310-388-3397
Get free consultation

The Better Way to Add Space in Calabasas

Get the space your family needs, designed, permitted, and built by one team, in months not years.

Build with the confidence of a design-build process refined over 10+ years to eliminate setback surprises, Calabasas permit delays, and additions that look tacked on.

  • No-Obligation
  • Transparent Roadmap
  • Clear Timeline & Budget
Two-story house with a second-story addition over the garage, set among trees in Woodland Hills
Modern white kitchen with a dark wood island and wall ovens in our South Pasadena remodel
Open ADU living area with a blue kitchen island and a black sofa in our Tarzana ADU
  • 200+

    Happy customers across Los Angeles

  • Family-Owned

    And operated with owners on every job

  • 10+

    Years improving Los Angeles homes

  • Fully In-House

    Permits to finishes handled by one team

Planning an Addition

More Room That Looks Like It Was Always There

Inside city limits, a room addition in Calabasas needs Planning Division zoning and site plan review, then Building and Safety plan review, the permit and inspections. Gated communities add HOA review. We prepare and track all of it, so you gain the room you need without leaving the home you love. One in-house team carries it, including:

  • A feasibility review that shows whether your lot lets you build out, build up or reuse space you already have
  • Plans that tie new space into the original character
  • Plans prepared for city review, plus HOA review where your community requires it, with updates at every milestone
  • A defined scope, budget, and schedule before crews start
  • Finish work that makes the seam between old and new disappear

You gain the room your family needs. We make it feel original to the house.

Plan My Addition
Home addition at Whitaker Avenue in Northridge

Addition Types We Build

Choose the Space Your Home Is Missing

Every addition is designed to fit your lot, your budget, and the home you already love.

Learn moreLearn more

Why Choose Us

Discover Why 70%+ of Our Work Comes from Word of Mouth

One owner-led path connects scope, design, permits, construction, and final details.

Learn moreLearn more

Permits, Plans, and City Coordination

Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.

  • We review permit needs early.
  • We coordinate plans and documentation with the remodel scope.
  • We treat inspections as part of the process, not an afterthought.
  • We connect design decisions to build requirements through one accountable team.
Get My Free Estimate

Scope Clarity Before Construction

Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.

  • We discuss the scope before work begins.
  • We clarify material priorities early.
  • We surface potential cost drivers during planning.
  • We explain changes before moving forward.
Get My Free Estimate

A Schedule Based On Real Work

We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.

  • We connect milestones to actual work phases.
  • We coordinate trades through one accountable team.
  • We communicate delays and decisions clearly.
  • We include the final walkthrough in the schedule.
Get My Free Estimate

Communication Without Chasing

You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.

  • We provide regular updates during active work.
  • We clarify the decisions you need to make next.
  • We keep design and construction connected through one team.
  • Our owners stay involved through key project moments.
Get My Free Estimate

Addition Projects

Homes Their Owners Are Proud to Show

See what the Quality First commitment looks like in practice, from single room additions to full second stories.

See All ProjectsSee All Projects
Room addition used as a family room with a sectional, TV and exercise bike in Woodland Hills

01

Room Addition in Woodland Hills

  • Second-story addition constructed above the garage
  • Dedicated teen and family recreation loft
  • Exterior and roofline matched to the original home
  • Full roof replacement across the existing home and addition
  • Coordinated flooring and interior finish selections
Get My Free EstimateMore details
White kitchen with a blue island, glass pendants and a black faucet in our Los Angeles kitchen remodel

02

Kitchen Remodel & Room Addition in Los Angeles

    Get My Free EstimateMore details
    Riverside Terrace bathroom addition in Silver Lake

    03

    Bathroom Addition in Silver Lake

      Get My Free EstimateMore details
      Open kitchen with exposed ceiling beams, linen pendant lights and a wood dining table at the island

      04

      New Construction & Room Addition in Los Angeles

      • Arched openings and warm Spanish-inspired cabinetry
      • Peninsula island with built-in bench seating
      • Custom Dutch door connecting to the side yard
      • Modern plastered kitchen hood and fireplace
      • Built-in seating nook, custom cabinetry, and paneled appliances
      Get My Free EstimateMore details

      Our Story

      Eli Leads the Build. Donna Guides the Design.

      You work with an owner-led team that carries your plan from early choices through final details.

      Learn moreLearn more
      More about us
      Eli and Donna of Quality First Builders in a completed Los Angeles kitchen

      What That Means for Your Addition

      • One in-house path from plans and permits through final details.
      • Construction accountability led by Eli.
      • Design guidance connected to field needs.
      • One project record for scope and decisions.
      • Clear updates during active work.
      • Changes reviewed before related work continues.
      • A quality review and final walkthrough.

      Our Process

      A Clear Path From First Idea to Final Walkthrough

      One process links goals, design, permits, choices, construction, updates, and closeout.

      Learn moreLearn more
      1. Scope Review and Consultation

        First we find the room: out, up, or within the roofline. Then we check your parcel against the city's fire zone, slope setback and geotechnical rules, which can change the foundation, materials and budget.

      2. Design, Scope, and Budget Planning

        Donna designs the new space to read as original: rooflines, windows, flooring, and trim that match. Eli prices the foundation, framing, plumbing, and HVAC behind it.

      3. Plans, Permits, and Schedule

        Structural drawings go to City of Calabasas plan check, with HOA review alongside in gated communities. City review sets the pace, so we answer comments fast, track the permit and schedule the build around approval.

      4. Construction and Updates

        Foundation, framing, roof tie-in, systems, and finishes follow a strict order, all on our own crews. Daily updates cover progress, and the existing house stays protected.

      5. Final Walkthrough and Completion

        We close with a final walkthrough that tests every transition: flooring lines, wall planes and rooflines. Done right, guests cannot find where the house grew.

      FAQ

      Clear Answers Before You Commit

      Learn about project fit, proof, design, permits, updates, changes, and living through construction.

      Learn moreLearn more
      What Calabasas addition projects are a fit?

      Residential additions with budgets of $30,000 and up. That covers a single bedroom addition, a primary suite with its own bathroom, a kitchen extension or a full second story. Every addition is planned around the home you already have. We do not take commercial work.

      What addition project proof can I review?

      Our closest finished additions are next door in Woodland Hills. On Rozie Avenue, Joseph's family hired us a second time to add a second story over their garage. We matched the exterior and roofline to the house and replaced the roof across the whole home. On Poe Avenue, we built three targeted additions to expand Jeff's living areas. Rozie Avenue is the first project in the gallery on this page.

      How do additions connect to the existing home?

      We plan how the new room ties into the structure and the systems first, then the light. The foundation, framing and roofline decide whether the new space reads as original architecture or as an add-on. On Flores De Oro in South Pasadena, Eli suggested lifting the roof. With the added windows and skylights, Melanie says the whole house became bright and airy.

      Will an addition add value?

      Square footage is one of the first numbers a buyer or appraiser looks at, and a room that looks original avoids the tacked-on look. We will not quote an appraisal figure, because that depends on your market when you sell. We do promise space your family uses every day and a seam between old and new that nobody can find.

      Can one team handle design, permits, and construction?

      Yes. We are a licensed California general contractor. Donna guides the design and finish choices, Eli runs construction and the permit file, and our own crews do the work. You never coordinate separate contractors or trades.

      How do you define the scope?

      We walk the property with you, check what size your setbacks and slope allow, and look at how the plumbing, electrical and heating will extend into the new room. We also check your parcel against the city's handouts for harder lots: Very High Fire Hazard Severity Zone construction notes, the slope setback rule and the geotechnical and seismic hazard zone guides. A rule that applies can change the foundation or the materials, so you hear about it before design starts. Then you get a written estimate that names the cost drivers before construction starts.

      How do permits affect timing?

      Much of the wait comes before construction. City of Calabasas plan checkers review your structural drawings against the building codes in effect, and the city offers that review electronically, with digital permit issuance. In gated communities the HOA reviews the plans too. A fire zone, a slope or soil conditions can add a geotechnical report or extra plan corrections, so we look for them before we submit. Once the permit is issued, the build follows a set order with city inspections at each stage.

      What happens if hidden conditions appear?

      We review the condition, needed response, and likely effects before related work begins. Tying new structure to old always holds surprises; experience keeps them small.

      Can we remain home during construction?

      Usually, for most of the build. Additions start outside the existing envelope; the tie-in weeks are the loud ones. We plan access and dust control first.

      What happens during the first consultation?

      We walk your home, talk through your goals and sketch which options your lot allows: out, up or within the roofline. You leave knowing which city rules apply and what drives the cost. The advice draws on additions we have built nearby in Woodland Hills and Northridge.

      Free Consultation

      Plan Your Calabasas Home Addition

      Start with project fit and your goals. No construction commitment is made during the first conversation.

      Learn moreLearn more