“They did a nice job with permits and overseeing all of the construction.”

200+
Happy customers across Los Angeles

Family-Owned
And operated with owners on every job

10+
Years improving Los Angeles homes

Fully In-House
Permits to finishes handled by one team
Planning an Addition
More Room That Looks Like It Was Always There
A bedroom, a suite, or a bigger kitchen, without leaving the home you love. The hard part is tying new space into old structure, legally. One in-house team carries it, including:
- A feasibility review of setbacks, structure, and where to grow
- Plans that tie new space into the original character
- Permits and city approvals handled, with updates at every milestone
- A defined scope, budget, and schedule before crews start
- Finish work that makes the seam between old and new disappear
You gain the room your family needs. We make it feel original to the house.
Plan My Addition
Addition Types We Build
Choose the Space Your Home Is Missing
Every addition is designed to fit your lot, your budget, and the home you already love.
Learn moreLearn more
Bedroom Additions
Private, peaceful space that feels built with the house.

Second-Story Additions
Build up when the lot will not let you build out.

Kitchen and Dining Extensions
More room to cook, gather, and move.

Bathroom Additions
An en-suite or guest bath where your layout allows.

In-Law Suites
Independent space for parents, guests, or future income.

Office and Flex Rooms
A quiet room that earns its place in the floor plan.
Why Choose Us
Discover Why 70%+ of Our Work Comes from Word of Mouth
One owner-led path connects scope, design, permits, construction, and final details.
Learn moreLearn morePermits, Plans, and City Coordination
Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.
- We review permit needs early.
- We coordinate plans and documentation with the remodel scope.
- We treat inspections as part of the process, not an afterthought.
- We connect design decisions to build requirements through one accountable team.
Scope Clarity Before Construction
Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.
- We discuss the scope before work begins.
- We clarify material priorities early.
- We surface potential cost drivers during planning.
- We explain changes before moving forward.
A Schedule Based On Real Work
We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.
- We connect milestones to actual work phases.
- We coordinate trades through one accountable team.
- We communicate delays and decisions clearly.
- We include the final walkthrough in the schedule.
Communication Without Chasing
You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.
- We provide regular updates during active work.
- We clarify the decisions you need to make next.
- We keep design and construction connected through one team.
- Our owners stay involved through key project moments.
Addition Projects
Homes Their Owners Are Proud to Show
See what the Quality First commitment looks like in practice, from single room additions to full second stories.
See All ProjectsSee All ProjectsOur Story
Eli Leads the Build. Donna Guides the Design.
You work with an owner-led team that carries your plan from early choices through final details.
Learn moreLearn more
What That Means for Your Addition
- One in-house path from plans and permits through final details.
- Construction accountability led by Eli.
- Design guidance connected to field needs.
- One project record for scope and decisions.
- Clear updates during active work.
- Changes reviewed before related work continues.
- A quality review and final walkthrough.
Our Process
A Clear Path From First Idea to Final Walkthrough
One process links goals, design, permits, choices, construction, updates, and closeout.
Learn moreLearn moreScope Review and Consultation
First we find the room: out, up, or within the roofline. Setbacks, structure, and access decide which options are real on your lot.
Design, Scope, and Budget Planning
Donna designs the new space to read as original: rooflines, windows, flooring, and trim that match. Eli prices the foundation, framing, plumbing, and HVAC behind it.
Plans, Permits, and Schedule
Structural drawings and permits with the City of Los Angeles come first. City review sets the pace, and we sequence the build around it.
Construction and Updates
Foundation, framing, roof tie-in, systems, and finishes follow a strict order, all on our own crews. Daily updates cover progress, and the existing house stays protected.
Final Walkthrough and Completion
We close by testing the transitions: flooring lines, wall planes, rooflines. Done right, guests cannot find where the house grew.
FAQ
Clear Answers Before You Commit
Learn about project fit, proof, design, permits, updates, changes, and living through construction.
Learn moreLearn moreWhat Sherman Oaks addition projects are a fit?
From one added bedroom to a primary suite or a second story, meaningful additions fit. The business stays residential.
What addition project proof can I review?
Review selected addition work across Los Angeles on this page and in our gallery. Our Whitaker Avenue remodel and room addition in Northridge shows the tie-in standard. Each one shows the city, the scope, and the finished result.
How do additions connect to the existing home?
Circulation, structure, systems, and light get planned first. The foundation, framing, and roofline determine whether the new space reads as original architecture or as an add-on.
Will an addition add value?
Added square footage usually matters to a home's value, but we do not promise appraisal outcomes. We focus on space your family will actually use; the investment case is yours to weigh.
Can one team handle design, permits, and construction?
Yes. One licensed general contractor carries design, permits, construction, and finishes. No separate contractors to coordinate.
How do you define the scope?
We review goals, property, plans, selections, systems, access, and setbacks, then set the cost drivers in a written estimate before construction.
How do permits affect timing?
Review with the City of Los Angeles, inspections, site conditions, and owner decisions can affect timing. Additions usually need plans and structural review; we coordinate each step.
What happens if hidden conditions appear?
We review the condition, needed response, and likely effects before related work begins. Tying new structure to old always holds surprises; experience keeps them small.
Can we remain home during construction?
Usually, for most of the build. Additions start outside the existing envelope; the tie-in weeks are the loud ones. We plan access and dust control first.
What happens during the first consultation?
We discuss project fit, your goals, the home, likely scope, and next steps. The advice draws on addition work across Studio City and Encino too.
Free Consultation
Plan Your Sherman Oaks Home Addition
Start with project fit and your goals. No construction commitment is made during the first conversation.
Learn moreLearn more









