Should You Hire an Architect for Your Home Remodel?

Written by
Eli Ezra, owner and general contractor at Quality First Builders
Eli EzraFounder and General Contractor
Published
Reading time13 min read

You usually need an architect for a remodel when the project changes the structure, footprint, roofline, exterior, or major layout of the home.

You usually do not need an architect for cosmetic updates, finish upgrades, or simple same-layout kitchen and bathroom remodels.

In Los Angeles, the practical trigger is whether the project needs permit drawings, plan check, structural review, or city approval. Removing a load-bearing wall, adding square footage, converting a garage, building an ADU, or changing the roofline will usually require professional plans. Replacing cabinets, counters, flooring, tile, fixtures, or paint usually will not.

At Quality First Builders, we take care of the planning and architectural drawings for you, then carry the project through permits and construction to the final finishes. You never have to hire an architect, an engineer and a general contractor separately and then keep them on the same page.

When You Usually Do Not Need an Architect

You usually do not need an architect when the remodel is mostly cosmetic and the layout stays the same.

Common examples include:

  • Painting
  • Flooring
  • Tile
  • Fixture replacement
  • Cabinet replacement
  • Countertop replacement
  • Same-location appliance replacement
  • Same-layout bathroom updates
  • Same-layout kitchen updates

The simple rule is this:

If you are not moving walls, changing openings, adding space, changing the roofline, or converting space into legal living area, you probably do not need an architect.

Los Angeles gives a useful example of this line. LADBS allows certain bathroom repair/remodel permits for replacing cabinets, flooring, wall finishes, tile, counters, and plumbing/electrical fixtures only when there are no wall or opening changes and no new plumbing or electrical fixture penetrations into existing walls. If wall or opening changes are involved, plan check and scaled existing/proposed floor plans are required.

The same basic rule appears in LADBS kitchen remodel guidance: simple replacement work may fit a combined permit path, but wall/opening changes or new plumbing/electrical penetrations require permits through an LADBS Construction Services Center, with plan check and scaled floor plans for wall/opening changes.

When You Usually Do Need an Architect

You usually need an architect, plans, or structural review when the remodel changes the house itself, not just the finishes.

Removing or Moving Walls

If a wall is load-bearing, removing it can affect the roof, ceiling, floor, and foundation. That is not a cosmetic change.

For a wall removal, the important question is not “Can a contractor knock this down?” The question is:

What is this wall carrying, and what has to replace it?

A structural engineer may be needed to size beams, posts, or supports. An architect may be needed if the wall removal also changes the layout, floor plan, or permit drawings.

This often comes up in open-concept kitchen remodels. Replacing cabinets in the same layout is one thing. Removing the wall between the kitchen and living room is a different project.

Adding Square Footage

Additions usually need plans because they change the home’s footprint, foundation, framing, roofline, and permits.

Examples include:

  • Bedroom addition
  • Kitchen bump-out
  • Primary suite addition
  • Family room addition
  • Rear addition

Even a small addition can affect setbacks, structural loads, roof tie-ins, drainage, energy rules, and the way the new space connects to the existing home.

If the project adds square footage, assume you need professional plans.

Moving a Kitchen or Bathroom

A same-layout kitchen or bathroom remodel usually does not need an architect.

Moving a kitchen or bathroom is different.

That kind of remodel can affect:

  • Plumbing
  • Drainage
  • Gas
  • Electrical
  • Ventilation
  • Waterproofing
  • Walls
  • Floor structure
  • Permits

A bathroom refresh might be simple. Moving a bathroom across the house is not.

A kitchen cabinet replacement might be simple. Moving the kitchen into the dining room is not.

Changing the Roofline, Exterior Doors, or Windows

Exterior and roof changes can affect structure, waterproofing, energy rules, and city review.

Examples include:

  • Larger windows
  • New patio doors
  • New exterior door
  • Skylights
  • Dormers
  • Vaulted ceilings
  • Roof shape changes

These changes are especially sensitive in hillside, historic, HPOZ, coastal, or design-sensitive areas of Los Angeles. In those cases, the issue is not only construction. The city may also care about exterior appearance, massing, safety, access, or extra review.

Garage Conversions, ADUs, and Second Stories

Garage conversions, ADUs, and second-story additions are not simple cosmetic remodels.

A garage conversion changes a non-living space into living space. That can involve insulation, egress, utilities, fire/life safety, ceiling height, ventilation, and habitability rules.

An ADU usually needs plans and code coordination. Even if you use a standard plan, the project still has to fit the property and pass the permit process.

A second-story addition is even more structural. The existing foundation, walls, framing, and roof system all have to be checked before adding a new level.

For these projects, start with a professional planning path before getting too deep into pricing or demolition.

The Los Angeles Permit Rule of Thumb

In Los Angeles, the question is often whether your remodel stays on the simple permit side or moves into plan check.

Project Type Likely Permit Path
Finish-only work, no wall/opening changes Simpler permit path may apply
Wall or opening changes Plan check and drawings are likely
Addition, ADU, garage conversion, second story Full plans are usually needed

LADBS says a permit is required for private-property construction, alteration, or repair work on buildings within the City of Los Angeles.

Some simple construction projects do not require plan review and can go through PermitLA. For projects that do require plan check, LADBS uses ePlanLA.

LADBS also explains the basic construction process as: get zoning/property information, design the project and draw plans, then submit plans and a permit application. If the work falls under Express Permit categories, plans do not need to be checked. Other projects may need separate approvals depending on scope.

For building permits, LADBS lists plan filing and approval before permit issuance for work such as new buildings, additions, structural alterations, interior modifications with floor plan changes, and changes of use or occupancy.

That is the practical line:

If the project changes only finishes, it may stay simple.

If it changes walls, openings, structure, square footage, or legal use, expect drawings and review.

Contractor or Architect: Who Should You Call First?

Most homeowners are really asking this:

“Do I call a contractor first, or do I need an architect before I do anything?”

Here is the simple version.

Call a Contractor First When the Work Is Simple

A general contractor mainly builds the project. They run the crews and the schedule, order the materials and book the inspections.

A contractor is usually the right first call for:

  • Flooring
  • Tile
  • Paint
  • Fixtures
  • Same-layout kitchen remodels
  • Same-layout bathroom remodels
  • Already-designed projects

If the layout is staying the same and the work is mostly finishes, you probably do not need to start with an architect.

Call an Architect First When the Project Changes the Home

An architect designs the remodel, prepares or coordinates drawings, and helps make sure the new layout works with the home, code, and permit process.

An architect is usually the right first call for:

  • Additions
  • Second stories
  • Major layout changes
  • Exterior changes
  • Roofline changes
  • Custom design
  • Projects that need permit drawings

California’s Architects Board says hiring an architect is generally recommended, but not every building project requires one. California law allows non-architects to prepare plans for some conventional wood-frame single-family homes and related structures, but if the work departs from conventional framing, the building official must require plans, drawings, specifications, or calculations prepared under a licensed architect or registered engineer.

So the answer is not always “architect or no architect.” Sometimes the answer is: simple contractor work, permit drawings, structural review, or full architectural planning.

Bring in Structural Review When the Question Is Structural

A structural engineer checks what the home needs to stay safe when walls, beams, floors, roofs, or foundations change.

This may apply to:

  • Load-bearing wall removal
  • Beams
  • Posts
  • Foundation changes
  • Second-story support
  • Major framing changes

You do not usually hire a structural engineer to design your dream layout. You bring one in when the remodel changes how the home carries weight.

Where Design-Build Fits

A design-build firm brings planning and construction under one team.

For many Los Angeles remodels, this is useful because design, budget, permits, and build feasibility are checked together before the project goes too far.

That matters because one of the most expensive mistakes is paying for detailed plans before anyone checks whether the design fits the budget.

What Happens When You Start With an Architect

The traditional route runs in three steps. You pay an architect for the blueprints. You take those plans to general contractors for bids. Then the winning bidder builds a design they had no hand in. Every handoff is a chance for the design and the budget to drift apart.

Kusum and Bharat in South Pasadena started their renovation that way. They started planning in 2018, hired an architect, interviewed three contractors and got through early planning. Then the pandemic hit and the project stalled. They signed with us in April 2021. We had their city permits within six months, and the whole remodel was finished less than six months after that.

Architectural plans often stop short of the finishes, too. Hannah and Joshua in West Hills came to us with their architectural plans already done. Those plans covered the architecture only, so Donna on our team helped them choose the flooring, cabinets, paint colors and light fixtures. If you go the architect route, budget for an interior designer or plan to make those calls yourself.

With us, one team handles design and construction, so we check your drawings against your budget while the design is still on paper. Our in-house designer is included on every project at no extra cost. Steve in Arcadia went through a few versions of the drawings with us until the plan felt right. Once the design was final, his permits were approved quickly and every inspection passed on the first try.

Simple First-Call Guide

Your Project First Call
Cosmetic update Contractor
Same-layout kitchen or bath Contractor
Removing a wall Contractor/design-build, then structural review if needed
Addition Architect or design-build firm
ADU or garage conversion Architect or design-build firm
Second story Architect/design-build plus structural engineer
Not sure what your project needs Design-build firm

The safest first call is the one that matches the risk of the project.

A same-layout bathroom does not need the same process as a second story. A cabinet replacement does not need the same process as an ADU. A wall removal does not need the same process as new tile.

How Much Does an Architect Cost for a Remodel?

Architect fees vary by scope, location, experience, and level of service.

AIA describes several common fee structures, including hourly, fixed fee, percentage of construction cost, design-bid-build, and design-build. For percentage-based fees, AIA gives common benchmarks of 8% to 15% for new construction and 15% to 20% for remodels. The final rate depends on how complex the project is and where it is.

Remodels can cost more as a percentage because existing homes come with more unknowns. Walls may hide old framing. Plumbing may not be where expected. Past additions may not be cleanly built. The design has to work with what is already there.

Smaller remodels may not need full architectural service. They may only need a contractor, designer, permit drawings, or structural review.

Possible soft costs include:

  • Design fee
  • Structural review
  • Permit drawings
  • Plan check fees
  • Permit fees
  • Revisions

The key is to match the service to the project.

Do not pay for a full architectural process if you only need a same-layout bathroom refresh. But do not treat a wall removal, addition, ADU, or second story like a cosmetic update.

How Long Do Plans and Permits Take?

Timelines vary because “plans and permits” are not one step.

Step What Happens
Design Decide layout and scope
Structural review Check walls, beams, foundation, or second-story support
Drawings Prepare plans for permit review
Plan check City reviews the plans
Corrections Plans are revised if needed
Permit approval Work can move forward

A simple project may move quickly. A major remodel can take much longer because there are more decisions, drawings, reviews, corrections, and inspections.

Houzz’s 2024 renovation study found that homeowners spend about twice as much time planning as building, across rooms. Kitchen renovations had the longest timeline in 2023, averaging 9.6 months of planning and 5.1 months of building.

That does not mean every kitchen remodel takes that long.

It means planning, drawings, pricing, decisions, and approvals often take longer than homeowners expect.

For Los Angeles homeowners, this is especially important. If your project needs plan check, structural review, ADU approval, hillside review, HPOZ review, or multiple correction rounds, the planning phase can be a major part of the project.

Final Answer: So, Do You Need an Architect?

You probably do not need an architect if your remodel is cosmetic, same-layout, and does not change walls, openings, structure, square footage, roofline, exterior form, or legal use.

You probably do need an architect, plans, or structural review if your remodel changes the structure, footprint, roofline, exterior openings, layout, or legal use of the home.

In Los Angeles, the practical question is whether the project triggers drawings, plan check, structural review, or extra city approval. If it does, get professional guidance before you start demolition or final design.

We handle Los Angeles remodels from the first plan to the final details. You do not have to coordinate a contractor, an architect, an engineer, a designer and the permit process on your own. At Quality First Builders, one experienced team answers for all of it.

FAQs

Do I need an architect for a kitchen remodel?

Usually no if the kitchen stays in the same layout. Usually yes, or at least plans and structural review, if you remove walls, move the kitchen, or change exterior openings.

Do I need an architect for a bathroom remodel?

Usually no for a same-layout bathroom refresh. More likely yes if you move walls, expand the bathroom, change openings, or relocate plumbing.

Do I need an architect to remove a wall?

Often yes, or at least structural review. If the wall is load-bearing, it can affect the roof, floor, ceiling, framing, and foundation.

Do I need an architect for an addition or ADU?

Usually yes. Additions and ADUs affect structure, layout, code, utilities, and permits. Even when a full-service architect is not required, professional plans and permit coordination are usually needed.

Should I call an architect or contractor first?

Call a contractor first for simple same-layout work. Call an architect or design-build firm first for additions, ADUs, major layout changes, roofline changes, exterior changes, or projects that need plans.

Can a design-build firm work from plans my architect already drew?

Yes. Send us your architectural and structural drawings before we meet. Eli reviews them and calls you back with a ballpark price, so you know where your budget stands before you sit through a round of bid meetings.