“They did a nice job with permits and overseeing all of the construction.”

200+
Happy customers across Los Angeles

Family-Owned
And operated with owners on every job

10+
Years improving Los Angeles homes

Fully In-House
Permits to finishes handled by one team
Planning an Addition
More Room That Looks Like It Was Always There
Studio City is part of the City of Los Angeles, so LADBS permits your addition. The hard part is tying new space into old structure, legally. Zoning, hillside rules and the Mulholland plan shape what you can add, so we check your lot first. You gain the room without leaving the home you love. One in-house team carries it, including:
- A ZIMAS check of your lot's zoning and overlays, then a clear answer on building out or up
- Plans that tie new space into the original character
- City Planning clearance where your lot needs it and LADBS plan check, with updates at every milestone
- A defined scope, budget, and schedule before crews start
- Finish work that makes the seam between old and new disappear
You gain the room your family needs. We make it feel original to the house.
Plan My Addition
Addition Types We Build
Choose the Space Your Home Is Missing
Every addition is designed to fit your lot, your budget, and the home you already love.
Learn moreLearn more
Bedroom Additions
Private, peaceful space that feels built with the house.

Second-Story Additions
Build up and keep your yard when the lot will not let you build out.

Kitchen and Dining Extensions
A bigger kitchen with more room to cook, gather, and move.

Bathroom Additions
An en-suite or guest bath where your layout allows.

In-Law Suites
Independent space for parents, guests, or future income.

Office and Flex Rooms
A quiet room that earns its place in the floor plan.
Why Choose Us
Discover Why 70%+ of Our Work Comes from Word of Mouth
One owner-led path connects scope, design, permits, construction, and final details.
Learn moreLearn morePermits, Plans, and City Coordination
Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.
- We review permit needs early.
- We coordinate plans and documentation with the remodel scope.
- We treat inspections as part of the process, not an afterthought.
- We connect design decisions to build requirements through one accountable team.
Scope Clarity Before Construction
Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.
- We discuss the scope before work begins.
- We clarify material priorities early.
- We surface potential cost drivers during planning.
- We explain changes before moving forward.
A Schedule Based On Real Work
We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.
- We connect milestones to actual work phases.
- We coordinate trades through one accountable team.
- We communicate delays and decisions clearly.
- We include the final walkthrough in the schedule.
Communication Without Chasing
You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.
- We provide regular updates during active work.
- We clarify the decisions you need to make next.
- We keep design and construction connected through one team.
- Our owners stay involved through key project moments.
Addition Projects
Homes Their Owners Are Proud to Show
See what the Quality First commitment looks like in practice, from single room additions to full second stories.
See All ProjectsSee All ProjectsOur Story
Eli Leads the Build. Donna Guides the Design.
You work with an owner-led team that carries your plan from early choices through final details.
Learn moreLearn more
What That Means for Your Addition
- One in-house path from plans and permits through final details.
- Construction accountability led by Eli.
- Design guidance connected to field needs.
- One project record for scope and decisions.
- Clear updates during active work.
- Changes reviewed before related work continues.
- A quality review and final walkthrough.
Our Process
A Clear Path From First Idea to Final Walkthrough
One process links goals, design, permits, choices, construction, updates, and closeout.
Learn moreLearn moreScope Review and Consultation
We start with who needs a room and where the lot can give one. Then we pull your parcel in ZIMAS, the city's zoning map, and check hillside and Mulholland rules before any drawings start.
Design, Scope, and Budget Planning
The design ties new to old: matched rooflines, windows, and trim. Eli prices structure and systems early, so costs surface before commitments.
Plans, Permits, and Schedule
Every addition needs plans, structural review and an LADBS permit. Inside the Mulholland plan area, City Planning must clear it first. We carry the whole file through city review and schedule around the approval date.
Construction and Updates
The build runs foundation to finishes in strict order, with our own crews and daily updates. The seam between old and new gets the most attention.
Final Walkthrough and Completion
The walkthrough tests the seam: floor, wall, and roof where new meets old. The addition should feel like it was always part of the house.
FAQ
Clear Answers Before You Commit
Learn about project fit, proof, design, permits, updates, changes, and living through construction.
Learn moreLearn moreWhat Studio City addition projects are a fit?
Our project minimum is $30,000, and that is a floor, not the price of an addition. We plan bedroom additions, primary suites with their own bath, bigger kitchens and full second stories. On a tight Studio City lot, building up can add living space and keep the yard you already have. We do not take commercial work.
What addition project proof can I review?
You can review two finished additions inside the City of Los Angeles, both in the gallery on this page. On Rozie Avenue in Woodland Hills, we built a second story over the garage and matched the roofline. On 7th Avenue in Los Angeles, Devin and Katie's fire rebuild included a room addition. Both went through the same city permit system your Studio City addition will. Right here in Studio City, we also remodeled Mixtli and George's 1920s house on Landale Street. That job was a complete remodel, not an addition. The house carried add-ons from the 1970s and later that made the layout feel disjointed, and we pulled it back into one plan.
How do additions connect to the existing home?
We plan the tie-in first: where the new foundation and roofline meet the old house. That choice decides whether the room reads as original architecture or as an add-on. On our Landale Street remodel in Studio City, Mixtli and George wanted to keep their bungalow's California charm and add mid-century touches. We drew three layout options, and they picked what worked best from each.
Will an addition add value?
A permitted addition puts your new square footage on the record. It shows up in the building permit history that anyone can look up for your parcel in ZIMAS. We will not promise a number for your property value, because that depends on the market when you sell. We do promise a room your family will use every day.
Can one team handle design, permits, and construction?
Yes. We are a licensed California general contractor with design in-house. Donna guides the layout and finish choices, Eli leads construction, and our own crews build. You never juggle separate contractors.
How do you define the scope?
We walk the property with you and check what size your zoning and setbacks allow. We also look at how plumbing and electrical will reach the new room. Before crews start, you get a written estimate that spells out what drives the cost. On a Studio City hillside lot, that can include foundation work on the slope and harder site access.
How do permits affect timing?
The city's review drives much of the schedule. Every addition here goes through plan check at LADBS, the city's building department. Inside the Mulholland plan area, City Planning must clear it too, and LADBS checks for that clearance before it issues the permit. The city counts your new space together with earlier additions since 1992. At 900 square feet or less, it can qualify for an administrative clearance. Over 900 square feet, it goes to the Mulholland Design Review Board. Devin and Katie say the only delay on their 7th Avenue rebuild was getting plans approved by the city. That is why we submit complete plans and answer corrections fast.
What happens if hidden conditions appear?
We show you the condition and price the fix before related work continues. Where new framing meets old, surprises are normal. On 7th Avenue in Los Angeles, the old foundation was damaged and had to be replaced. Eli was upfront about it, and Devin and Katie say the extra spending was for the right reasons.
Can we remain home during construction?
Often yes, since much of the work starts outside the existing walls. It still depends on utilities, access, and the tie-in phase. We discuss the living plan before construction.
What happens during the first consultation?
We walk your home, talk through your goals and pull up your parcel in ZIMAS, the city's zoning map, together. It shows whether the Baseline Hillside Ordinance applies, which adds design rules on hillside lots, and whether your lot sits inside the Mulholland Scenic Parkway Specific Plan. You leave knowing which rules apply and what will drive the cost. The advice draws on our work next door too: a Sherman Oaks job that paired a complete remodel with ADU work, and a ground-up ADU in Valley Village.
Free Consultation
Plan Your Studio City Home Addition
Start with project fit and your goals. No construction commitment is made during the first conversation.
Learn moreLearn more









