310-388-3397
Get free consultation

The Better Way to Add Space in Woodland Hills

Get the space your family needs, designed, permitted, and built by one team, in months not years.

Build with the confidence of a design-build process refined over 10+ years to eliminate setback surprises, Woodland Hills permit delays, and additions that look tacked on.

  • No-Obligation
  • Transparent Roadmap
  • Clear Timeline & Budget
Two-story house with a second-story addition over the garage, set among trees in Woodland Hills
Modern white kitchen with a dark wood island and wall ovens in our South Pasadena remodel
Open ADU living area with a blue kitchen island and a black sofa in our Tarzana ADU
  • 200+

    Happy customers across Los Angeles

  • Family-Owned

    And operated with owners on every job

  • 10+

    Years improving Los Angeles homes

  • Fully In-House

    Permits to finishes handled by one team

Planning an Addition

More Room That Looks Like It Was Always There

A bedroom, a suite, or a bigger kitchen, without leaving the home you love. The hard part is tying new space into old structure, legally. One in-house team carries it, including:

  • A feasibility review of setbacks, structure, and where to grow
  • Plans that tie new space into the original character
  • Permits and city approvals handled, with updates at every milestone
  • A defined scope, budget, and schedule before crews start
  • Finish work that makes the seam between old and new disappear

You gain the room your family needs. We make it feel original to the house.

Plan My Addition
Home addition at Whitaker Avenue in Northridge

Addition Types We Build

Choose the Space Your Home Is Missing

Every addition is designed to fit your lot, your budget, and the home you already love.

Learn moreLearn more

Why Choose Us

Discover Why 70%+ of Our Work Comes from Word of Mouth

One owner-led path connects scope, design, permits, construction, and final details.

Learn moreLearn more

Permits, Plans, and City Coordination

Los Angeles remodeling often means permits, plan check, inspections, and coordination with city requirements. We keep those steps connected to the design and construction plan so they do not become a separate burden for you.

  • We review permit needs early.
  • We coordinate plans and documentation with the remodel scope.
  • We treat inspections as part of the process, not an afterthought.
  • We connect design decisions to build requirements through one accountable team.
Get My Free Estimate

Scope Clarity Before Construction

Budget surprises usually begin with unclear scope. We help define the work, identify construction realities, and connect finish choices to the plan before the job is underway.

  • We discuss the scope before work begins.
  • We clarify material priorities early.
  • We surface potential cost drivers during planning.
  • We explain changes before moving forward.
Get My Free Estimate

A Schedule Based On Real Work

We organize the schedule around the real construction sequence: planning, ordering, permits, demolition, trades, inspections, finishes, and final details.

  • We connect milestones to actual work phases.
  • We coordinate trades through one accountable team.
  • We communicate delays and decisions clearly.
  • We include the final walkthrough in the schedule.
Get My Free Estimate

Communication Without Chasing

You should not have to chase a contractor to understand your own remodel. We keep decisions, milestones, and construction updates visible.

  • We provide regular updates during active work.
  • We clarify the decisions you need to make next.
  • We keep design and construction connected through one team.
  • Our owners stay involved through key project moments.
Get My Free Estimate

Addition Projects

Homes Their Owners Are Proud to Show

See what the Quality First commitment looks like in practice, from single room additions to full second stories.

See All ProjectsSee All Projects
Room addition used as a family room with a sectional, TV and exercise bike in Woodland Hills

01

Room Addition in Woodland Hills

  • Second-story addition constructed above the garage
  • Dedicated teen and family recreation loft
  • Exterior and roofline matched to the original home
  • Full roof replacement across the existing home and addition
  • Coordinated flooring and interior finish selections
Get My Free EstimateMore details
White kitchen with a blue island, glass pendants and a black faucet in our Los Angeles kitchen remodel

02

Kitchen Remodel & Room Addition in Los Angeles

    Get My Free EstimateMore details
    Riverside Terrace bathroom addition in Silver Lake

    03

    Bathroom Addition in Silver Lake

      Get My Free EstimateMore details
      Open kitchen with exposed ceiling beams, linen pendant lights and a wood dining table at the island

      04

      New Construction & Room Addition in Los Angeles

      • Arched openings and warm Spanish-inspired cabinetry
      • Peninsula island with built-in bench seating
      • Custom Dutch door connecting to the side yard
      • Modern plastered kitchen hood and fireplace
      • Built-in seating nook, custom cabinetry, and paneled appliances
      Get My Free EstimateMore details

      Our Story

      Eli Leads the Build. Donna Guides the Design.

      You work with an owner-led team that carries your plan from early choices through final details.

      Learn moreLearn more
      More about us
      Eli and Donna of Quality First Builders in a completed Los Angeles kitchen

      What That Means for Your Addition

      • One in-house path from plans and permits through final details.
      • Construction accountability led by Eli.
      • Design guidance connected to field needs.
      • One project record for scope and decisions.
      • Clear updates during active work.
      • Changes reviewed before related work continues.
      • A quality review and final walkthrough.

      Our Process

      A Clear Path From First Idea to Final Walkthrough

      One process links goals, design, permits, choices, construction, updates, and closeout.

      Learn moreLearn more
      1. Scope Review and Consultation

        We start with the space problem: who needs a room, and where the lot can give one. A feasibility review of setbacks, structure, and access sorts real options from wishes.

      2. Design, Scope, and Budget Planning

        The design ties new to old: matched rooflines, windows, and trim. Eli prices structure and systems early, so costs surface before commitments.

      3. Plans, Permits, and Schedule

        Additions need plans, structural review, and permits with the City of Los Angeles. We carry the file through city review and build the schedule around approval.

      4. Construction and Updates

        The build runs foundation to finishes in strict order, with our own crews and daily updates. The seam between old and new gets the most attention.

      5. Final Walkthrough and Completion

        The walkthrough tests the seam: floor, wall, and roof where new meets old. The addition should feel like it was always part of the house.

      FAQ

      Clear Answers Before You Commit

      Learn about project fit, proof, design, permits, updates, changes, and living through construction.

      Learn moreLearn more
      What Woodland Hills addition projects are a fit?

      From one added bedroom to a primary suite or a second story, meaningful additions fit. The business stays residential.

      What addition project proof can I review?

      Review selected addition work across Los Angeles on this page and in our gallery. Our Rozie Avenue room addition is right here in Woodland Hills. Each one shows the city, the scope, and the finished result.

      How do additions connect to the existing home?

      We review circulation, structure, systems, light, materials, and daily use before construction. A good addition reads as original architecture, and the roofline and foundation work decide that early.

      Will an addition add value?

      More usable square footage tends to matter, though we make no appraisal promises. The better question is whether the space fits how you live; that is where we help.

      Can one team handle design, permits, and construction?

      Yes. We are a licensed general contractor with design guidance in-house, connecting permits, scheduling, construction, inspections, and finishes.

      How do you define the scope?

      Goals, site conditions, setbacks, selections, and cost drivers get connected into a written estimate before crews start.

      How do permits affect timing?

      Review with the City of Los Angeles, inspections, site conditions, and owner decisions can affect timing. Additions usually need plans and structural review; we coordinate each step.

      What happens if hidden conditions appear?

      We review the condition and its effects before related work begins. Where new framing meets old, surprises are normal; experience keeps them manageable.

      Can we remain home during construction?

      Often yes, since much of the work starts outside the existing walls. It still depends on utilities, access, and the tie-in phase. We discuss the living plan before construction.

      What happens during the first consultation?

      We discuss project fit, your goals, the home, likely scope, and next steps. The advice draws on addition work across Calabasas and West Hills too.

      Free Consultation

      Plan Your Woodland Hills Home Addition

      Start with project fit and your goals. No construction commitment is made during the first conversation.

      Learn moreLearn more