Planning an Addition
More Room That Looks Like It Was Always There
A room addition in Tarzana is permitted by LADBS, the City of Los Angeles building department. Your zoning decides how much you can add, and lots in the Mulholland Scenic Parkway Specific Plan need City Planning review. We sort it out before design, so you grow without leaving the home you love. One in-house team carries the whole job, including:
- A parcel lookup in ZIMAS that shows your zoning, hillside status and any Mulholland overlay before you pay for drawings
- Plans that tie new space into the original character
- LADBS plan check, plus a City Planning clearance when the Mulholland plan covers your lot, with updates at every milestone
- A defined scope, budget, and schedule before crews start
- Finish work that makes the seam between old and new disappear
You gain the room your family needs. We make it feel original to the house.
Plan My Addition
Addition Types We Build
Choose the Space Your Home Is Missing
Every addition is designed to fit your lot, your budget, and the home you already love.
Learn moreLearn more
Bedroom Additions
Private, peaceful space that feels built with the house.

Second-Story Additions
Build up with a second story when the lot will not let you build out.

Kitchen and Dining Extensions
More room to cook, gather, and move through the kitchen and dining area.

Bathroom Additions
An en-suite or guest bath where your layout allows.

In-Law Suites
Independent space for parents, guests, or future income.

Office and Flex Rooms
A quiet room that earns its place in the floor plan.
Why Choose Us
Discover Why 70%+ of Our Work Comes from Word of Mouth
One owner-led path connects scope, design, permits, construction, and final details.
Learn moreLearn morePermits, Plans, and City Coordination
Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.
- We review permit needs early.
- We coordinate plans and documentation with the remodel scope.
- We treat inspections as part of the process, not an afterthought.
- We connect design decisions to build requirements through one accountable team.
Scope Clarity Before Construction
Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.
- We discuss the scope before work begins.
- We clarify material priorities early.
- We surface potential cost drivers during planning.
- We explain changes before moving forward.
A Schedule Based On Real Work
We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.
- We connect milestones to actual work phases.
- We coordinate trades through one accountable team.
- We communicate delays and decisions clearly.
- We include the final walkthrough in the schedule.
Communication Without Chasing
You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.
- We provide regular updates during active work.
- We clarify the decisions you need to make next.
- We keep design and construction connected through one team.
- Our owners stay involved through key project moments.
Addition Projects
Homes Their Owners Are Proud to Show
See what the Quality First commitment looks like in practice, from single room additions to full second stories.
See All ProjectsSee All ProjectsOur Story
Eli Leads the Build. Donna Guides the Design.
You work with an owner-led team that carries your plan from early choices through final details.
Learn moreLearn more
What That Means for Your Addition
- One in-house path from plans and permits through final details.
- Construction accountability led by Eli.
- Design guidance connected to field needs.
- One project record for scope and decisions.
- Clear updates during active work.
- Changes reviewed before related work continues.
- A quality review and final walkthrough.
Our Process
A Clear Path From First Idea to Final Walkthrough
One process links goals, design, permits, choices, construction, updates, and closeout.
Learn moreLearn moreScope Review and Consultation
First we find the room: out, up, or within the roofline. A ZIMAS parcel lookup then shows which hillside or Mulholland rules touch your Tarzana lot before you pay for plans.
Design, Scope, and Budget Planning
Donna designs the new space to read as original: rooflines, windows, flooring, and trim that match. Eli prices the foundation, framing, plumbing, and HVAC behind it.
Plans, Permits, and Schedule
Your structural drawings go to LADBS for plan check. Inside the Mulholland plan, we also file the City Planning case your permit depends on, then set the start date around approval.
Construction and Updates
Foundation, framing, roof tie-in, systems, and finishes follow a strict order, all on our own crews. Daily updates cover progress, and the existing house stays protected.
Final Walkthrough and Completion
We close by walking the finished addition with you and testing the transitions: flooring lines, wall planes, rooflines. Done right, guests cannot find where the house grew.
FAQ
Clear Answers Before You Commit
Learn about project fit, proof, design, permits, updates, changes, and living through construction.
Learn moreLearn moreWhat Tarzana addition projects are a fit?
Our minimum budget is $30,000, and we take residential work only. Above that line, we build a family room or bedroom at ground level, a primary suite with its own bath, a bigger kitchen or a full second story. When your lot has room to grow outward, we usually start there, and we build up when it does not.
What addition project proof can I review?
Start with Tarzana. On Erwin Street, we built a living room addition for a homeowner. Its project page in our gallery shows the exterior and interior. On the same street, Regina hired us to rescue her ADU remodel after three earlier contractors damaged it. For an addition close by, see Rozie Avenue in Woodland Hills, the first project on this page. There we added a second story over the garage and matched the roofline to the house.
How do additions connect to the existing home?
We plan the tie-in before anything else: where the new foundation, framing and roof meet the old house. That seam decides whether the room looks original or added on. On Rozie Avenue in Woodland Hills, we matched the exterior and roofline to the house and replaced the roof across the whole home, so old and new read as one.
Will an addition add value?
A permitted addition shows up in your property's building permit history, which anyone can look up in ZIMAS. A future buyer can see that the new square footage was built with permits and city inspections. We will not promise an appraisal figure, since the market sets that when you sell. We build living space planned around the way your family lives, and the investment case stays yours to weigh.
Can one team handle design, permits, and construction?
Yes. We are a California licensed general contractor with design in-house. Donna shapes the layout and finish choices, Eli runs construction and our own crews do the building. You have one team to call from the first sketch to the final inspection.
How do you define the scope?
We walk the house and the lot with you and check what your zoning and setbacks allow. We trace how plumbing and electrical will reach the new room. Then you get a written estimate that names each cost driver, from finish selections to foundation work, before crews start. Inside the Mulholland plan, protected trees or shrubs can be one of them. The city asks for a Tree Disclosure Statement, and removing a protected tree needs its own permit from the Board of Public Works.
How do permits affect timing?
City review sets much of the pace. Every addition goes through LADBS plan check. Inside the Mulholland plan, every addition also needs a City Planning case, and LADBS will not issue the permit without that clearance. The city counts your new floor area together with everything added there since 1992. Adding less than 900 square feet may qualify for an Administrative Clearance from planning staff. Adding more goes to the Mulholland Design Review Board, which meets twice a month in Van Nuys. Lots within 200 feet of parkland, 50 feet of a prominent ridge or 100 feet of an identified stream cannot use that staff review. We tell you which path applies before design starts and answer corrections quickly.
What happens if hidden conditions appear?
We show you the condition and what the fix involves before related work goes on. Regina's Erwin Street bathroom came to us with plumbing mistakes and floor levels left wrong by earlier work. Eli fixed the plumbing, made the proper level changes and then finished the room. Where new structure meets old, surprises happen. Experience and a quick, clear decision keep them small.
Can we remain home during construction?
Usually, for most of the build. Additions start outside the existing envelope; the tie-in weeks are the loud ones. We plan access and dust control first.
What happens during the first consultation?
We walk your home, hear what space you need and look up your parcel with you. Tarzana is part of the City of Los Angeles, so LADBS issues your permit, and the Mulholland plan reaches into part of the Encino-Tarzana community plan area. You leave knowing whether the Baseline Hillside Ordinance or the Mulholland plan applies, since either one adds building rules that shape the design. You also learn whether your lot favors building out or up. Our advice comes from additions we finished in Tarzana and Woodland Hills, plus a Northridge home remodel with an addition.