estates. Our minimum project is $30,000. Residential only; we do not take commercial work.
What addition project proof can I review?
Two of our Los Angeles additions are in the project slider above. On Duxbury Place in Palms, we pushed walls out into old garage space so Amy and Peter's kitchen, dining and living areas form one open space. On 7th Avenue in Los Angeles, we rebuilt Devin and Katie's nearly 100-year-old house after a fire. We added a powder room and designed a Jack and Jill bath. We also added a full second story on Greenwood Avenue in Mar Vista. Each project in our gallery shows the city, the scope and the finished result.
How do additions connect to the existing home?
We plan the tie-in first: how you walk from the old rooms into the new ones, and where the new foundation and roofline meet the old house. We also place windows so light still reaches the old rooms. In the Central Area, the street side is judged on how its architecture fits the scale and massing of the block, down to new windows. On Rozie Avenue in Woodland Hills, we matched the exterior and roofline and replaced the roof across the whole house.
Will an addition add value?
Added living space is one of the most direct ways to raise your home's value. In Beverly Hills, that space has to match the house around it. We design the addition to read as original from the street and to work every day inside. We do not quote appraisal numbers. Your investment pays off first in a room your family uses every day.
Can one team handle design, permits, and construction?
Yes. One licensed general contractor carries it all: Donna designs, Eli runs construction and the city permit file, and our own crews build. On a Beverly Hills addition, the same team answers plan check corrections and prepares the design review package, so you never pass messages between separate contractors.
How do you define the scope?
We start with your lot's zone, its floor area and setback limits, and whether the work needs design review. Each zone follows its own article of the zoning code, and Hillside Area lots also have limits on landform alteration and view preservation. Then we price what drives your budget: the foundation, framing, roof tie-in and how far the new plumbing and HVAC must reach. You get a written estimate that covers those items before construction.
How do permits affect timing?
City review sets most of the pace. Every addition goes through Building and Safety plan review. A street-facing addition in the Central Area adds design review. If a California licensed architect designs it in a pure architectural style, city staff can review it as Track 1. Otherwise it goes to the Design Review Commission as Track 2. Hillside Area lots have no design review. Some lots also need a site-specific fault investigation, checked by the city's consultant geologist, before a building permit is issued. We submit plans electronically, answer corrections fast and book inspections through the city's online portal.
What happens if hidden conditions appear?
We stop, show you the condition and price the fix before related work continues. Tying new structure to old always holds surprises; experience keeps them small. On 7th Avenue, the old foundation was damaged and had to be replaced. The owners say the job cost more than planned, for the right reasons, and that Eli was always honest about it.
Can we remain home during construction?
Usually, for most of the build. Additions start outside the existing house, and the tie-in weeks are the loud ones. We fence the work area and plan access and dust control first. On Marshall Street in Culver City, Nate and Rosie had their kids around through an addition and ADU, and they say the site stayed spotless and safe. In Trousdale Estates, we register the jobsite with a construction traffic management plan before work starts. The city requires 24 hours' notice for heavy trucks, which may haul only between 8:30 am and 3:15 pm.
What happens during the first consultation?
We look at your goals, your lot's zone and whether the addition will show from the street. You leave knowing your likely review path and next step, with a scope that fits your budget. If you want an early read from the city, we can request a concept review through its electronic plan review.
Free Consultation
Plan Your Beverly Hills Home Addition
Start with project fit and your goals. No construction commitment is made during the first conversation.
Learn moreLearn more









